Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NSPS for Magnetic Tape Coating Facilities (Renewal)
The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), NSPS for Magnetic Tape Coating Facilities (EPA ICR Number 1135.13, OMB Control Number 2060-0171), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through January 31, 2020. Public comments were previously requested, via the Federal Register, on May 6, 2019 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NSPS for Secondary Brass and Bronze Production, Primary Copper Smelters, Primary Zinc Smelters, Primary Lead Smelters, Primary Aluminum Reduction Plants, and Ferroalloy Production Facilities (Renewal)
The Environmental Protection Agency has submitted an information collection request (ICR), NSPS for Secondary Brass and Bronze Production, Primary Copper Smelters, Primary Zinc Smelters, Primary Lead Smelters, Primary Aluminum Reduction Plants, and Ferroalloy Production Facilities (EPA ICR Number 1604.12, OMB Control Number 2060-0110), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through January 31, 2020. Public comments were previously requested, via the Federal Register, on May 6, 2019 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Air Plan Approval; GA; Miscellaneous Revisions
The Environmental Protection Agency (EPA) is approving State Implementation Plan (SIP) revisions submitted by the State of Georgia, through the Georgia Environmental Protection Division (GA EPD) of the Department of Natural Resources, in letters dated September 19, 2006, with a clarification submitted on November 6, 2006, and July 31, 2018. EPA is approving miscellaneous changes to several Georgia rules. This action is being finalized pursuant to the Clean Air Act (CAA or Act) and its implementing regulations.
Approval and Promulgation of State Plans for Designated Facilities and Pollutants; West Virginia; Control of Emissions From Existing Municipal Solid Waste Landfills
The Environmental Protection Agency (EPA) is approving a Clean Air Act (CAA) section 111(d) plan submitted by the West Virginia Department of Environmental Protection (WVDEP). This plan was submitted to fulfill the requirements of the CAA and in response to EPA's promulgation of Emissions Guidelines and Compliance Times for municipal solid waste (MSW) landfills. The West Virginia plan establishes emission limits for existing MSW landfills, and provides for the implementation and enforcement of those limits.
Air Plan Approval; Arizona; Maricopa County Air Quality Department
The Environmental Protection Agency (EPA) is taking final action to approve revisions to the Maricopa County Air Quality Department (MCAQD) portion of the Arizona State Implementation Plan (SIP). These revisions concern emissions of volatile organic compounds (VOCs) and particulate matter (PM) from brick and structural clay products manufacturing, rubber sports ball manufacturing, and vegetable oil extraction processes. We are approving the rescission of local rules that regulate these emission sources under the Clean Air Act (CAA or the Act).
Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category
The Environmental Protection Agency (the EPA or the Agency) is proposing a regulation to revise the technology-based effluent limitations guidelines and standards (ELGs) for the steam electric power generating point source category applicable to flue gas desulfurization (FGD) wastewater and bottom ash (BA) transport water. This proposal is estimated to save approximately $175 million dollars annually in pre-tax compliance costs and $137 million dollars annually in social costs as a result of less costly FGD wastewater technologies that could be used with the proposed relaxation of the Steam Electric Power Generating Effluent Guidelines 2015 rule (the 2015 rule) selenium limitation; less costly BA transport water technologies made possible by the proposed relaxation of the 2015 rule's zero discharge limitations; a two-year extension of compliance timeframes for meeting FGD wastewater limits, and additional proposed subcategories for both FGD wastewater and BA transport water. EPA also believes that participation in the voluntary incentive program would further reduce the pollutants that these steam electric facilities discharge in FGD wastewater by approximately 105 million pounds per year.