Surface Transportation Board March 22, 2013 – Federal Register Recent Federal Regulation Documents

Quarterly Rail Cost Adjustment Factor
Document Number: 2013-06662
Type: Notice
Date: 2013-03-22
Agency: Surface Transportation Board, Department of Transportation
The Board has approved the second quarter 2013 Rail Cost Adjustment Factor (RCAF) and cost index filed by the Association of American Railroads. The second quarter 2013 RCAF (Unadjusted) is 1.006. The second quarter 2013 RCAF (Adjusted) is 0.438. The second quarter 2013 RCAF-5 is 0.414.
Tongue River Railroad Company, Inc.-Rail Construction and Operation-In Custer, Powder River and Rosebud Counties, Mont.
Document Number: 2013-06625
Type: Notice
Date: 2013-03-22
Agency: Surface Transportation Board, Department of Transportation
On October 16, 2012, Tongue River Railroad Company, Inc. (TRRC) filed a revised application with the Surface Transportation Board (Board) pursuant to 49 U.S.C. 10901 in Docket No. FD 30186. TRRC intended to construct and operate \1\ an approximately 83-mile rail line between Miles City, Montana, and two ending points, one near the site of the previously planned Montco Mine near Ashland, Montana, and another at the proposed Otter Creek Mine in the Otter Creek area east of Ashland, Montana. On November 1, 2012, the Board issued a decision requesting additional information from TRRC. On December 17, 2012, TRRC filed a supplemental application that supersedes the October 16, 2012 application. As discussed in the supplemental application, TRRC modified its proposal by identifying its preferred routing for the proposed line as the Colstrip Alterative between Colstrip, Montana, and Ashland/Otter Creek, Montana. On January 8, 2013, the Board issued a decision accepting TRRC's supplemental application and later denied a request to reconsider that decision and reject the supplemental application in a decision served on February 26, 2013. The purpose of the proposed line is to transport low sulfur, sub-bituminous coal from proposed mine sites in Rosebud and Powder River Counties, Montana. Because the construction and operation of this project has the potential to result in significant environmental impacts, the Board's Office of Environmental Analysis (OEA) has determined that the preparation of an Environmental Impact Statement (EIS) is appropriate pursuant to the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.).