Environmental Protection Agency September 24, 2010 – Federal Register Recent Federal Regulation Documents
Results 1 - 14 of 14
Lead in Ammunition and Fishing Sinkers; Disposition of TSCA Section 21 Petition
On August 3, 2010, several groups filed a petition under the Toxic Substances Control Act (TSCA) section 21 requesting that EPA prohibit under TSCA section 6(a) the manufacture, processing, and distribution in commerce of (1) lead bullets and shot; and (2) lead fishing sinkers. On August 27, 2010, EPA denied the first request due to a lack of authority to regulate lead in bullets and shot under TSCA. EPA's decision is based on the exclusion of shells and cartridges from the definition of ``chemical substance'' in TSCA section 3(2)(B)(v). EPA is still considering the second request and will respond to that portion of the petition within the 90-day period provided in section 21 of TSCA. This notice explains EPA's reasons for the denial of the request specific to lead bullets and shot.
Agency Information Collection Activities; Proposed Collection; Comment Request; Underground Storage Tank: Information Request Letters, Pacific Southwest Region (Region IX); EPA ICR No. 2405.01, OMB Control No. 2009-NEW
In compliance with the Paperwork Reduction Act (PRA) (44 U.S.C. 3501 et seq.), this document announces that EPA's Pacific Southwest Region (Region IX) is planning to submit an Information Collection Request (ICR) to the Office of Management and Budget (OMB). Before submitting the request to OMB, EPA Region IX is soliciting comments on specific aspects of the information collection as described below.
2010 Fall Meeting of the Ozone Transport Commission
The United States Environmental Protection Agency is announcing the 2010 Fall Meeting of the Ozone Transport Commission (OTC). This OTC meeting will explore options available for reducing ground-level ozone precursors in a multi-pollutant context. The Commission will be evaluating potential measures and considering actions in areas such as performance standards for electric generating units (EGUs) on high electric demand days, oil and gas boilers serving EGUs, small natural gas boilers, stationary generators, energy security/energy efficiency, architectural industrial and maintenance coatings, consumer products, institution commercial and industrial (ICI) boilers, vapor recovery at gas stations, large above ground storage tanks, seaports, aftermarket catalysts, lightering, and non-road idling.
Nebraska: Final Authorization of State Hazardous Waste Management Program Revisions
The Solid Waste Disposal Act, as amended, commonly referred to as the Resource Conservation and Recovery Act (RCRA), allows the Environmental Protection Agency (EPA) to authorize States to operate their hazardous waste management programs in lieu of the Federal program. Nebraska has applied to EPA for final authorization of the changes to its hazardous waste program under RCRA. EPA has determined that these changes satisfy all requirements needed to qualify for final authorization and is authorizing the State's changes through this immediate final action.
Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and Reinvestment Act of 2009 (ARRA) to the City of Lewiston, ME and the Auburn, Maine Water District
The EPA is hereby granting a waiver of the Buy American requirements of ARRA Section 1605 under the authority of Section 1605(b)(2) [manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality] to the City of Lewiston, Maine and the Auburn, Maine Water District (``Auburn-Lewiston'') for the purchase of thirteen separate types of ductile iron pipe fittings (with various quantities for each individual fitting configuration totaling 33 fittings) that are foreign manufactured as part of an upgrade project at the Auburn-Lewiston Water Treatment Facility. This is a project specific waiver and only applies to the use of the specified product for the ARRA project being proposed. Any other ARRA recipient that wishes to use the same product must apply for a separate waiver based on project specific circumstances. Based upon information submitted by Auburn-Lewiston, it has been determined that there are currently no domestically manufactured pipe fittings available to meet the Auburn-Lewiston's project construction schedule. The Regional Administrator is making this determination based on the review and recommendations of the Municipal Assistance Unit. The Assistant Administrator of the Office of Administration and Resources Management has concurred on this decision to make an exception to Section 1605 of ARRA. This action permits the purchase of foreign manufactured pipe fittings by Auburn-Lewiston, as specified in its July 28, 2010 request.
Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and Reinvestment Act of 2009 (ARRA) to the City of Lowell, MA
The EPA is hereby granting a waiver of the Buy American requirements of ARRA Section 1605 under the authority of Section 1605(b)(1) [inconsistent with the public interest] to the City of Lowell, Massachusetts (City) for the purchase of a foreign manufactured 30-inch diameter pipe tee fitting for a finished water pipe at the Lowell Water Treatment Facility. This is a project-specific waiver and only applies to the use of the specified product for the ARRA project being proposed. Any other ARRA recipient that wishes to use the same product must apply for a separate waiver based on project-specific circumstances. The proposed work involved repairing an existing 30-inch cement lined ductile iron fitting on a finished water line in the Lowell Water Treatment Facility. Based upon information submitted by the City's consulting engineer, EPA has concluded that, under the given circumstances (i.e. emergency standby situation, the need to minimize disruption in water transmission service), requiring the installation of an alternative domestic manufactured pipe fitting would be inconsistent with the public interest, and that a waiver of the Buy American provisions is justified. The Regional Administrator is making this determination based on the review and recommendations of the Municipal Assistance Unit. The Assistant Administrator of the Office of Administration and Resources Management has concurred on this decision to make an exception to the requirements of Section 1605(a) of ARRA. This action allows the purchase and installation of the foreign manufactured 30-inch pipe fitting media, as specified in its June 18, 2010 request.
Science Advisory Board Staff Office Request for Nominations of Experts for the Review of Great Lakes Restoration Initiative Action Plan
The EPA Science Advisory Board (SAB) Staff Office is requesting public nominations for technical experts to form an SAB panel to review the interagency Great Lakes Restoration Initiative (GLRI) Action Plan which describes restoration priorities, goals, objectives, measurable ecological targets, and specific actions.
Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and Reinvestment Act of 2009 (ARRA) to the Town of Bristol, RI
The EPA is hereby granting a waiver of the Buy American requirements of ARRA Section 1605 under the authority of Section 1605(b)(1) [inconsistent with the public interest] to the Town of Bristol, Rhode Island (Town) for the utilization and installation of two influent and two effluent sluice gates for the facility's two final clarifiers as part of a larger overall wastewater treatment plant upgrade project. This is a project specific waiver and only applies to the use of the specified product for the ARRA project being proposed. Any other ARRA recipient that wishes to use the same product must apply for a separate waiver based on project specific circumstances. The Town had been assured by the manufacturer that the sluice gates would be made in a facility in Massachusetts. However, the manufacturer informed the Town of Bristol in writing on July 8, 2010 that due to an internal miscommunication, the sluice gates that were delivered to the site for installation were actually manufactured in Canada, and not in Massachusetts. The manufacturer has offered to provide these sluice gates at no charge other than the cost for freight and field service. Re-ordering the sluice gates and having them manufactured in the Massachusetts facility would delay the upgrade work to the final clarifiers by at least three months. Unfortunately, the existing final clarifier equipment is failing, and given that existing wastewater flows at the wastewater treatment plant are at seasonal lows, the most opportune time to install the sluice gates would be during the July and August time frame. Based upon information submitted by the Town's consulting engineer, EPA has concluded that requiring the installation of domestic manufactured sluice gates, which would extend the time frame by at least three months, would be inconsistent with the public interest, and that a waiver of the Buy American provisions is justified. The Regional Administrator is making this determination based on the review and recommendations of the Municipal Assistance Unit. The Assistant Administrator of the Office of Administration and Resources Management has concurred on this decision to make an exception to the requirements of Section 1605(a) of ARRA. This action allows the installation of the foreign manufactured influent and effluent sluice gates, as specified in its July 8, 2010 request.
2010 Release of CADDIS (Causal Analysis/Diagnosis Decision Information System)
The U.S. Environmental Protection Agency (EPA) is announcing the public release of the 2010 version of the Causal Analysis/Diagnosis Decision Information System (CADDIS). This Web site was developed to help scientists find, develop, organize, and use environmental information to improve causal assessments of biological impairment. The CADDIS Web site was developed and prepared by EPA's National Center for Environmental Assessment (NCEA), in the Office of Research and Development (ORD), and is available at https://www.epa.gov/caddis.
Hazardous Waste Management System; Identification and Listing of Hazardous Waste; Direct Final Exclusion
EPA is proposing to grant a petition submitted by Eastman Chemical Company-Texas Operations (Eastman) to exclude (or delist) certain solid wastes generated by its Longview, Texas, facility from the lists of hazardous wastes. EPA used the Delisting Risk Assessment Software (DRAS) Version 3.0 in the evaluation of the impact of the petitioned waste on human health and the environment.
Hazardous Waste Management System; Identification and Listing of Hazardous Waste
EPA is proposing to grant a petition submitted by Eastman Chemical Company-Texas Operations (Eastman) to exclude (or delist) certain solid wastes generated by its Longview, Texas, facility from the lists of hazardous wastes. EPA used the Delisting Risk Assessment Software (DRAS) Version 3.0 in the evaluation of the impact of the petitioned waste on human health and the environment.
Approval and Promulgation of Air Quality Implementation Plans; Indiana; Revised Format for Materials Being Incorporated by Reference
EPA is revising the format of its regulations for materials submitted by the State of Indiana that have been incorporated by reference (IBR) into its State Implementation Plan (SIP). The regulations and other materials affected by this format change have all been previously submitted by Indiana and approved by EPA as SIP revisions.
Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality Planning Purposes; Michigan; Redesignation of the Allegan County Areas to Attainment for Ozone
EPA is approving Michigan's request to redesignate the Allegan County, Michigan nonattainment area to attainment for the 1997 8-hour ozone standard because the request meets the statutory requirements for redesignation under the Clean Air Act (CAA). The Michigan Department of Natural Resources and Environment (MDNRE) submitted this request on May 12, 2010, and supplemented it on June 16, 2010. This approval involves several related actions. EPA is making a determination under the CAA that the Allegan County area has attained the 1997 8-hour ozone National Ambient Air Quality Standard (NAAQS). This determination is based on three years of complete, quality-assured and certified ambient air quality monitoring data for the 2007-2009 ozone seasons that demonstrate that the 8-hour ozone NAAQS has been attained in the area. Preliminary data available for 2010 is consistent with continued attainment. EPA is also approving, as a revision to the Michigan State Implementation Plan (SIP), the State's plan for maintaining the 8-hour ozone NAAQS through 2021 in the area. EPA is approving the 2005 emissions inventory submitted with the redesignation request as meeting the comprehensive emissions inventory requirement of the CAA for the Allegan County area. Finally, EPA found adequate and is approving the State's 2021 Motor Vehicle Emission Budgets (MVEBs) for the Allegan County area.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.