Environmental Impact Statements; Notice of Availability, 64520-64521 [2019-25377]
Download as PDF
64520
Federal Register / Vol. 84, No. 226 / Friday, November 22, 2019 / Notices
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. ID–7658–001]
Combined Notice of Filings 1
khammond on DSKJM1Z7X2PROD with NOTICES
Malandro, Michael E.; Notice of Filing
Take notice that on November 15,
2019, Michael E. Malandro, submitted
for filing, application for authority to
hold interlocking positions, pursuant to
section 305(b) of the Federal Power Act,
16 U.S.C. 825d (b), Part 45 of the
Federal Energy Regulatory
Commission’s Rules of Practice and
Procedure, 18 CFR part 45.8 (2019), and
Order No. 664, 112 FERC 61,298 (2005).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
eFiling link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the eLibrary
link and is available for electronic
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on December 6, 2019.
Dated: November 18, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–25399 Filed 11–21–19; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:57 Nov 21, 2019
Jkt 250001
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP20–227–000.
Applicants: Elba Express Company,
L.L.C.
Description: § 4(d) Rate Filing: EEC
Housekeeping Filing—2019 to be
effective 1/1/2020.
Filed Date: 11/13/19.
Accession Number: 20191113–5017.
Comments Due: 5 p.m. ET 11/25/19.
Docket Numbers: RP20–228–000.
Applicants: Discovery Gas
Transmission LLC.
Description: § 4(d) Rate Filing: 2020
HMRE Surcharge Filing to be effective
1/1/2020.
Filed Date: 11/14/19.
Accession Number: 20191114–5019.
Comments Due: 5 p.m. ET 11/26/19.
Docket Numbers: RP20–229–000.
Applicants: Kern River Gas
Transmission Company.
Description: § 4(d) Rate Filing: 2019
ConocoPhillips Amendment to be
effective 11/15/2019.
Filed Date: 11/14/19.
Accession Number: 20191114–5036.
Comments Due: 5 p.m. ET 11/26/19.
Docket Numbers: RP20–230–000.
Applicants: Columbia Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: TCO
Equinor Neg Rate Amendment to be
effective 11/14/2019.
Filed Date: 11/14/19.
Accession Number: 20191114–5103.
Comments Due: 5 p.m. ET 11/26/19.
Docket Numbers: RP20–231–000.
Applicants: Gulf South Pipeline
Company, LP.
Description: § 4(d) Rate Filing: Filing
to incorporate approved changes and
clean-up item to be effective 12/15/
2019.
Filed Date: 11/15/19.
Accession Number: 20191115–5031.
Comments Due: 5 p.m. ET 11/27/19.
Docket Numbers: RP20–232–000.
Applicants: Dominion Energy Cove
Point LNG, LP.
Description: § 4(d) Rate Filing:
DECP—Negotiated Rate and NonConforming Service Agreement to be
effective 12/15/2019.
Filed Date: 11/15/19.
Accession Number: 20191115–5156.
Comments Due: 5 p.m. ET 11/27/19.
The filings are accessible in the
Commission’s eLibrary system by
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 18, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–25398 Filed 11–21–19; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9048–1]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information 202–
564–5632 or https://www.epa.gov/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 11/11/2019 10 a.m. ET Through
11/18/2019 10 a.m. ET
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
cdxnodengn.epa.gov/cdx-enepa-public/
action/eis/search.
EIS No. 20190274, Draft, BIA, OK, Osage
County Oil and Gas Draft
Environmental Impact Statement,
Comment Period Ends: 01/06/2020,
Contact: Mosby Halterman 918–781–
4660
EIS No. 20190275, Final, USFS, CA,
Squaw Valley-Alpine Meadows Baseto-Base Gondola Project, Review
Period Ends: 12/23/2019, Contact: Joe
Flannery 530–478–6205
EIS No. 20190276, Final, FERC, OR,
Jordan Cove Energy Project, Review
Period Ends: 12/23/2019, Contact:
Office of External Affairs 866–208–
3372
E:\FR\FM\22NON1.SGM
22NON1
Federal Register / Vol. 84, No. 226 / Friday, November 22, 2019 / Notices
EIS No. 20190277, Final, BLM, WA, San
Juan Islands National Monument
Proposed Resource Management Plan
and Final Environmental Impact
Statement, Review Period Ends: 12/
23/2019, Contact: Lauren Pidot 503–
808–6297
EIS No. 20190278, Draft, BLM, AK,
National Petroleum Reserve in Alaska
Integrated Activity Plan and
Environmental Impact Statement,
Comment Period Ends: 01/21/2020,
Contact: Stephanie Rice 907–271–
3202
EIS No. 20190279, Draft, USACE, CO,
Halligan Water Supply Project,
Comment Period Ends: 01/27/2020,
Contact: Cody Wheeler 720–922–3846
EIS No. 20190280, Draft, USACE, LA,
South Central Coast Louisiana Draft
Feasibility Study with Integrated
Environmental Impact Statement,
Comment Period Ends: 01/06/2020,
Contact: Joe Jordan 309–794–5791
Dated: November 18, 2019.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2019–25377 Filed 11–21–19; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2013–0318; FRL—10002–
50–OMS]
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request; NSPS
for Magnetic Tape Coating Facilities
(Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) has submitted an
information collection request (ICR),
NSPS for Magnetic Tape Coating
Facilities (EPA ICR Number 1135.13,
OMB Control Number 2060–0171), to
the Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act. This is a proposed
extension of the ICR, which is currently
approved through January 31, 2020.
Public comments were previously
requested, via the Federal Register, on
May 6, 2019 during a 60-day comment
period. This notice allows for an
additional 30 days for public comments.
A fuller description of the ICR is given
below, including its estimated burden
and cost to the public. An agency may
neither conduct nor sponsor, and a
person is not required to respond to, a
khammond on DSKJM1Z7X2PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
16:57 Nov 21, 2019
Jkt 250001
collection of information unless it
displays a currently valid OMB control
number.
DATES: Additional comments may be
submitted on or before December 23,
2019.
ADDRESSES: Submit your comments,
referencing Docket ID Number EPA–
HQ–OECA–2013–0318, to: (1) EPA
online using www.regulations.gov (our
preferred method), or by email to
docket.oeca@epa.gov, or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW,
Washington, DC 20460; and (2) OMB via
email to oira_submission@omb.eop.gov.
Address comments to OMB Desk Officer
for EPA.
EPA’s policy is that all comments
received will be included in the public
docket without change, including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI), or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Patrick Yellin, Monitoring, Assistance,
and Media Programs Division, Office of
Compliance, Mail Code 2227A,
Environmental Protection Agency, 1200
Pennsylvania Ave. NW, Washington, DC
20460; telephone number: (202) 564–
2970; fax number: (202) 564–0050;
email address: yellin.patrick@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents, which explain
in detail the information that the EPA
will be collecting, are available in the
public docket for this ICR. The docket
can be viewed online at
www.regulations.gov, or in person at the
EPA Docket Center, WJC West, Room
3334, 1301 Constitution Ave. NW,
Washington, DC. The telephone number
for the Docket Center is 202–566–1744.
For additional information about EPA’s
public docket, visit: https://
www.epa.gov/dockets.
Abstract: The New Source
Performance Standards (NSPS) for NSPS
for Magnetic Tape Coating Facilities (40
CFR part 60, subpart SSS) apply to each
new and existing coating operation and
coating mixing equipment at magnetic
tape coating facilities for which
construction, modification, or
reconstruction began after January 22,
1986. New facilities include those that
commenced construction, modification
or reconstruction after the date of
proposal. This information is being
collected to assure compliance with 40
CFR part 60, subpart SSS.
In general, all NSPS standards require
initial notifications, performance tests,
PO 00000
Frm 00069
Fmt 4703
Sfmt 4703
64521
and periodic reports by the owners/
operators of the affected facilities. They
are also required to maintain records of
the occurrence and duration of any
startup, shutdown, or malfunction in
the operation of an affected facility, or
any period during which the monitoring
system is inoperative. These
notifications, reports, and records are
essential in determining compliance,
and are required of all affected facilities
subject to NSPS.
Form Numbers: None.
Respondents/affected entities:
Magnetic tape coating facilities.
Respondent’s obligation to respond:
Mandatory (40 CFR part 60, subpart
SSS).
Estimated number of respondents: 6
(total).
Frequency of response: Initially,
quarterly, and semiannually.
Total estimated burden: 2,030 hours
(per year). Burden is defined at 5 CFR
1320.3(b).
Total estimated cost: $321,000 (per
year), includes $86,400 in annualized
capital and/or operation & maintenance
costs.
Changes in the Estimates: There is no
change in the labor hours in this ICR
compared to the previous ICR. This is
due to two considerations. First, the
regulations have not changed over the
past three years and are not anticipated
to change over the next three years.
Secondly, the growth rate for the
industry is very low, negative or nonexistent, so there is no significant
change in the overall burden.
Courtney Kerwin,
Director, Regulatory Support Division.
[FR Doc. 2019–25410 Filed 11–21–19; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OECA–2013–0334; FRL—10002–
47–OMS]
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request; NSPS
for Secondary Brass and Bronze
Production, Primary Copper Smelters,
Primary Zinc Smelters, Primary Lead
Smelters, Primary Aluminum
Reduction Plants, and Ferroalloy
Production Facilities (Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency has submitted an information
collection request (ICR), NSPS for
SUMMARY:
E:\FR\FM\22NON1.SGM
22NON1
Agencies
[Federal Register Volume 84, Number 226 (Friday, November 22, 2019)]
[Notices]
[Pages 64520-64521]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2019-25377]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9048-1]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information 202-564-5632 or https://www.epa.gov/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 11/11/2019 10 a.m. ET Through 11/18/2019 10 a.m. ET
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://cdxnodengn.epa.gov/cdx-enepa-public/action/eis/search.
EIS No. 20190274, Draft, BIA, OK, Osage County Oil and Gas Draft
Environmental Impact Statement, Comment Period Ends: 01/06/2020,
Contact: Mosby Halterman 918-781-4660
EIS No. 20190275, Final, USFS, CA, Squaw Valley-Alpine Meadows Base-to-
Base Gondola Project, Review Period Ends: 12/23/2019, Contact: Joe
Flannery 530-478-6205
EIS No. 20190276, Final, FERC, OR, Jordan Cove Energy Project, Review
Period Ends: 12/23/2019, Contact: Office of External Affairs 866-208-
3372
[[Page 64521]]
EIS No. 20190277, Final, BLM, WA, San Juan Islands National Monument
Proposed Resource Management Plan and Final Environmental Impact
Statement, Review Period Ends: 12/23/2019, Contact: Lauren Pidot 503-
808-6297
EIS No. 20190278, Draft, BLM, AK, National Petroleum Reserve in Alaska
Integrated Activity Plan and Environmental Impact Statement, Comment
Period Ends: 01/21/2020, Contact: Stephanie Rice 907-271-3202
EIS No. 20190279, Draft, USACE, CO, Halligan Water Supply Project,
Comment Period Ends: 01/27/2020, Contact: Cody Wheeler 720-922-3846
EIS No. 20190280, Draft, USACE, LA, South Central Coast Louisiana Draft
Feasibility Study with Integrated Environmental Impact Statement,
Comment Period Ends: 01/06/2020, Contact: Joe Jordan 309-794-5791
Dated: November 18, 2019.
Robert Tomiak,
Director, Office of Federal Activities.
[FR Doc. 2019-25377 Filed 11-21-19; 8:45 am]
BILLING CODE 6560-50-P