2-Propenoic Acid, Butyl Ester, Polymer With Ethenyl Acetate and Sodium Ethenesulfonate; Tolerance Exemption
Document Number: 2016-17165
Type: Rule
Date: 2016-07-20
Agency: Environmental Protection Agency
This regulation establishes an exemption from the requirement of a tolerance for residues of 2-propenoic acid, butyl ester, polymer with ethenyl acetate and sodium ethenesulfonate (CAS Reg. No. 66573-43- 1) when used as an inert ingredient in a pesticide chemical formulation. Celanese Ltd submitted a petition to EPA under the Federal Food, Drug, and Cosmetic Act (FFDCA), requesting an exemption from the requirement of a tolerance. This regulation eliminates the need to establish a maximum permissible level for residues of 2-propenoic acid, butyl ester, polymer with ethenyl acetate and sodium ethenesulfonate on food or feed commodities.
Receipt of Several Pesticide Petitions Filed for Residues of Pesticide Chemicals in or on Various Commodities
Document Number: 2016-17164
Type: Proposed Rule
Date: 2016-07-20
Agency: Environmental Protection Agency
This document announces the Agency's receipt of several initial filings of pesticide petitions requesting the establishment or modification of regulations for residues of pesticide chemicals in or on various commodities.
Sulfoxaflor; Receipt of Application for Emergency Exemption, Solicitation of Public Comment
Document Number: 2016-17162
Type: Notice
Date: 2016-07-20
Agency: Environmental Protection Agency
EPA has received a specific exemption request from the New Mexico Department of Agriculture to use the insecticide sulfoxaflor (CAS No. 946578-00-3) on pecans to control the black pecan aphid. The applicant proposes a use of a pesticide, sulfoxaflor, which is now considered to be unregistered under the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) because of the vacature of all sulfoxaflor registrations by the United States District Court for the Central District of California. In accordance with 40 CFR 166.24(a)(7), EPA is soliciting public comment before making the decision whether or not to grant the exemption.
Air Plan Approval; North Carolina Infrastructure Requirements for the 2010 Nitrogen Dioxide National Ambient Air Quality Standard
Document Number: 2016-17071
Type: Proposed Rule
Date: 2016-07-20
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve portions of the State Implementation Plan (SIP) submission, submitted by the State of North Carolina, through the North Carolina Department of Environment and Natural Resources (NC DENR), Division of Air Quality (NCDAQ) on August 23, 2013, for inclusion into the North Carolina SIP. This proposal pertains to the infrastructure requirements of the Clean Air Act (CAA or Act) for the 2010 1-hour nitrogen dioxide (NO2) national ambient air quality standards (NAAQS). The CAA requires that each state adopt and submit a SIP for the implementation, maintenance and enforcement of each NAAQS promulgated by EPA, which is commonly referred to as an ``infrastructure'' SIP submission. NCDAQ certified that the North Carolina SIP contains provisions that ensure the 2010 1-hour NO2 NAAQS is implemented, enforced, and maintained in North Carolina. EPA is proposing to find that portions of North Carolina's infrastructure SIP submission, provided to EPA on August 23, 2013, satisfy certain infrastructure elements for the 2010 1-hour NO2 NAAQS.
Air Plan Approval; Massachusetts; Infrastructure State Implementation Plan Requirements
Document Number: 2016-17069
Type: Proposed Rule
Date: 2016-07-20
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve most elements of State Implementation Plan (SIP) submissions from Massachusetts regarding the infrastructure requirements of the Clean Air Act (CAA or Act) for the 1997 ozone, 2008 lead (Pb), 2008 ozone, 2010 nitrogen dioxide (NO2), and 2010 sulfur dioxide (SO2) National Ambient Air Quality Standards (NAAQS). EPA is also proposing to conditionally approve three aspects of the Commonwealth's submittals. In addition, we are also proposing findings of failure to submit pertaining to various aspects of the prevention of significant deterioration (PSD) requirements of infrastructure SIPs. Lastly, we are proposing to remove 40 CFR 52.1160 as legally obsolete. The infrastructure requirements are designed to ensure that the structural components of each state's air quality management program are adequate to meet the state's responsibilities under the CAA.
Approval and Promulgation of Air Quality Implementation Plans; State of Kansas; 2015 Kansas State Implementation Plan for the 2008 Lead Standard
Document Number: 2016-17065
Type: Rule
Date: 2016-07-20
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking final action to approve a revision to the State Implementation Plan (SIP) for the State of Kansas. This final action will approve Kansas' SIP for the lead National Ambient Air Quality Standard (NAAQS) nonattainment area of Salina, Saline County, Kansas, received by EPA on February 25, 2015. EPA proposed approval of this plan on February 29, 2016. The applicable standard addressed in this action is the lead NAAQS promulgated by EPA in 2008. EPA believes that the SIP submitted by the state satisfies the applicable requirements of the Clean Air Act (CAA) identified in EPA's Final Rule published in the Federal Register on October 15, 2008, and will bring the designated portions of Salina, Kansas, into attainment of the 0.15 microgram per cubic meter (ug/m\3\) lead NAAQS.
Air Plan Approval; Oregon; Medford Area Carbon Monoxide Second 10-Year Maintenance Plan
Document Number: 2016-17060
Type: Rule
Date: 2016-07-20
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking direct final action to approve a second 10-year carbon monoxide (CO) limited maintenance plan (LMP) for the Medford area in Oregon, submitted by the Oregon Department of Environmental Quality (tODEQ) on December 11, 2015, along with a supplementary submittal on December 30, 2015, as a revision to its State Implementation Plan (SIP). In accordance with the requirements of the Clean Air Act (CAA), the EPA is approving this SIP revision because it demonstrates that the Medford area will continue to meet the CO National Ambient Air Quality Standards (NAAQS) for a second 10-year period beyond redesignation, through 2025.
Approval of Medford, Oregon; Carbon Monoxide Second 10-Year Limited Maintenance Plan
Document Number: 2016-17058
Type: Proposed Rule
Date: 2016-07-20
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve a second 10-year carbon monoxide (CO) limited maintenance plan (LMP) for the Medford area, submitted by the Oregon Department of Environmental Quality (ODEQ) on December 11, 2015, along with a supplementary submittal on December 30, 2015, as a revision to its State Implementation Plan (SIP). In accordance with the requirements of the Clean Air Act (CAA), the EPA is approving this SIP revision because it demonstrates that the Medford area will continue to meet the CO National Ambient Air Quality Standards (NAAQS) for a second 10-year period beyond redesignation, through 2025.
Finding of Failure To Submit a State Implementation Plan; Maryland; Interstate Transport Requirements for the 2008 8-Hour National Ambient Air Quality Standards for Ozone
Document Number: 2016-17057
Type: Rule
Date: 2016-07-20
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is taking final action finding that Maryland has failed to submit an infrastructure state implementation plan (SIP) to satisfy certain interstate transport requirements of the Clean Air Act (CAA) with respect to the 2008 8-hour ozone national ambient air quality standard (NAAQS). Specifically, these requirements pertain to the obligation to prohibit emissions which significantly contribute to nonattainment, or interfere with maintenance, of the 2008 8-hour ozone NAAQS in other states. This finding of failure to submit establishes a 2-year deadline for EPA to promulgate a federal implementation plan (FIP) to address the interstate transport SIP requirements pertaining to significant contribution to nonattainment and interference with maintenance of the 2008 ozone NAAQS in other states unless, prior to EPA promulgating a FIP, the state submits, and EPA approves, a SIP that meets these requirements.
Approval and Promulgation of Implementation Plans; Alaska: Infrastructure Requirements for the 2010 Nitrogen Dioxide and 2010 Sulfur Dioxide Standards
Document Number: 2016-17056
Type: Proposed Rule
Date: 2016-07-20
Agency: Environmental Protection Agency
Whenever a new or revised National Ambient Air Quality Standard (NAAQS) is promulgated, states must submit a plan for the implementation, maintenance and enforcement of such standard, commonly referred to as infrastructure requirements. The Environmental Protection Agency (EPA) is proposing to approve the May 12, 2015 Alaska State Implementation Plan (SIP) submission as meeting the infrastructure requirements for the 2010 nitrogen dioxide (NO2) and 2010 sulfur dioxide (SO2) NAAQS.
Air Plan Approval; Florida; Infrastructure Requirements for the 2010 Nitrogen Dioxide National Ambient Air Quality Standard
Document Number: 2016-17055
Type: Proposed Rule
Date: 2016-07-20
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve the State Implementation Plan (SIP) submission, submitted by the State of Florida, through the Florida Department of Environmental Protection (FDEP), on January 22, 2013, for inclusion into the Florida SIP. This proposal pertains to the infrastructure requirements of the Clean Air Act (CAA or Act) for the 2010 1-hour nitrogen dioxide (NO2) national ambient air quality standard (NAAQS). The CAA requires that each state adopt and submit a SIP for the implementation, maintenance and enforcement of each NAAQS promulgated by EPA, which is commonly referred to as an ``infrastructure SIP submission.'' FDEP certified that the Florida SIP contains provisions that ensure the 2010 1-hour NO2 NAAQS is implemented, enforced, and maintained in Florida. With the exception of provisions pertaining to the ambient air quality monitoring and data system, prevention of significant deterioration (PSD) permitting and interstate transport provisions pertaining to the contribution to nonattainment or interference with maintenance in other states, EPA is proposing to find that Florida's infrastructure SIP submission, provided to EPA on January 22, 2013, satisfies certain required infrastructure elements for the 2010 1-hour NO2 NAAQS.
Designation of Areas for Air Quality Planning Purposes; Ohio; Redesignation of the Ohio Portion of the Campbell-Clermont KY-OH Sulfur Dioxide Nonattainment Area
Document Number: 2016-17054
Type: Proposed Rule
Date: 2016-07-20
Agency: Environmental Protection Agency
In accordance with the Clean Air Act (CAA), the Environmental Protection Agency (EPA) is proposing to redesignate the Ohio portion of the Campbell-Clermont KY-OH sulfur dioxide (SO2) nonattainment area from nonattainment to attainment. The Ohio portion of this area consists of Pierce Township in Clermont County, Ohio. EPA is also proposing to approve Ohio's maintenance plan submitted on August 11, 2015. The primary emission source in the area has permanently closed, and the air quality in the area is now meeting the SO2 standard.
Air Plan Approval/Disapproval; Alabama Infrastructure Requirements for the 2010 Nitrogen Dioxide National Ambient Air Quality Standards
Document Number: 2016-17053
Type: Proposed Rule
Date: 2016-07-20
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve in part and disapprove in part portions of the April 23, 2013, and December 9, 2015, update State Implementation Plan (SIP) submissions, submitted by the State of Alabama, through the Alabama Department of Environmental Management (ADEM), for inclusion into the Alabama SIP. This proposal pertains to the infrastructure requirements of the Clean Air Act (CAA or Act) for the 2010 1-hour nitrogen dioxide (NO2) national ambient air quality standard (NAAQS). The CAA requires that each state adopt and submit a SIP for the implementation, maintenance and enforcement of each NAAQS promulgated by EPA, which is commonly referred to as an ``infrastructure'' SIP. ADEM certified that the Alabama SIP contains provisions that ensure the 2010 1-hour NO2 NAAQS is implemented, enforced, and maintained in Alabama. With the exception of provisions pertaining to prevention of significant deterioration (PSD) permitting, and visibility in other states, for which EPA is proposing no action through this notice, and with the exception of the provisions respecting state boards, for which EPA is proposing disapproval, EPA is proposing to approve Alabama's infrastructure SIP submissions provided to EPA on April 23, 2013, and updated on December 9, 2015, as satisfying the required infrastructure elements for the 2010 NO2 NAAQS.
Air Plan Approval; RI; Regional Haze Five Year Progress Report
Document Number: 2016-16941
Type: Rule
Date: 2016-07-20
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is approving a State Implementation Plan (SIP) revision submitted by the State of Rhode Island on January 7, 2015. This SIP revision includes Rhode Island's regional haze progress report and adequacy determination for the first regional haze implementation period. This action is being taken under the Clean Air Act (CAA).
Air Plan Approval; RI; Regional Haze Five Year Progress Report
Document Number: 2016-16940
Type: Proposed Rule
Date: 2016-07-20
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve a State Implementation Plan (SIP) revision submitted by the State of Rhode Island on January 7, 2015. This SIP revision includes Rhode Island's regional haze progress report and adequacy determination for the first regional haze implementation period. This action is being taken under the Clean Air Act.