Surface Transportation Board January 8, 2009 – Federal Register Recent Federal Regulation Documents

Union Pacific Railroad Company-Temporary Trackage Rights Exemption-BNSF Railway Company
Document Number: E9-84
Type: Notice
Date: 2009-01-08
Agency: Surface Transportation Board, Department of Transportation
30-Day Notice and Request for Comments
Document Number: E9-128
Type: Notice
Date: 2009-01-08
Agency: Surface Transportation Board, Department of Transportation
As part of its continuing effort to reduce paperwork burdens, and as required by the Paperwork Reduction Act of 1995, 44 U.S.C. 3501 et seq. (PRA), the Surface Transportation Board (Board) gives notice that it is requesting from the Office of Management and Budget (OMB) an extension of approval without change of the seven existing collections described below. Comments are requested concerning each collection as to (1) whether the particular collection of information is necessary for the proper performance of the functions of the Board, including whether the collection has practical utility; (2) the accuracy of the Board's burden estimates; (3) ways to enhance the quality, utility, and clarity of the information collected; and (4) ways to minimize the burden of the collection of information on the respondents, including the use of automated collection techniques or other forms of information technology, when appropriate.
Bellingham International Railroad, LLC-Abandonment Exemption-in Whatcom County, WA
Document Number: E9-107
Type: Notice
Date: 2009-01-08
Agency: Surface Transportation Board, Department of Transportation
R.J. Corman Railroad Company/Pennsylvania Lines Inc.-Construction and Operation Exemption-in Clearfield County, PA
Document Number: E9-106
Type: Notice
Date: 2009-01-08
Agency: Surface Transportation Board, Department of Transportation
On May 20, 2008, R.J. Corman Railroad Company/Pennsylvania Lines Inc. (RJCP) filed a petition with the Surface Transportation Board (Board) pursuant to 49 U.S.C. 10502 for authority to construct and operate an abandoned 10.8-mile rail line between Wallaceton Junction and Winburne in Clearfield County, Pennsylvania (the Western Segment) and to rebuild the track on a connecting 9.3-mile line between Winburne and Gorton in Clearfield and Centre Counties, Pennsylvania (the Eastern Segment) that is currently being used for interim trail use, subject to the possible restoration of rail service (rail banking) pursuant to the Trails Act, 16 U.S.C. 1247(d). In total, the proposed project would involve the construction or rebuilding, and operation, of approximately 20 miles of the former Beech Creek Railroad to serve a new quarry, landfill, and industrial park being developed by Resource Recovery, LLC, near Gorton, Pennsylvania. Because this project has the potential to result in significant environmental impacts, the Board's Section of Environmental Analysis (SEA) has determined that the preparation of an Environmental Impact Statement (EIS) is appropriate pursuant to the National Environmental Policy Act of 1969 (NEPA), as amended (42 U.S.C. 4321 et seq.). The purpose of this Notice of Intent is to notify individuals and agencies interested in or affected by the proposed project of the decision to prepare an EIS. SEA will hold a public scoping meeting as part of the NEPA process associated with the development of the EIS. Additionally, as part of the scoping process, SEA has developed a draft Scope of Study for the EIS for review and comment. The public meeting date and location, along with the draft Scope of Study, are provided below: Date and Location: The public scoping meeting will be held: Tuesday, February 10, 2009, 6-8 p.m., Philipsburg-Osceola Area Senior High School, 502 Philips Street, Philipsburg, PA 16866-1899. The public scoping meeting will be held in an informal open-house format during which interested persons may ask questions about the proposed project and the Board's environmental review process, and advise SEA staff about potential environmental effects of the project. No formal presentations will be made by agency representatives. SEA staff will be available to answer questions and receive comments individually. Interested parties are invited to submit written comments on the draft Scope of Study, alternatives to the proposed rail line, and other environmental issues and concerns by February 24, 2009, to assure full consideration during the scoping process. SEA will issue a final Scope of Study after the close of the scoping comment period.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.