Environmental Protection Agency January 7, 2010 – Federal Register Recent Federal Regulation Documents

Approval and Promulgation of Air Quality Implementation Plans; Maryland; 2002 Base Year Emission Inventory, Reasonable Further Progress Plan, Contingency Measures, Reasonably Available Control Measures, and Transportation Conformity Budgets for the Baltimore 1997 8-Hour Moderate Ozone Nonattainment Area
Document Number: 2010-17
Type: Proposed Rule
Date: 2010-01-07
Agency: Environmental Protection Agency
EPA is proposing to approve a revision to the Maryland State Implementation Plan (SIP) to meet the 2002 base year emissions inventory, the reasonable further progress (RFP) plan, RFP contingency measure, and reasonably available control measure (RACM) requirements of the Clean Air Act (CAA) for the Baltimore moderate 1997 8-hour ozone nonattainment area. EPA is also proposing to approve the transportation conformity motor vehicle emissions budgets (MVEBs) and associated with this revision. EPA is proposing to approve the SIP revision because it satisfies the emission inventory, RFP, RACM, RFP contingency measures, and transportation conformity requirements for areas classified as moderate nonattainment for the 1997 8-hour ozone national ambient air quality standard (NAAQS) and demonstrates further progress in reducing ozone precursors. EPA is proposing to approve the SIP revision pursuant to section 110 and part D of the CAA and EPA's regulations.
Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites
Document Number: 2010-16
Type: Notice
Date: 2010-01-07
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA or the Agency) is announcing a 50-day public comment period for draft recommended interim preliminary remediation goals (PRGs) developed in the Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) Sites. EPA's Office of Solid Waste and Emergency and Emergency Response (OSWER) has developed the draft recommended interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer- reviewed toxicity values and current EPA equations and default exposure assumptions.
Approval and Promulgation of Air Quality Implementation Plans; Maryland; 2002 Base Year Emission Inventory, Reasonable Further Progress Plan, Contingency Measures, Reasonably Available Control Measures, and Transportation Conformity Budgets for the Philadelphia 1997 8-Hour Moderate Ozone Nonattainment Area
Document Number: 2010-15
Type: Proposed Rule
Date: 2010-01-07
Agency: Environmental Protection Agency
EPA is proposing to approve a revision to the Maryland State Implementation Plan (SIP) to meet the 2002 base year emissions inventory, the reasonable further progress (RFP) plan, RFP contingency measure, and reasonably available control measure (RACM) requirements of the Clean Air Act (CAA) for the Maryland portion of the Philadelphia moderate 1997 8-hour ozone nonattainment area. EPA is also proposing to approve the transportation conformity motor vehicle emissions budgets (MVEBs) and associated with this revision. EPA is proposing to approve the SIP revision because it satisfies the emission inventory, RFP, RACM, and RFP contingency measures, transportation conformity requirements for areas classified as moderate nonattainment for the 1997 8-hour ozone national ambient air quality standard (NAAQS) and demonstrates further progress in reducing ozone precursors. EPA is proposing to approve the SIP revision pursuant to section 110 and part D of the CAA and EPA's regulations.
Cross-Media Electronic Reporting Rule State Approved Program Revision/Modification Approvals: State of Connecticut
Document Number: 2010-14
Type: Notice
Date: 2010-01-07
Agency: Environmental Protection Agency
This notice announces EPA's approval, under regulations for Cross-Media Electronic Reporting, of the State of Connecticut's request to revise/modify programs to allow electronic reporting for certain of its EPA-authorized programs under title 40 of the CFR.
Oregon: Final Authorization of State Hazardous Waste Management Program Revision
Document Number: 2010-13
Type: Rule
Date: 2010-01-07
Agency: Environmental Protection Agency
Oregon has applied to EPA for final authorization of certain changes to its hazardous waste management program under the Resource Conservation and Recovery Act, as amended (RCRA). On November 18, 2009, EPA published a proposed rule to authorize the changes and opened a public comment period under Docket ID No. EPA-R10-RCRA-2009-0766. The comment period closed on December 18, 2009. EPA has decided that the revisions to the Oregon hazardous waste management program satisfy all of the requirements necessary to qualify for final authorization and EPA is authorizing these revisions to Oregon's authorized hazardous waste management program in this final rule.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.