Environmental Protection Agency September 29, 2017 – Federal Register Recent Federal Regulation Documents

EPA Smart Sectors Program Launch
Document Number: C1-2017-20310
Type: Notice
Date: 2017-09-29
Agency: Environmental Protection Agency
Approval of Implementation Plans; State of Iowa; Elements of Infrastructure SIP Requirements for the 2010 Sulfur Dioxide National Ambient Air Quality Standard (NAAQS)
Document Number: 2017-20965
Type: Proposed Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve elements of a State Implementation Plan (SIP) submission from the State of Iowa for the 2010 Sulfur Dioxide (SO2) National Ambient Air Quality Standard (NAAQS). Infrastructure SIPs address the applicable requirements of Clean Air Act (CAA) section 110, which requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each new or revised NAAQS promulgated by the EPA. These SIPs are commonly referred to as ``infrastructure'' SIPs. The infrastructure requirements are designed to ensure that the structural components of each state's air quality management program are adequate to meet the state's responsibilities under the CAA. In the ``Rules and Regulations'' section of this issue of the Federal Register, we are approving the state's SIP revisions as a direct final rule without a prior proposed rule. If we receive no adverse comment, we will not take further action on this proposed rule.
Approval of Implementation Plans; State of Iowa; Elements of the Infrastructure SIP Requirements for the 2010 Sulfur Dioxide National Ambient Air Quality Standard (NAAQS)
Document Number: 2017-20964
Type: Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking direct final action to approve elements of a State Implementation Plan (SIP) submission, and an amended SIP submission from the State of Iowa for the 2010 Sulfur Dioxide (SO2) National Ambient Air Quality Standard (NAAQS). Infrastructure SIPs address the applicable requirements of Clean Air Act (CAA) section 110, which requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each new or revised NAAQS promulgated by the EPA. These SIPs are commonly referred to as ``infrastructure'' SIPs. The infrastructure requirements are designed to ensure that the structural components of each state's air quality management program are adequate to meet the state's responsibilities under the CAA.
Approval of California Air Plan Revisions; Anti-Idling Regulations
Document Number: 2017-20963
Type: Proposed Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve a revision to the California State Implementation Plan (SIP). This revision concerns emissions of volatile organic compounds (VOCs), oxides of nitrogen (NOX) and particulate matter (PM) from the idling of diesel-powered trucks. We are proposing to approve portions of a state rule to regulate these emission sources under the Clean Air Act (CAA or the Act). We are taking comments on this proposal and plan to follow with a final action.
Environmental Impact Statements; Notice of Availability
Document Number: 2017-20938
Type: Notice
Date: 2017-09-29
Agency: Environmental Protection Agency
Approval and Promulgation of Air Quality Implementation Plans; Maryland; Nonattainment New Source Review Requirements for the 2008 8-Hour Ozone Standard
Document Number: 2017-20837
Type: Proposed Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) proposes to approve the state implementation plan (SIP) revision submitted by the Maryland Department of the Environment (MDE) on behalf of the State of Maryland in response to EPA's February 3, 2017 Findings of Failure to Submit for various requirements relating to the 2008 8-hour ozone national ambient air quality standards (NAAQS). This SIP revision is specific to nonattainment new source review (NNSR) requirements. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule without prior proposal because the Agency views this as a noncontroversial submittal and anticipates no adverse comments. A detailed description of the state submittal and EPA's evaluation is included in a technical support document (TSD) prepared in support of this rulemaking action. A copy of the TSD is available, upon request, from the EPA Regional Office listed in the ADDRESSES section of this document or is also available electronically within the Docket for this rulemaking action. If no adverse comments are received in response to this action, no further activity is contemplated. If EPA receives adverse comments, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA will not institute a second comment period. Any parties interested in commenting on this action should do so at this time.
Approval and Promulgation of Air Quality Implementation Plans; Maryland; Nonattainment New Source Review Requirements for the 2008 8-Hour Ozone Standard
Document Number: 2017-20834
Type: Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking direct final action to approve a revision to the State of Maryland's state implementation plan (SIP). The revision is in response to EPA's February 3, 2017 Findings of Failure to Submit for various requirements relating to the 2008 8-hour ozone national ambient air quality standards (NAAQS). This SIP revision is specific to nonattainment new source review (NNSR) requirements. EPA is approving this revision in accordance with the requirements of the Clean Air Act (CAA).
Interstate Transport of Fine Particulate Matter: Revision of Federal Implementation Plan Requirements for Texas
Document Number: 2017-20832
Type: Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is finalizing withdrawal of the federal implementation plan (FIP) provisions that require affected electricity generating units (EGUs) in Texas to participate in Phase 2 of the Cross-State Air Pollution Rule (CSAPR) trading programs for annual emissions of sulfur dioxide (SO2) and nitrogen oxides (NOX). Withdrawal of the FIP requirements is intended to address a decision of the U.S. Court of Appeals for the District of Columbia Circuit (D.C. Circuit) remanding the CSAPR Phase 2 SO2 budget for Texas to the EPA for reconsideration. With this action, the EPA is also determining that, following withdrawal of the FIP requirements, sources in Texas do not contribute significantly to nonattainment in, or interfere with maintenance by, any other state with regard to the 1997 national ambient air quality standard (NAAQS) for fine particulate matter (PM2.5). Accordingly, we are also determining that the EPA has no obligation to issue new FIP requirements for Texas sources to address transported PM2.5 pollution under Clean Air Act (CAA) section 110(a)(2)(D)(i)(I) with regard to that NAAQS. Finally, the EPA is also affirming the continued validity of the Agency's 2012 determination that participation in CSAPR meets the Regional Haze Rule's criteria for an alternative to the application of source- specific best available retrofit technology (BART). The EPA has determined that changes to CSAPR's geographic scope resulting from the actions EPA has taken or expects to take in response to the D.C. Circuit's remand do not affect the continued validity of participation in CSAPR as a BART alternative, because the changes in geographic scope would not have adversely affected the results of the air quality modeling analysis upon which the EPA based the 2012 determination.
Approval of Iowa Air Quality Implementation Plans; Elements of the Infrastructure SIP Requirements for the 2012 Annual Fine Particulate Matter (PM2.5
Document Number: 2017-20829
Type: Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking direct final action to approve elements of a State Implementation Plan (SIP) submission, for the 2012 Annual Fine Particulate Matter (PM2.5) National Ambient Air Quality Standard (NAAQS). Infrastructure SIPs address the applicable requirements of Clean Air Act (CAA) section 110, which requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each new or revised NAAQS promulgated by the EPA. These SIPs are commonly referred to as ``infrastructure'' SIPs. The infrastructure requirements are designed to ensure that the structural components of each state's air quality management program are adequate to meet the state's responsibilities under the CAA.
Approval of Iowa Air Quality Implementation Plans; Elements of the Infrastructure SIP Requirements for the 2012 Annual Fine Particulate Matter (PM2.5
Document Number: 2017-20825
Type: Proposed Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve elements of a State Implementation Plan (SIP) submission from the State of Iowa for the 2012 Annual Fine Particulate Matter (PM2.5) National Ambient Air Quality Standard (NAAQS). Infrastructure SIPs address the applicable requirements of Clean Air Act (CAA) section 110, which requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each new or revised NAAQS promulgated by the EPA. These SIPs are commonly referred to as ``infrastructure'' SIPs. The infrastructure requirements are designed to ensure that the structural components of each state's air quality management program are adequate to meet the state's responsibilities under the CAA. In the ``Rules and Regulations'' section of this issue of the Federal Register, we are approving the state's SIP revisions as a direct final rule without a prior proposed rule. If we receive no adverse comment, we will not take further action on this proposed rule.
Approval and Promulgation of Implementation Plans; New York; Regional Haze Five-Year Progress Report State Implementation Plan
Document Number: 2017-20823
Type: Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is approving New York's regional haze progress report, submitted on June 16, 2015, as a revision to its State Implementation Plan (SIP). New York's SIP revision addresses requirements of the Clean Air Act and the EPA's rules that require each state to submit periodic reports describing progress towards reasonable progress goals established for regional haze and a determination of the adequacy of the state's existing regional haze SIP. The EPA is approving New York's determination that the State's regional haze SIP is adequate to meet these reasonable progress goals for the first implementation period which extends through 2018.
Approval and Promulgation of Implementation Plans; New Jersey; Regional Haze Five-Year Progress Report State Implementation Plan
Document Number: 2017-20821
Type: Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is approving New Jersey's regional haze progress report, submitted on June 28, 2016, as a revision to its State Implementation Plan (SIP). New Jersey's SIP revision addresses requirements of the Clean Air Act and the EPA's rules that require each state to submit periodic reports describing progress towards reasonable progress goals established for regional haze and a determination of the adequacy of the state's existing regional haze SIP. The EPA is approving New Jersey's determination that the State's regional haze SIP is adequate to meet these reasonable progress goals for the first implementation period which extends through 2018.
Proposed Information Collection Request; Comment Request; Annual Public Water Systems Compliance Report
Document Number: 2017-20434
Type: Notice
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency is planning to submit an information collection request (ICR), ``Annual Public Water System Compliance Report'' (EPA ICR No. 1812.06, OMB Control No. 2020-0020) to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. Before doing so, EPA is soliciting public comments on specific aspects of the proposed information collection as described below. This is a proposed extension of the ICR, which is currently approved through April 30, 2018. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.
Air Plan Approval; North Carolina Miscellaneous Rules
Document Number: 2017-20325
Type: Rule
Date: 2017-09-29
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is approving several changes to the North Carolina State Implementation Plan (SIP) submitted by the State of North Carolina, through the North Carolina Department of Environmental Quality (NCDEQ), on December 14, 2004, and March 1, 2016. The March 1, 2016, submission adds a new rule to the ``Exclusionary Rules'' of the North Carolina SIP, and the portion of the December 14, 2004, submission EPA is approving adds two new rules under a new section called ``Permit Exemptions.'' This action is being taken pursuant to the Clean Air Act (CAA or Act).
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.