Environmental Protection Agency August 22, 2014 – Federal Register Recent Federal Regulation Documents
Results 1 - 4 of 4
Approval and Promulgation of Implementation Plans; South Carolina; Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards
The Environmental Protection Agency (EPA) is proposing to approve the July 17, 2012, State Implementation Plan (SIP) submission, provided by the South Carolina Department of Health and Environmental Control (SC DHEC) for inclusion into the South Carolina SIP. This proposal pertains to the Clean Air Act (CAA or the Act) infrastructure requirements for the 2008 8-hour ozone national ambient air quality standards (NAAQS). The CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by EPA, which is commonly referred to as an ``infrastructure'' SIP. SC DHEC certified that the South Carolina SIP contains provisions that ensure the 2008 8-hour ozone NAAQS is implemented, enforced, and maintained in South Carolina (hereafter referred to as an ``infrastructure SIP submission''). With the exception of provisions pertaining to prevention of significant deterioration (PSD) permitting, interstate transport, and visibility protection requirements, EPA is proposing to determine that South Carolina's infrastructure SIP submission, provided to EPA on July 17, 2012, addresses the required infrastructure elements for the 2008 8- hour ozone NAAQS.
Approval and Promulgation of Air Quality Implementation Plans; Virginia; Infrastructure Requirements for the 2010 Sulfur Dioxide National Ambient Air Quality Standards
The Environmental Protection Agency (EPA) is proposing to approve a State Implementation Plan (SIP) revision submitted by the Commonwealth of Virginia pursuant to the Clean Air Act (CAA). Whenever new or revised National Ambient Air Quality Standards (NAAQS) are promulgated, the CAA requires states to submit a plan for the implementation, maintenance, and enforcement of such NAAQS. The plan is required to address basic program elements including, but not limited to, regulatory structure, monitoring, modeling, legal authority, and adequate resources necessary to assure attainment and maintenance of the standards. These elements are referred to as infrastructure requirements. The Commonwealth of Virginia has made a submittal addressing the infrastructure requirements for the 2010 sulfur dioxide (SO2) NAAQS.
Amendment, Extension, or Issuance of an Experimental Use Permit
EPA has granted amendments, extensions, and issuances of experimental use permits (EUPs) to the pesticide applicants described in Unit II. of the SUPPLEMENTARY INFORMATION. An EUP permits use of a pesticide for experimental or research purposes only in accordance with the limitations in the permit.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.