Federal Railroad Administration September 8, 2011 – Federal Register Recent Federal Regulation Documents

Notice of the Extension of the Comment Period for the Draft Environmental Impact Report/Environmental Impact Statement for the California High-Speed Train Project Fresno to Bakersfield Section
Document Number: 2011-23015
Type: Notice
Date: 2011-09-08
Agency: Federal Railroad Administration, Department of Transportation
FRA is issuing this notice to advise the public that the comment period for the Draft Environmental Impact Report (EIR)/ Environmental Impact Statement (EIS) that has been prepared for the California High-Speed Train (HST) Project Fresno to Bakersfield Section (Project) has been extended and shall now end on October 13, 2011. This decision was made by the Authority and FRA in response to requests for an extension of the comment period. FRA is the lead federal agency and the California High-Speed Rail Authority (Authority) is the lead state agency for the environmental review process. The Authority plans to construct and operate a fully grade- separated, dedicated double-track, electric powered, passenger rail, high-speed railroad along a 114-mile corridor between Fresno and Bakersfield, CA. The Project includes stations in downtown Fresno and Bakersfield, and a possible Kings/Tulare Regional Station east of Hanford, CA. A heavy maintenance facility for assembly, testing, and commissioning of trains, train inspection and service, and train overhaul may be constructed in the Fresno to Bakersfield Section. The Draft EIR/EIS presents the Project's purpose and need, identifies all reasonable alternatives including track alignments, stations, and heavy maintenance facilities as well as the no action alternative, describes the affected environment, analyzes the potential environmental impacts of all the reasonable alternatives and the no action alternative, and identifies appropriate mitigation measures to minimize the potential environmental impacts.
Notice of the Extension of the Comment Period for the Draft Environmental Impact Report/Environmental Impact Statement for the California High-Speed Rail Project Merced to Fresno Section
Document Number: 2011-23013
Type: Notice
Date: 2011-09-08
Agency: Federal Railroad Administration, Department of Transportation
FRA is issuing this notice to advise the public that the comment period for the Draft Environmental Impact Report (EIR)/ Environmental Impact Statement (EIS) that has been prepared for the California High-Speed Train (HST) Project Merced to Fresno Section (Project) has been extended and shall now end on October 13, 2011. This decision was made by the Authority and FRA in response to requests for extension of the comment period. FRA is the lead federal agency and the California High-Speed Rail Authority (Authority) is the lead state agency for the environmental review process. The Authority proposes to construct and operate a reliable high- speed electric-powered passenger train system along an approximately 65-mile corridor, from Merced, CA, to Fresno, CA that links those cities by delivering predictable and consistent travel times. The Project includes high-speed track alignments, stations in downtown Merced and Fresno. A heavy maintenance facility for assembly, testing, and commissioning of trains, train inspection and service, and train overhaul may be constructed in the Merced to Fresno Section. The Draft EIR/EIS presents the Project's purpose and need, identifies all reasonable alternatives including track alignments, stations, and heavy maintenance facilities as well as the no action alternative, describes the affected environment, analyzes the potential environmental impacts of all the reasonable alternatives and the no action alternative, and identifies appropriate mitigation measures to minimize the potential environmental impacts.
Systems for Telephonic Notification of Unsafe Conditions at Highway-Rail and Pathway Grade Crossings
Document Number: 2011-23008
Type: Proposed Rule
Date: 2011-09-08
Agency: Federal Railroad Administration, Department of Transportation
On March 4, 2011, FRA published a notice of proposed rulemaking that would require certain railroads to develop a system for telephonic notification of unsafe conditions at highway-rail and pathway grade crossings. FRA is announcing a public hearing to provide interested persons an opportunity to provide comments on the proposal and to discuss further development of the regulation. The Rail Safety Improvement Act of 2008 requires the development and implementation of these telephonic notification systems.
Proposed Agency Information Collection Activities; Comment Request
Document Number: 2011-23007
Type: Notice
Date: 2011-09-08
Agency: Federal Railroad Administration, Department of Transportation
In accordance with the Paperwork Reduction Act of 1995 and its implementing regulations, the Federal Railroad Administration (FRA) hereby announces that it is seeking renewal of the following currently approved information collection activities. Before submitting these information collection requirements for clearance by the Office of Management and Budget (OMB), FRA is soliciting public comment on specific aspects of the activities identified below.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.