Environmental Protection Agency August 2, 2012 – Federal Register Recent Federal Regulation Documents

Approval and Promulgation of Air Quality Implementation Plans; Illinois; Indiana; Michigan; Minnesota; Ohio; Wisconsin; Infrastructure SIP Requirements for the 2006 PM2.5
Document Number: 2012-18880
Type: Proposed Rule
Date: 2012-08-02
Agency: Environmental Protection Agency
EPA is proposing to approve some elements, and disapprove other elements, of State Implementation Plan (SIP) submissions by Illinois, Indiana, Michigan, Minnesota, Ohio, and Wisconsin regarding the infrastructure requirements of sections 110(a)(1) and (2) of the Clean Air Act (CAA) for the 2006 24-hour fine particle national ambient air quality standards (2006 PM2.5 NAAQS). The infrastructure requirements are designed to ensure that the structural components of each state's air quality management program are adequate to meet the state's responsibilities under the CAA. EPA is also proposing to approve portions of a submittal from Indiana addressing EPA's requirements for its new source review (NSR) and prevention of significant deterioration (PSD) program.
Agency Information Collection Activities; Proposed Collection; Comment Request; EPA's ENERGY STAR Program in the Commercial and Industrial Sectors; EPA ICR No. 1772.06
Document Number: 2012-18873
Type: Notice
Date: 2012-08-02
Agency: Environmental Protection Agency
In compliance with the Paperwork Reduction Act (PRA), this document announces that EPA is planning to submit a request to renew an existing approved Information Collection Request (ICR) to the Office of Management and Budget (OMB). This ICR is scheduled to expire on January 31, 2013. Before submitting the ICR to OMB for review and approval, EPA is soliciting comments on specific aspects of the proposed information collection as described below.
National Emission Standards for Hazardous Air Pollutants From Coal- and Oil-Fired Electric Utility Steam Generating Units and Standards of Performance for Fossil-Fuel-Fired Electric Utility, Industrial-Commercial-Institutional, and Small Industrial-Commercial-Institutional Steam Generating Units: Notice of Partial Stay
Document Number: 2012-18871
Type: Rule
Date: 2012-08-02
Agency: Environmental Protection Agency
This action stays the effectiveness of national new source emission standards for hazardous air pollutants from coal- and oil- fired electric utility steam generating units issued pursuant to Clean Air Act section 112 that were published in the Federal Register on February 16, 2012 (77 FR 9304).
Notice of Proposed Administrative Settlement Pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act, As Amended; Anaconda Copper Mine Site
Document Number: 2012-18870
Type: Notice
Date: 2012-08-02
Agency: Environmental Protection Agency
In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act (``CERCLA''), as amended, 42 U.S.C. 9622(i), notice is hereby given of a proposed Settlement Agreement and Order on Consent for Removal Action by Bona Fide Administrative Agreement for Recovery of Past Response Costs (``Agreement,'' Region 9 Docket No. 9-2012-07) pursuant to Section 122(h) of CERCLA concerning the ANACONDA COPPER MINE SITE (the ``Site''), located in Yerington, Lyon County, Nevada. The respondent is Singatse Peak Services (``Respondent''). Through the proposed Agreement, the Respondent will fund up to $420,000 toward a response action by EPA to address releases from the Arimetco heap leach fluid management system (``FMS''). Respondent will conduct a study to assess options to ensure approximately five years of fluid capacity in the FMS, and may pay toward any response to implement a selected option. The Agreement provides Respondent with a covenant not to sue for past costs at the Site and response actions funded in the Agreement, as well as contribution protection. For thirty (30) days following the date of publication of this Notice, the Agency will receive written comments relating to the proposed Agreement, and EPA's responses to comments received will be available for public inspection at EPA's Region IX offices, located at 75 Hawthorne Street, San Francisco, California 94105.
Approval and Promulgation of Implementation Plans; Tennessee 110(a)(1) and (2) Infrastructure Requirements for the 1997 and 2006 Fine Particulate Matter National Ambient Air Quality Standards
Document Number: 2012-18797
Type: Rule
Date: 2012-08-02
Agency: Environmental Protection Agency
EPA is taking final action to approve in part, and conditionally approve in part, the State Implementation Plan (SIP) submission, submitted by the State of Tennessee, through the Tennessee Department of Environment and Conservation (TDEC), as demonstrating that the State meets the SIP requirements of sections 110(a)(1) and (2) of the Clean Air Act (CAA or the Act) for the 1997 annual and 2006 24- hour fine particulate matter (PM2.5) national ambient air quality standards (NAAQS). Section 110(a) of the CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by EPA, which is commonly referred to as an ``infrastructure'' SIP. Tennessee certified that the Tennessee SIP contains provisions that ensure the 1997 annual and 2006 24-hour PM2 NAAQS are implemented, enforced, and maintained in Tennessee (hereafter referred to as ``infrastructure submission''). With the exception of element 110(a)(2)(E)(ii), which pertains to the requirements of section 128(a)(1) of the CAA, Tennessee's infrastructure submissions, provided to EPA on December 14, 2007, and October 19, 2009, addresses all the required infrastructure elements for the 1997 annual and 2006 24-hour PM2 NAAQS.
Approval and Promulgation of State Implementation Plans: Idaho; Boise-Northern Ada County Air Quality Maintenance Area Second 10-Year Carbon Monoxide Maintenance Plan
Document Number: 2012-18787
Type: Rule
Date: 2012-08-02
Agency: Environmental Protection Agency
EPA is taking direct final action to approve a State Implementation Plan (SIP) revision submitted by the State of Idaho (the State). The Idaho State Department of Environmental Quality (IDEQ) submitted the Northern Ada County Air Quality Maintenance Area Second 10-year Carbon Monoxide Maintenance Plan on February 10, 2011. In accordance with the requirements of the Federal Clean Air Act (the Act), EPA is approving the revision because the State adequately demonstrates that the Boise-Northern Ada County Air Quality Maintenance Area will maintain air quality standards for carbon monoxide (CO) through the year 2022.
Approval and Promulgation of State Implementation Plans: Idaho; Boise-Northern Ada County Air Quality Maintenance Area; Second 10-Year Carbon Monoxide Maintenance Plan
Document Number: 2012-18786
Type: Proposed Rule
Date: 2012-08-02
Agency: Environmental Protection Agency
EPA is proposing to approve a State Implementation Plan (SIP) revision submitted by the State of Idaho (the State). The Idaho State Department of Environmental Quality (IDEQ) submitted the Northern Ada County Air Quality Maintenance Area Second 10-year Carbon Monoxide Maintenance Plan on February 10, 2011. In accordance with the requirements of the Federal Clean Air Act (the Act), EPA is proposing to approve the revision because the State adequately demonstrates that the Boise-Northern Ada County Air Quality Maintenance Area will maintain air quality standards for carbon monoxide (CO) through the year 2022.
Approval and Promulgation of Implementation Plans; Kentucky; Louisville; Fine Particulate Matter 2002 Base Year Emissions Inventory
Document Number: 2012-18784
Type: Rule
Date: 2012-08-02
Agency: Environmental Protection Agency
EPA is taking final action to approve the 1997 annual fine particulate matter (PM2.5) 2002 base year emissions inventory portion of the State Implementation Plan (SIP) revision submitted by the Commonwealth of Kentucky on December 3, 2008. The emissions inventory is part of Kentucky's December 3, 2008, attainment demonstration SIP revision that was submitted to meet the nonattainment requirements related to the Commonwealth's portion of the bi-state Louisville, Kentucky-Indiana nonattainment area for the 1997 annual PM2.5 national ambient air quality standards (NAAQS), hereafter referred to as ``the bi-state Louisville Area'' or ``Area.'' The bi-state Louisville Area is comprised of Clark and Floyd Counties in Indiana, in their entireties; the Madison Township portion of Jefferson County, Indiana; and Bullitt and Jefferson Counties in Kentucky, in their entireties. This final action only relates to the Kentucky portion (i.e., Bullitt and Jefferson Counties) of this Area. This action is being taken pursuant to section 110 of the Clean Air Act (CAA or Act).
Determination of Attainment for the Paul Spur/Douglas PM10
Document Number: 2012-18666
Type: Rule
Date: 2012-08-02
Agency: Environmental Protection Agency
EPA is finalizing a determination that the Paul Spur/Douglas nonattainment area in Arizona is currently attaining the National Ambient Air Quality Standard (NAAQS) for particulate matter with an aerodynamic diameter of less than or equal to a nominal ten micrometers (PM10) based on certified, quality-assured ambient air monitoring data for the years 2009-2011. Given our determination that the Paul Spur/Douglas nonattainment area is currently attaining the PM10 NAAQS, EPA is also determining that Arizona's obligation to make submissions to meet certain Clean Air Act requirements related to attainment of the NAAQS is not applicable for as long as the Paul Spur/Douglas nonattainment area continues to attain the NAAQS and that the obligation on EPA to promulgate a Federal Implementation Plan to address the State's attainment-related requirements is also suspended for as long as Arizona's underlying obligation is suspended.
Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality Planning Purposes; Tennessee: Knoxville; Determination of Attaining Data for the 1997 Annual and 2006 24-Hour Fine Particulate Matter Standards
Document Number: 2012-18663
Type: Rule
Date: 2012-08-02
Agency: Environmental Protection Agency
EPA is making two determinations, one regarding the Knoxville, Tennessee, 1997 annual fine particulate (PM2.5) nonattainment area and one regarding the Knoxville-Sevierville-La Follette, Tennessee, 2006 24-hour PM2.5 nonattainment area (both areas have the same geographic boundary and will hereafter be collectively referred to as the ``Knoxville Area'' or ``Area''). First, EPA is determining that the Area has attained the 1997 annual PM2.5 National Ambient Air Quality Standards (NAAQS or ``standard''). Second, EPA is determining that the Area has attained the 2006 24-hour PM2.5 NAAQS. These determinations of attaining data are based upon quality-assured and certified ambient air monitoring data for the 2009-2011 period, showing that the Area has monitored attainment of the 1997 annual PM2.5 NAAQS and 2006 24-hour PM2.5 NAAQS. The requirements for the Area to submit an attainment demonstration and associated reasonably available control measures (RACM), reasonable further progress (RFP) plans, contingency measures, and other planning State Implementation Plan (SIP) revisions related to attainment of the standards shall be suspended so long as the Area continues to attain the respective PM2.5 NAAQS.
National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the Eastland Woolen Mill Superfund Site
Document Number: 2012-18660
Type: Rule
Date: 2012-08-02
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) Region 1 is publishing a direct final Notice of Partial Deletion for portions of the Eastland Woolen Mill Superfund Site (Site), located in Corinna, Maine, from the National Priorities List (NPL). The NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). This direct final partial deletion is being published by EPA with the concurrence of the State of Maine, through the Maine Department of Environmental Protection, because EPA has determined that all appropriate response actions at these identified parcels under CERCLA, other than five-year reviews, have been completed. However, this partial deletion does not preclude future actions under Superfund. This partial deletion pertains to all Site media (soil and groundwater) of the properties proposed for deletion.
National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the Eastland Woolen Mill Superfund Site
Document Number: 2012-18659
Type: Proposed Rule
Date: 2012-08-02
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) Region 1 is issuing a Notice of Intent to Delete the following properties at the Eastland Woolen Mill Superfund Site (Site) located in Corinna, Maine, from the National Priorities List (NPL) and requests public comments on this proposed action. The NPL, promulgated pursuant to section 105 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Maine, through the Maine Department of Environmental Protection, have determined that all appropriate response actions at these identified parcels under CERCLA, other than and five-year reviews, have been completed. However, this deletion does not preclude future actions under Superfund. This partial deletion pertains to all Site media (including soil and groundwater).
Approval and Promulgation of Air Quality Implementation Plans; Maryland; Preconstruction Requirements-Prevention of Significant Deterioration and Nonattainment New Source Review
Document Number: 2012-18656
Type: Rule
Date: 2012-08-02
Agency: Environmental Protection Agency
EPA is approving several revisions to the Maryland State Implementation Plan (SIP) submitted by the Maryland Department of the Environment (MDE). These revisions pertain to preconstruction requirements under the Prevention of Significant Deterioration (PSD) and non-attainment New Source Review (NSR) programs. The SIP revisions satisfy the following required SIP elements: NSR Reform, oxides of nitrogen (NOX) as a precursor to ozone, PM2.5, and Greenhouse Gases (GHGs). Additionally, EPA is approving, as a separate action, Maryland's submittals for purposes of meeting the infrastructure requirements of the Clean Air Act (CAA) which relate to Maryland's PSD permitting program and are necessary to implement, maintain, and enforce the 1997 8-hour ozone and PM2.5 National Ambient Air Quality Standards (NAAQS) and the 2006 PM2.5 NAAQS. This action is being taken under the CAA.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.