Nuclear Regulatory Commission June 2005 – Federal Register Recent Federal Regulation Documents

Revision of Fee Schedules; Fee Recovery for FY 2005
Document Number: 05-11495
Type: Rule
Date: 2005-06-10
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This document corrects a final rule appearing in the Federal Register on May 26, 2005 (70 FR 30526) concerning the licensing, inspection, and annual fees charged to NRC applicants and licensees in compliance with the Omnibus Budget Reconciliation Act of 1990, as amended. This action is necessary to correct typographical and printing errors.
Notice of Availability of Interim Staff Guidance Documents for Fuel Cycle Facilities
Document Number: E5-2919
Type: Notice
Date: 2005-06-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Nuclear Management Company, LLC, Point Beach Nuclear Plant, Units 1 and 2; Exemption
Document Number: E5-2915
Type: Notice
Date: 2005-06-08
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Sunshine Act Meeting
Document Number: 05-11350
Type: Notice
Date: 2005-06-07
Agency: Nuclear Regulatory Commission, Agencies and Commissions
List of Approved Spent Fuel Storage Casks: HI-STORM 100 Revision
Document Number: 05-11216
Type: Rule
Date: 2005-06-07
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The Nuclear Regulatory Commission (NRC) is amending its regulations to revise the Holtec International HI-STORM 100 cask system listing within the ``List of approved spent fuel storage casks'' to include Amendment No. 2 to Certificate of Compliance (CoC) Number 1014. Amendment No. 2 modifies the cask design to include changes to materials used in construction, changes to the types of fuel that can be loaded, changes to shielding and confinement methodologies and assumptions, revisions to various temperature limits, changes in allowable fuel enrichments, and other changes to reflect current NRC staff guidance and use of industry codes, under a general license.
Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request
Document Number: E5-2868
Type: Notice
Date: 2005-06-06
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a current valid OMB control number. 1. Type of submission, new, revision, or extension: Revision. 2. The title of the information collection: 10 CFR Part 20 Standards for Protection Against Radiation. 3. The form number if applicable: Not applicable. 4. How often the collection is required: Annually for most reports and at license termination for reports dealing with decommissioning. 5. Who will be required or asked to report: NRC licensees, including those requesting license termination. 6. An estimate of the number of responses: 5,019 (507 plus 4,512 recordkeepers). 7. The estimated number of annual respondents: 4,512. 8. An estimate of the number of hours needed annually to complete the requirement or request: 128,669 hours (4,909 hours for reporting [9.68 hours per response] plus 123,760 hours for recordkeeping [27.43 hours per recordkeeper]). 9. An indication of whether section 3507(d), Pub. L. 104-13 applies: Not applicable. 10. Abstract: 10 CFR part 20 establishes standards for protection against ionizing radiation resulting from activities conducted under licenses issued by the NRC. These standards require the establishment of radiation protection programs, maintenance of radiation records, recording of radiation received by workers, reporting of incidents which could cause exposure to radiation, submittal of an annual report to NRC of the results of individual monitoring, and submittal of license termination information. These mandatory requirements are needed to protect occupationally exposed individuals from undue risks of excessive exposure to ionizing radiation and to protect the health and safety of the public. A copy of the final supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F23, Rockville, MD 20852. OMB clearance requests are available at the NRC World Wide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by July 6, 2005. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date. John Asalone, Office of Information and Regulatory Affairs (3150- 0014), NEOB-10202, Office of Management and Budget, Washington, DC 20503. Comments can also be e-mailed to JohnA.Asalone@omb.eop.gov or submitted by telephone at (202) 395-4650. The NRC Clearance Officer is Brenda Jo. Shelton, 301-415-7233.
Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request
Document Number: E5-2867
Type: Notice
Date: 2005-06-06
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. 1. Type of submission, new, revision, or extension: Revision. 2. The title of the information collection: 10 CFR Part 100, ``Reactor Site Criteria''. 3. The form number if applicable: Not applicable. 4. How often the collection is required: As necessary in order for NRC to assess the adequacy of proposed seismic design bases and the design bases for other geological hazards for nuclear power and test reactors constructed and licensed in accordance with 10 CFR parts 50 and 52 and the Atomic Energy Act of 1954, as amended. 5. Who will be required or asked to report: Applicants and licensees for nuclear power and test reactors. 6. An estimate of the number of annual responses: 2. 7. The estimated number of annual respondents: .33 (1 respondent every 3 years). 8. An estimate of the total number of hours needed annually to complete the requirement or request: 8,711. 9. An indication of whether section 3507(d), Pub. L. 104-13 applies: Not applicable. 10. Abstract: 10 CFR part 100, ``Reactor Site Criteria,'' establishes approval requirements for proposed sites for the purpose of constructing and operating stationary power and testing reactors pursuant to the provisions of 10 CFR parts 50 or 52. These reactors are required to be sited, designed, constructed, and maintained to withstand geologic hazards, such as faulting, seismic hazards, and the maximum credible earthquake, to protect the health and safety of the public and the environment. Non-seismic siting criteria must also be evaluated. Non-seismic siting criteria include such factors as population density, the proximity of man-related hazards, and site atmospheric dispersion characteristics. NRC uses the information required by 10 CFR part 100 to evaluate whether natural phenomena and potential man-made hazards will be appropriately accounted for in the design of nuclear power and test reactors. A copy of the final supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC Worldwide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by July 6, 2005. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date. John A. Asalone, Office of Information and Regulatory Affairs (3150-0093), NEOB-10202, Office of Management and Budget, Washington, DC 20503. Comments can also be e-mailed to JohnA.Asalone@omb.eop.gov or submitted by telephone at (202) 395-4650. The NRC Clearance Officer is Brenda Jo. Shelton, 301-415-7233.
United States Geological Survey Triga Reactor Environmental Assessment and Finding of No Significant Impact
Document Number: E5-2849
Type: Notice
Date: 2005-06-03
Agency: Geological Survey, Department of the Interior, Nuclear Regulatory Commission, Agencies and Commissions
Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request
Document Number: E5-2847
Type: Notice
Date: 2005-06-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The NRC has recently submitted to OMB for review the following proposal for the collection of information under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35). The NRC hereby informs potential respondents that an agency may not conduct or sponsor, and that a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. 1. Type of submission, new, revision, or extension: Extension. 2. The title of the information collection: 10 CFR Part 75 Safeguards on Nuclear Material, Implementation of US/IAEA Agreement. 3. The form number if applicable: N/A. 4. How often the collection is required: Installation information is submitted upon written notification from the Commission. Changes are submitted as they occur. Nuclear material accounting and control information is submitted in accordance with specific instructions. 5. Who will be required or asked to report: All persons licensed or certified by the Commission or Agreement States to possess source or special nuclear material at an installation specified on the U.S. eligible facilities list as determined by the Secretary of State or his designee and filed with the Commission, as well as holders of construction permits and persons who intend to receive source material. 6. An estimate of the number of annual responses: 8. 7. The estimated number of annual respondents: Seven, one of which perform the reporting and recordkeeping and the other six perform the recordkeeping only. The NRC-licensed facilities selected for inspection will be reporting or updating design information. This one facility and the six facilities selected pursuant to a separate protocol will maintain transfer and material balance records, but reporting to the IAEA will be through the U.S. State system (Nuclear Materials Management and Safeguards System). 8. An estimate of the total number of hours needed annually to complete the requirement or request: 2,800 (.2 hours for reporting and 2,800 hours for recordkeeping [400 hours per recordkeeper]). 9. An indication of whether Section 3507(d), Public Law 104-13 applies: N/A. 10. Abstract: 10 CFR Part 75 establishes requirements to implement the agreement between the United States and the International Atomic Energy Agency (IAEA). Under that agreement, NRC is required to collect information and make it available to the IAEA. A copy of the final supporting statement may be viewed free of charge at the NRC Public Document Room, One White Flint North, 11555 Rockville Pike, Room O-1 F21, Rockville, MD 20852. OMB clearance requests are available at the NRC worldwide Web site: https:// www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC home page site for 60 days after the signature date of this notice. Comments and questions should be directed to the OMB reviewer listed below by July 5, 2005. Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received after this date. John Asalone, Office of Information and Regulatory Affairs (3150- 0055), NEOB-10202, Office of Management and Budget, Washington, DC 20503. Comments can also be e-mailed to JohnA.Asalone@ombeop.gov or submitted by telephone at (202) 395-3087. The NRC Clearance Officer is Brenda Jo. Shelton, 301-415-7233.
Receipt of Request for Action Under 10 CFR 2.206
Document Number: E5-2846
Type: Notice
Date: 2005-06-03
Agency: Nuclear Regulatory Commission, Agencies and Commissions
Broadening Scope of Access Authorization and Facility Security Clearance Regulations
Document Number: 05-10933
Type: Rule
Date: 2005-06-02
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The Nuclear Regulatory Commission (NRC or Commission) is amending its regulations to broaden the scope of the regulations applicable to persons who may require access to classified information, to include persons who may need access in connection with licensing and regulatory activities under the regulations that govern the disposal of high-level radioactive waste in geologic repositories, and persons who may need access in connection with other activities as the Commission may determine, such as vendors of advanced reactor designs. The Commission is also amending its regulations to broaden the scope of the regulations applicable to procedures for obtaining facility security clearances, to include persons who may need to use, process, store, reproduce, transmit, transport, or handle NRC classified information in connection with the above-identified activities. In addition, NRC is correcting the scope section of the regulations that govern access authorization for licensee personnel to include certificate holders and applicants for a certificate; clarifying the definition of ``license'' in the regulations that govern access authorization for licensee personnel and govern facility security clearance to include a reference to the regulations that govern combined licenses; correcting a typographical error in the definition of ``security container'' in its facility security regulations; and updating the references to Executive Order 12958 which has been amended.
Advisory Committee on Nuclear Waste, Meeting on Planning and Procedures; Notice of Meeting
Document Number: E5-2763
Type: Notice
Date: 2005-06-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
The Advisory Committee on Nuclear Waste; Notice of Meeting
Document Number: E5-2762
Type: Notice
Date: 2005-06-01
Agency: Nuclear Regulatory Commission, Agencies and Commissions
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.