Environmental Protection Agency October 7, 2008 – Federal Register Recent Federal Regulation Documents

Notice of Availability of Final NPDES General Permits MAG07000 and NHG07000 for Discharges From Dewatering Activities in the Commonwealth of Massachusetts (Including Both Commonwealth and Indian Country Lands) and the State of New Hampshire: the Dewatering General Permit (DGP)
Document Number: E8-23791
Type: Notice
Date: 2008-10-07
Agency: Environmental Protection Agency
The Director of the Office of Ecosystem Protection, EPA-New England, is providing a notice of availability of the final National Pollutant Discharge Elimination System (NPDES) general permits for dewatering activity discharges to certain waters of the Commonwealth of Massachusetts (including both Commonwealth and Indian country lands) and the State of New Hampshire. These General Permits replace the Construction Dewatering General Permits, which expired on September 23, 2007. The notice of availability of the draft NPDES general permits for dewatering activity discharges was published in the Federal Register on July 21, 2008 and the public notice period ran from July 22, 2008 to August 21, 2008. In addition to comments on the draft general permits, EPA also requested comments on the cost associated with a limit for total residual chlorine (TRC) for discharges containing potable water. No comments were received during the public notice period regarding either the draft permits or the cost associated with a TRC limit for discharges containing potable water. The final General Permits establish Notice of Intent (NOI) requirements, effluent limitations, standards, prohibitions, and management practices for facilities with construction dewatering of groundwater intrusion and/or storm water accumulation from sites less than one acre and short-term and long-term dewatering of foundation sumps. Based on inter-governmental agency review, the following changes have been made from the draft permit: Appendix III was updated to include the most recent information regarding federally-listed threatened and endangered species and the process by which permittees determine if the Endangered Species Act criteria are met. Coverage for and references to discharges originating from flushing of potable water lines and pump testing of water wells were removed from the General Permit. Facilities with these types of discharges retain the ability to apply for coverage under an individual permit. Owners and/or operators of facilities with dewatering discharges, including those currently authorized to discharge under the expired General Permits, will be required to submit an NOI to be covered by the General Permit to both EPA-New England and the appropriate state agency. After EPA and the State have reviewed the NOI, the facility will receive a written notification from EPA of permit coverage and authorization to discharge under the General Permit. The eligibility requirements for coverage under the general permits are discussed in detail under Part 3 of the permit. The reader is strongly urged to go to that section to determine eligibility. An individual permit may be necessary if the discharger cannot meet the terms and conditions or eligibility requirements in the permit.
Consumer and Commercial Products, Group IV: Control Techniques Guidelines in Lieu of Regulations for Miscellaneous Metal Products Coatings, Plastic Parts Coatings, Auto and Light-Duty Truck Assembly Coatings, Fiberglass Boat Manufacturing Materials, and Miscellaneous Industrial Adhesives
Document Number: E8-23750
Type: Rule
Date: 2008-10-07
Agency: Environmental Protection Agency
Pursuant to Section 183(e)(3)(C) of the Clean Air Act, EPA has determined that control techniques guidelines will be substantially as effective as national regulations in reducing emissions of volatile organic compounds in ozone national ambient air quality standard nonattainment areas from the following five Group IV product categories: miscellaneous metal products coatings, plastic parts coatings, auto and light-duty truck assembly coatings, fiberglass boat manufacturing materials, and miscellaneous industrial adhesives. Based on this determination, EPA is issuing control techniques guidelines in lieu of national regulations for these product categories. These control techniques guidelines will provide guidance to the States concerning EPA's recommendations for reasonably available control technology-level controls for these product categories. EPA further takes final action to list the five Group IV consumer and commercial product categories addressed in this notice pursuant to CAA Section 183(e).
Proposed Administrative Cost Settlement Under Section 122(h)(1) of the Comprehensive Environmental Response, Compensation and Liability Act; In the Matter of the Illinois Power Subarea of the Ottawa Radiation Site, Ottawa, IL
Document Number: E8-23746
Type: Notice
Date: 2008-10-07
Agency: Environmental Protection Agency
In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the Illinois Power subarea of the Ottawa Radiation Superfund Site in Ottawa, Illinois with Illinois Power Company d/b/a Ameren IP. The settlement requires the settling parties to: operate and maintain a radon reduction system at the property; record a restrictive covenant that prohibits interference with the building foundations and system; agree to use a covenant deed that reserves the right for Illinois Power, U.S. EPA and the State to enforce the restrictive covenant if Illinois Power conveys the property; and reimburse $35,000 of U.S. EPA's response costs incurred at the Illinois Power subarea. In exchange for the payment and work performed, the United States covenants not to sue or take administrative action pursuant to Sections 106, 107 and 122 of CERCLA, 42 U.S.C. 9606, 9607 and 9622 for the work and past response costs at the Illinois Power subarea of the Ottawa Radiation Site. In addition, Illinois Power is entitled to protection from contribution actions or claims as provided by Sections 113(f) and 122(h)(4) of CERCLA, 42 U.S.C. 9613(f) and 9622(h)(4), for the work performed and past costs incurred at the Site. For thirty (30) days after the date of publication of this notice, the Agency will receive written comments relating to the cost recovery provisions of the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at U.S. EPA's Region 5 Office at 77 West Jackson Boulevard, Chicago, Illinois 60604.
Cross-Media Electronic Reporting Rule State Authorized/Approved Program Modification/Revision Approval: State of Oklahoma
Document Number: E8-23693
Type: Notice
Date: 2008-10-07
Agency: Environmental Protection Agency
This action announces EPA's approval, under regulations for Cross-Media Electronic Reporting, of the State of Oklahoma's request for modifications/revisions to their authorized programs to allow electronic reporting for certain of their authorized programs under title 40 and specific reports.
Notice of Meeting of the EPA's Children's Health Protection Advisory Committee (CHPAC)
Document Number: E8-23687
Type: Notice
Date: 2008-10-07
Agency: Environmental Protection Agency
Pursuant to the provisions of the Federal Advisory Committee Act, Public Law 92-463, notice is hereby given that the next meeting of the Children's Health Protection Advisory Committee (CHPAC) will be held October 21-23, 2008 at The Churchill Hotel, Washington, DC. The CHPAC was created to advise the Environmental Protection Agency on science, regulations, and other issues relating to children's environmental health.
Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment Request; Nonconformance Penalties for Heavy-Duty Engines and Heavy-Duty Vehicles, Including Light-Duty Trucks (Renewal); EPA ICR Number 1285.07, OMB Control Number 2060-0132
Document Number: E8-23686
Type: Notice
Date: 2008-10-07
Agency: Environmental Protection Agency
In compliance with the Paperwork Reduction Act (PRA) (44 U.S.C. 3501 et seq.), this document announces that an Information Collection Request (ICR) has been forwarded to the Office of Management and Budget (OMB) for review and approval. This is a request to renew an existing approved collection. The ICR, which is abstracted below, describes the nature of the information collection and its estimated burden and cost.
California State Nonroad Engine Pollution Control Standards; California Nonroad Compression Ignition Engines-In-Use Fleets; Authorization Request; Opportunity for Public Hearing
Document Number: E8-23682
Type: Notice
Date: 2008-10-07
Agency: Environmental Protection Agency
The California Air Resources Board (CARB) has notified EPA that it has adopted emission standards for fleets that operate nonroad, diesel fueled equipment with engines 25 horsepower (hp) and greater. By letter dated August 12, 2008, CARB submitted a request seeking EPA authorization, pursuant to section 209(e) of the Clean Air Act (CAA), 42 U.S.C. 7543(e), of its regulation requiring such fleets to meet fleet average emissions standards for oxides of nitrogen and particulate matter, or, alternatively, to comply with best available control technology requirements for the vehicles in those fleets. This notice announces that EPA has tentatively scheduled a public hearing concerning California's request and that EPA is accepting written comment on the request.
Approval and Promulgation of Air Quality Implementation Plans; Texas; Reasonable Further Progress Plan, Motor Vehicle Emissions Budgets and Revised 2002 Emissions Inventory; Dallas/Fort Worth Ozone Nonattainment Area
Document Number: E8-23674
Type: Proposed Rule
Date: 2008-10-07
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is proposing to approve a revision to the Texas State Implementation Plan (SIP) to meet the Reasonable Further Progress (RFP) requirements of the Clean Air Act (CAA) for the Dallas/Fort Worth (DFW) moderate 1997 8-hour ozone nonattainment area. EPA is also proposing to approve the RFP motor vehicle emissions budgets (MVEBs) and a revised 2002 Base Year Emission Inventory associated with the revision. EPA is proposing to approve the SIP revision because it satisfies the RFP, RFP transportation conformity, and Emissions Inventory requirements for 1997 8-hour ozone nonattainment areas classified as moderate, and demonstrates further progress in reducing ozone precursors. EPA is proposing to approve the revision pursuant to section 110 and part D of the CAA and EPA's regulations.
Approval and Promulgation of Air Quality Implementation Plans; Texas; Reasonable Further Progress Plan, Motor Vehicle Emissions Budgets, and Revised 2002 Base Year Emissions Inventory; Dallas/Fort Worth 1997 8-Hour Ozone Nonattainment Area
Document Number: E8-23673
Type: Rule
Date: 2008-10-07
Agency: Environmental Protection Agency
The Environmental Protection Agency (EPA) is approving a revision to the Texas State Implementation Plan (SIP) to meet the Reasonable Further Progress (RFP) requirements of the Clean Air Act (CAA) for the Dallas/Fort Worth (DFW) moderate 1997 8-hour ozone nonattainment area. EPA is also approving the RFP motor vehicle emissions budgets (MVEBs) and a revised 2002 Base Year Emissions Inventory associated with the revision. EPA is approving the SIP revision because it satisfies the RFP, RFP transportation conformity and Emissions Inventory requirements for 1997 8-hour ozone nonattainment areas classified as moderate and demonstrates further progress in reducing ozone precursors. EPA is approving the revision pursuant to section 110 and part D of the CAA and EPA's regulations.
California State Nonroad Engine Pollution Control Standards; California Nonroad Compression Ignition Engines; Within-the-Scope Request; Opportunity for Public Hearing
Document Number: E8-23671
Type: Notice
Date: 2008-10-07
Agency: Environmental Protection Agency
The California Air Resources Board (CARB) has notified EPA that it has amended or adopted emission standards and accompanying testing procedures for new nonroad compression ignition (CI) engines in two CARB rulemakings. By letter dated July 18, 2007, CARB submitted a request seeking EPA confirmation that its amendments affecting three broad power categories expressed in kilowatts (kW) (under 19 kW, 19 kW to under 130 kW, and 130kW and greater) are within the scope of previous authorizations issued by EPA under section 209(e) of the Clean Air Act (CAA), 42 U.S.C. 7543(e). In the alternative CARB seeks a new authorization for these standards. This notice announces that EPA has tentatively scheduled a public hearing concerning California's request and that EPA is accepting written comment on the request.
Agency Information Collection Activities; Proposed Collection; Comment Request; Environmental and Economic Effects of Environmental Conflict Resolution at EPA; EPA ICR No. 2306.01, OMB Control No. 2090-NEW
Document Number: E8-23670
Type: Notice
Date: 2008-10-07
Agency: Environmental Protection Agency
In compliance with the Paperwork Reduction Act (PRA) (44 U.S.C. 3501 et seq.), this document announces that EPA is planning to submit a request for a new Information Collection Request (ICR) to the Office of Management and Budget (OMB). Before submitting the ICR to OMB for review and approval, EPA is soliciting comments on specific aspects of the proposed information collection as described below.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.