Environmental Protection Agency March 22, 2013 – Federal Register Recent Federal Regulation Documents
Results 1 - 6 of 6
Certain New Chemicals; Receipt and Status Information
The Toxic Substances Control Act (TSCA) requires any person who intends to manufacture (defined by statute to include import) a new chemical (i.e., a chemical not on the TSCA Chemical Substances Inventory (TSCA Inventory)) to notify EPA and comply with the statutory provisions pertaining to the manufacture of new chemicals. In addition under TSCA, EPA is required to publish in the Federal Register a notice of receipt of a premanufacture notice (PMN) or an application for a test marketing exemption (TME), and to publish in the Federal Register periodic status reports on the new chemicals under review and the receipt of notices of commencement (NOC) to manufacture those chemicals. This document, which covers the period from January 14, 2013 to February 8, 2013, and provides the required notice and status report, consists of the PMNs and TMEs, both pending or expired, and the NOC to manufacture a new chemical that the Agency has received under TSCA section 5 during this time period.
Banda de Lupinus albus doce (BLAD); Exemption From the Requirement of a Tolerance
This regulation establishes an exemption from the requirement of a tolerance for residues of banda de Lupinus albus doce (BLAD), a naturally occurring polypeptide from the catabolism of a seed storage protein ([beta]-conglutin) of sweet lupines (Lupinus albus), in or on all food commodities when applied as a fungicide and used in accordance with label directions and good agricultural practices. On behalf of Consumo Em Verde S.A., Bert Volger of Ceres International LLC submitted a petition to EPA under the Federal Food, Drug, and Cosmetic Act (FFDCA), requesting an exemption from the requirement of a tolerance. This regulation eliminates the need to establish a maximum permissible level for residues of BLAD under the FFDCA.
Proposed Reissuance of a General NPDES Permit for Oil and Gas Exploration Facilities in the Federal Waters of Cook Inlet-Permit Number AKG-28-5100
The EPA proposes to reissue the National Pollutant Discharge Elimination System (NPDES) for Oil and Gas Exploration Facilities in Federal Waters of Cook Inlet (AKG 31-5000). As proposed, the permit would authorize certain discharges of pollutants into Cook Inlet Federal Waters from oil and gas exploration facilities subject to limits and requirements designed to minimize pollution and protect water quality.
Draft Guidance for E85 Flexible Fuel Vehicle Weighting Factor for Model Years 2016-2019 Vehicles Under the Light-Duty Greenhouse Gas Emissions Program
EPA is requesting comment on draft EPA guidance to auto manufacturers for weighting the greenhouse gas (GHG) emissions of a flexible fuel vehicle operating on E85 with the GHG emissions of the vehicle operating on conventional gasoline, when calculating the compliance value to use for EPA's GHG emissions standards. EPA also invites comment on the analysis used by EPA to determine the weighting factor.
Approval and Promulgation of Federal Implementation Plan for Oil and Natural Gas Well Production Facilities; Fort Berthold Indian Reservation (Mandan, Hidatsa, and Arikara Nation), North Dakota
The EPA is taking final action to promulgate a Reservation- specific Federal Implementation Plan in order to regulate emissions from oil and natural gas production facilities located on the Fort Berthold Indian Reservation in North Dakota. The Federal Implementation Plan includes basic air quality regulations for the protection of communities in and adjacent to the Fort Berthold Indian Reservation. The Federal Implementation Plan requires owners and operators of oil and natural gas production facilities to reduce emissions of volatile organic compounds emanating from well completions, recompletions, and production and storage operations. This Federal Implementation Plan will be implemented by the EPA, or a delegated tribal authority, until replaced by a Tribal Implementation Plan. The EPA proposed a Reservation-specific Federal Implementation Plan concurrently with an interim final rule on August 15, 2012. This final Federal Implementation Plan replaces the interim final rule in all intents and purposes on the effective date of the final rule. The EPA is taking this action pursuant to the Clean Air Act (CAA).
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.