Entergy Operations, Incorporated; Notice of Docketing of Request for Exemption for Arkansas Nuclear One, Unit 1 and Unit 2, 33533 [E5-2917]
Download as PDF
Federal Register / Vol. 70, No. 109 / Wednesday, June 8, 2005 / Notices
Steven D. Emslie; Permit No. 2006–
001.
Nadene G. Kennedy,
Permit Officer.
[FR Doc. 05–11387 Filed 6–7–05; 8:45 am]
BILLING CODE 7555–01–M
NATIONAL SCIENCE FOUNDATION
Notice of Permits Issued Under the
Antarctic Conservation Act of 1978
National Science Foundation.
Notice of permits issued under
the Antarctic Conservation Act of 1978,
Public Law 95–541.
AGENCY:
ACTION:
SUMMARY: The National Science
Foundation (NSF) is required to publish
notice of permits issued under the
Antarctic Conservation Act of 1978.
This is the required notice.
FOR FURTHER INFORMATION CONTACT:
Nadene G. Kennedy, Permit Office,
Office of Polar Programs, Rm. 755,
National Science Foundation, 4201
Wilson Boulevard, Arlington, VA 22230.
SUPPLEMENTARY INFORMATION: On April
5, 2005, the National Science
Foundation published a notice in the
Federal Register of a permit
applications received. Permits were
issued on May 17, 2005, to:
Tom Yelvington; Permit No. 2006–
003.
Natalie Goodall; Permit No. 2006–005.
Tom Yelvington; Permit No. 2006–
006.
Tom Yelvington; Permit No. 2006–
007.
Tom Yelvington; Permit No. 2006–
008.
Nadene G. Kennedy,
Permit Officer
[FR Doc. 05–11388 Filed 6–7–05; 8:45 am]
BILLING CODE 7555–01–M
NUCLEAR REGULATORY
COMMISSION
[Docket No 72–13]
Entergy Operations, Incorporated;
Notice of Docketing of Request for
Exemption for Arkansas Nuclear One,
Unit 1 and Unit 2
Nuclear Regulatory
Commission.
ACTION: Notice of request for exemption
from the requirements of 10 CFR
72.212(a)(2) and 10 CFR 72.214.
AGENCY:
FOR FURTHER INFORMATION CONTACT:
Christopher M. Regan, Senior Project
Manager, Spent Fuel Project Office,
VerDate jul<14>2003
18:08 Jun 07, 2005
Jkt 205001
Office of Nuclear Material Safety and
Safeguards, U.S. Nuclear Regulatory
Commission, Washington, DC 20555.
Telephone: (301) 415–1179; fax number:
(301) 415–1179; e-mail: cmr1@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
The U.S. Nuclear Regulatory
Commission (NRC or Commission) is
considering a request dated May 23,
2005, from Entergy Operations, Inc.
(applicant or Entergy Operations) for
exemption from the requirements of 10
CFR 72.212(a)(2) and 10 CFR 72.214
pursuant to 10 CFR 72.7, for the
Arkansas Nuclear One, Unit 1 (ANO–1)
and Unit 2 (ANO–2), facility located 6
miles west-northwest of Russellville,
Arkansas. If granted, the exemption will
authorize the applicant to load spent
nuclear fuel in accordance with
proposed Amendment 2 to Certificate of
Compliance (CoC) 1014 granted to
Holtec International (Holtec) for the HISTORM 100 system. This request was
docketed under 10 CFR Part 72; the
Independent Spent Fuel Storage
Installation Docket No. is 72–13.
An NRC administrative review,
documented in a letter to Entergy
Operations dated June 2, 2005, found
that the application contains sufficient
information for the NRC staff to begin its
technical review. Prior to issuance of
the requested exemption, the
Commission will have made the
findings required by the Atomic Energy
Act of 1954, as amended (the Act), and
the Commission’s regulations. These
findings will be documented in a Safety
Evaluation Report. The issuance of the
exemption will not be approved until
the NRC has reviewed the application
and has concluded that granting of the
request will not be inimical to the
common defense and security and will
not constitute an unreasonable risk to
the health and safety of the public. The
NRC will complete an environmental
assessment, in accordance with 10 CFR
part 51. This action will be the subject
of a subsequent notice in the Federal
Register.
II. Further Information
In accordance with 10 CFR 2.390 of
NRC’s ‘‘Rules of Practice,’’ final NRC
records and documents regarding this
proposed action, including the
exemption request dated May 23, 2005,
are publically available in the records
component of NRC’s Agencywide
Documents Access and Management
System (ADAMS). These documents
may be inspected at NRC’s Public
Electronic Reading Room at https://
www.nrc.gov/reading-rm/adams.html.
These documents may also be viewed
PO 00000
Frm 00093
Fmt 4703
Sfmt 4703
33533
electronically on the public computers
located at the NRC’s Public Document
Room (PDR), O1F21, One White Flint
North, 11555 Rockville Pike, Rockville,
MD 20852. The PDR reproduction
contractor will copy documents for a
fee. Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS, should contact the NRC PDR
Reference staff by telephone at 1–800–
397–4209 or (301) 415–4737, or by email to pdr@nrc.gov.
Dated at Rockville, Maryland, this 2nd day
of June 2005.
For the Nuclear Regulatory Commission.
Christopher M. Regan,
Senior Project Manager, Spent Fuel Project
Office, Office of Nuclear Material Safety and
Safeguards.
[FR Doc. E5–2917 Filed 6–7–05; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. 50–255]
Nuclear Management Company, LLC,
Palisades Nuclear Plant; Notice of
Acceptance for Docketing of the
Application and Notice of Opportunity
for Hearing Regarding Renewal of
Facility Operating License No. DPR–20
for an Additional 20-Year Period
The U.S. Nuclear Regulatory
Commission (NRC or the Commission)
is considering application for the
renewal of Operating License No. DPR–
20, which authorizes the Nuclear
Management Company, LLC, to operate
the Palisades Nuclear Plant at 2530
megawatts thermal. The renewed
license would authorize the applicant to
operate the Palisades Nuclear Plant, for
an additional 20 years beyond the
period specified in the current license.
The current Operating License for the
Palisades Nuclear Plant expires on
March 24, 2011.
The Commission’s staff has received
an application dated March 22, 2005
and a supplement dated May 5, 2005,
from Nuclear Management Company,
LLC, pursuant to 10 CFR Part 54, to
renew the operating license DPR–20 for
the Palisades Nuclear Plant. A Notice of
Receipt and Availability of the license
renewal application, ‘‘Nuclear
Management Company, LLC; Palisades
Nuclear Plant; Notice of Receipt and
Availability of Application for Renewal
Facility Operating License No. DPR–20
for an Additional 20-Year Period,’’ was
published in the Federal Register on
April 12, 2005.
E:\FR\FM\08JNN1.SGM
08JNN1
Agencies
[Federal Register Volume 70, Number 109 (Wednesday, June 8, 2005)]
[Notices]
[Page 33533]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E5-2917]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No 72-13]
Entergy Operations, Incorporated; Notice of Docketing of Request
for Exemption for Arkansas Nuclear One, Unit 1 and Unit 2
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of request for exemption from the requirements of 10 CFR
72.212(a)(2) and 10 CFR 72.214.
-----------------------------------------------------------------------
FOR FURTHER INFORMATION CONTACT: Christopher M. Regan, Senior Project
Manager, Spent Fuel Project Office, Office of Nuclear Material Safety
and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC
20555. Telephone: (301) 415-1179; fax number: (301) 415-1179; e-mail:
cmr1@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Introduction
The U.S. Nuclear Regulatory Commission (NRC or Commission) is
considering a request dated May 23, 2005, from Entergy Operations, Inc.
(applicant or Entergy Operations) for exemption from the requirements
of 10 CFR 72.212(a)(2) and 10 CFR 72.214 pursuant to 10 CFR 72.7, for
the Arkansas Nuclear One, Unit 1 (ANO-1) and Unit 2 (ANO-2), facility
located 6 miles west-northwest of Russellville, Arkansas. If granted,
the exemption will authorize the applicant to load spent nuclear fuel
in accordance with proposed Amendment 2 to Certificate of Compliance
(CoC) 1014 granted to Holtec International (Holtec) for the HI-STORM
100 system. This request was docketed under 10 CFR Part 72; the
Independent Spent Fuel Storage Installation Docket No. is 72-13.
An NRC administrative review, documented in a letter to Entergy
Operations dated June 2, 2005, found that the application contains
sufficient information for the NRC staff to begin its technical review.
Prior to issuance of the requested exemption, the Commission will have
made the findings required by the Atomic Energy Act of 1954, as amended
(the Act), and the Commission's regulations. These findings will be
documented in a Safety Evaluation Report. The issuance of the exemption
will not be approved until the NRC has reviewed the application and has
concluded that granting of the request will not be inimical to the
common defense and security and will not constitute an unreasonable
risk to the health and safety of the public. The NRC will complete an
environmental assessment, in accordance with 10 CFR part 51. This
action will be the subject of a subsequent notice in the Federal
Register.
II. Further Information
In accordance with 10 CFR 2.390 of NRC's ``Rules of Practice,''
final NRC records and documents regarding this proposed action,
including the exemption request dated May 23, 2005, are publically
available in the records component of NRC's Agencywide Documents Access
and Management System (ADAMS). These documents may be inspected at
NRC's Public Electronic Reading Room at https://www.nrc.gov/reading-rm/
adams.html. These documents may also be viewed electronically on the
public computers located at the NRC's Public Document Room (PDR),
O1F21, One White Flint North, 11555 Rockville Pike, Rockville, MD
20852. The PDR reproduction contractor will copy documents for a fee.
Persons who do not have access to ADAMS or who encounter problems in
accessing the documents located in ADAMS, should contact the NRC PDR
Reference staff by telephone at 1-800-397-4209 or (301) 415-4737, or by
e-mail to pdr@nrc.gov.
Dated at Rockville, Maryland, this 2nd day of June 2005.
For the Nuclear Regulatory Commission.
Christopher M. Regan,
Senior Project Manager, Spent Fuel Project Office, Office of Nuclear
Material Safety and Safeguards.
[FR Doc. E5-2917 Filed 6-7-05; 8:45 am]
BILLING CODE 7590-01-P