Environmental Protection Agency June 15, 2012 – Federal Register Recent Federal Regulation Documents

Environmental Impacts Statements; Notice of Availability
Document Number: 2012-14721
Type: Notice
Date: 2012-06-15
Agency: Environmental Protection Agency
Approval, Disapproval and Promulgation of Air Quality Implementation Plan; Utah; Maintenance Plan for the 1-Hour Ozone Standard for Salt Lake and Davis Counties
Document Number: 2012-14668
Type: Rule
Date: 2012-06-15
Agency: Environmental Protection Agency
EPA is partially approving and partially disapproving State Implementation Plan (SIP) revisions submitted by the Governor of Utah on February 22, 1999. These revisions updated the State of Utah's maintenance plan for the 1-hour ozone standard for Salt Lake County and Davis County. As part of this action, EPA is also addressing certain actions it took in 2003 concerning such maintenance plan. This action is being taken under section 110 of the Clean Air Act (CAA).
Approval and Promulgation of Implementation Plans; Revisions to the Georgia State Implementation Plan
Document Number: 2012-14595
Type: Rule
Date: 2012-06-15
Agency: Environmental Protection Agency
EPA is taking direct final action to approve a State Implementation Plan (SIP) revision submitted by the State of Georgia, through the Department of Natural Resources (GA DNR), on November 16, 2010. This revision consists of transportation conformity criteria and procedures related to interagency consultation and enforceability of certain transportation-related control measures and mitigation measures. The intended effect is to update the transportation conformity criteria and procedures in the Georgia SIP. This action is being taken pursuant to section 110 of the Clean Air Act.
Approval and Promulgation of Implementation Plans; Revisions to the Georgia State Implementation Plan
Document Number: 2012-14594
Type: Proposed Rule
Date: 2012-06-15
Agency: Environmental Protection Agency
EPA is proposing to approve a State Implementation Plan (SIP) revision submitted by the State of Georgia, through the Department of Natural Resources, Environmental Protection Division on November 16, 2010. This revision consists of transportation conformity criteria and procedures related to interagency consultation and enforceability of certain transportation-related control measures and mitigation measures. The intended effect is to update the transportation conformity criteria and procedures in the Georgia SIP. This action is being taken pursuant to section 110 of the Clean Air Act. In the Final Rules Section of this Federal Register, EPA is approving the State's SIP revision as a direct final rule without prior proposal because the Agency views this as a noncontroversial submittal and anticipates no adverse comments. A detailed rationale for the approval is set forth in the direct final rule. If no adverse comments are received in response to this rule, no further activity is contemplated. If EPA receives adverse comments, the direct final rule will be withdrawn and all public comments received will be addressed in a subsequent final rule based on this proposed rule. EPA will not institute a second comment period on this document. Any parties interested in commenting on this document should do so at this time.
Approval and Promulgation of Implementation Plans; Georgia; 110(a)(1) and (2) Infrastructure Requirements for the 1997 and 2006 Fine Particulate Matter National Ambient Air Quality Standards
Document Number: 2012-14591
Type: Proposed Rule
Date: 2012-06-15
Agency: Environmental Protection Agency
EPA is proposing to approve the State Implementation Plans (SIPs), submitted by the State of Georgia, through the Georgia Department of Natural Resources' Environmental Protection Division (EPD), as demonstrating that the State meets the requirements of sections 110(a)(1) and (2) of the Clean Air Act (CAA or the Act) for the 1997 annual and 2006 24-hour fine particulate matter (PM2.5) national ambient air quality standards (NAAQS). Section 110(a) of the CAA requires that each state adopt and submit a SIP for the implementation, maintenance, and enforcement of each NAAQS promulgated by the EPA, which is commonly referred to as an ``infrastructure'' SIP. Georgia certified that the Georgia SIP contains provisions that ensure the 1997 annual and 2006 24-hour PM2.5 NAAQS is implemented, enforced, and maintained in Georgia (hereafter referred to as ``infrastructure submission''). EPA is proposing to determine that Georgia's infrastructure submissions, provided to EPA on July 23, 2008, and on October 21, 2009, addressed all the required infrastructure elements for the for the 1997 annual and 2006 24-hour PM2.5 NAAQS.
Approval and Promulgation of Implementation Plans; State of Florida: New Source; Review Prevention of Significant Deterioration: Nitrogen Oxides as a Precursor to Ozone
Document Number: 2012-14419
Type: Rule
Date: 2012-06-15
Agency: Environmental Protection Agency
EPA is taking final action to approve changes to the Florida State Implementation Plan (SIP), submitted by the Florida Environmental Protection (FDEP), through the Division of Air Resource Management, to EPA in two separate SIP revisions on October 19, 2007, and July 1, 2011. These SIP revisions modify Florida's New Source Review (NSR) Prevention of Significant Deterioration (PSD) program to address requirements promulgated in the 1997 8-hour ozone national ambient air quality standards (NAAQS) Implementation Rule NSR Update Phase II (hereafter referred to as the ``Ozone Implementation NSR Update'' or ``Phase II Rule'') recognizing nitrogen oxide (NOX) as an ozone precursor, among other requirements. In addition, both SIP revisions make clarifying and corrective changes to Florida's regulations. EPA is approving both SIP revisions because the Agency has determined that the changes are in accordance with the Clean Air Act (CAA or Act) and EPA regulations regarding NSR permitting.
Approval of Air Quality Implementation Plans; Wisconsin; Partial Disapproval of “Infrastructure” State Implementation Plan
Document Number: 2012-14417
Type: Rule
Date: 2012-06-15
Agency: Environmental Protection Agency
Pursuant to its authority under the Clean Air Act (CAA), EPA is taking final action to disapprove two narrow portions of submissions made by the Wisconsin Department of Natural Resources (WDNR) to address the section 110(a)(1) and (2) requirements of the CAA, often referred to as the ``infrastructure'' State Implementation Plan (SIP). Specifically, we are finalizing the disapproval of portions of WDNR's submissions intended to meet certain requirements of section 110(a)(2)(C) with respect to the 1997 8-hour ozone National Ambient Air Quality Standards (NAAQS) and 1997 24-hour PM2.5 NAAQS. Among other conditions, section 110(a)(2)(C) of the CAA requires states to correctly address oxides of nitrogen (NOX) as a precursor to ozone in their respective prevention of significant deterioration (PSD) programs. EPA is finalizing disapproval of a portion of Wisconsin's submissions intended to satisfy this requirement. EPA is also finalizing disapproval of a portion of Wisconsin's submissions because the SIP currently contains a new source review (NSR) exemption for fuel changes as major modifications where the source was capable of accommodating the change before January 6, 1975. The proposed rule associated with this final action was published on April 20, 2012.
Approval and Promulgation of State Implementation Plans; New Mexico; Regional Haze Rule Requirements for Mandatory Class I Areas
Document Number: 2012-14247
Type: Proposed Rule
Date: 2012-06-15
Agency: Environmental Protection Agency
EPA is proposing to approve New Mexico State Implementation Plan (SIP) revisions submitted on July 5, 2011, and December 1, 2003, by the Governor of New Mexico addressing the regional haze requirements for the 16 Class I areas covered by the Grand Canyon Visibility Transport Commission Report and a separate submittal for other Federal mandatory Class I areas. EPA is proposing to find that the submittals meet the requirements. We are proposing action on all components of the state's submittals except for the submitted nitrogen oxides (NOX) Best Available Retrofit Technology (BART) determination for the San Juan Generating Station (SJGS). We propose to approve all other components, including the sulfur dioxide emission reduction milestones and backstop trading program, the smoke management plan and the particulate matter BART determination for the SJGS. We are also proposing to approve several SIP submissions offered as companion rules to the regional haze plan, including submitted regulations for the Western Backstop Sulfur Dioxide Trading Program, for the inventorying of emissions, for smoke management, and open burning. EPA is taking this action under section 110 of the Clean Air Act.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.