Federal Emergency Management Agency December 28, 2012 – Federal Register Recent Federal Regulation Documents

Changes in Flood Hazard Determinations
Document Number: 2012-31321
Type: Notice
Date: 2012-12-28
Agency: Federal Emergency Management Agency, Department of Homeland Security
New or modified Base (1% annual-chance) Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, and/or the regulatory floodway (hereinafter referred to as flood hazard determinations) as shown on the indicated Letter of Map Revision (LOMR) for each of the communities listed in the table below are finalized. Each LOMR revises the Flood Insurance Rate Maps (FIRMs), and in some cases the Flood Insurance Study (FIS) reports, currently in effect for the listed communities. The flood hazard determinations modified by each LOMR will be used to calculate flood insurance premium rates for new buildings and their contents.
Proposed Flood Hazard Determinations
Document Number: 2012-31305
Type: Notice
Date: 2012-12-28
Agency: Federal Emergency Management Agency, Department of Homeland Security
Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report, once effective, will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings.
Changes in Flood Hazard Determinations
Document Number: 2012-31303
Type: Notice
Date: 2012-12-28
Agency: Federal Emergency Management Agency, Department of Homeland Security
New or modified Base (1% annual-chance) Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, and/or the regulatory floodway (hereinafter referred to as flood hazard determinations) as shown on the indicated Letter of Map Revision (LOMR) for each of the communities listed in the table below are finalized. Each LOMR revises the Flood Insurance Rate Maps (FIRMs), and in some cases the Flood Insurance Study (FIS) reports, currently in effect for the listed communities. The flood hazard determinations modified by each LOMR will be used to calculate flood insurance premium rates for new buildings and their contents.
Changes in Flood Hazard Determinations
Document Number: 2012-31300
Type: Notice
Date: 2012-12-28
Agency: Federal Emergency Management Agency, Department of Homeland Security
New or modified Base (1% annual-chance) Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, and/or the regulatory floodway (hereinafter referred to as flood hazard determinations) as shown on the indicated Letter of Map Revision (LOMR) for each of the communities listed in the table below are finalized. Each LOMR revises the Flood Insurance Rate Maps (FIRMs), and in some cases the Flood Insurance Study (FIS) reports, currently in effect for the listed communities. The flood hazard determinations modified by each LOMR will be used to calculate flood insurance premium rates for new buildings and their contents.
Final Flood Elevation Determinations
Document Number: 2012-31289
Type: Rule
Date: 2012-12-28
Agency: Federal Emergency Management Agency, Department of Homeland Security
Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).
Agency Information Collection Activities: Proposed Collection; Application for Community Disaster Loan Cancellation; Comment Request
Document Number: 2012-31219
Type: Notice
Date: 2012-12-28
Agency: Federal Emergency Management Agency, Department of Homeland Security
The Federal Emergency Management Agency, as part of its continuing effort to reduce paperwork and respondent burden, invites the general public and other Federal agencies to take this opportunity to comment on an extension of a currently approved collection. In accordance with the Paperwork Reduction Act of 1995, this notice seeks comments concerning Community Disaster Loans (CDLs) offered to local governments that have suffered substantial losses of taxes or other revenues as a result of a major disaster or emergency. FEMA shall cancel repayment of all or part of a Community Disaster Loan if, as a result of the disaster, the revenues of the local government during the full three fiscal year period following the disaster are insufficient to meet the local government's operating budget.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.