Surface Transportation Board November 1, 2005 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
The Alaska Railroad Corporation-Petition for Exemption to Construct and Operate a Rail Line Between Eielson Air Force Base (North Pole) and Fort Greely (Delta Junction), Alaska
The Alaska Railroad Corporation plans to file a petition with the Surface Transportation Board (Board) pursuant to 49 U.S.C. 10502 for authority to construct and operate a new rail line between Eielson Air Force Base (located south of Fairbanks) and the Delta Junction/Fort Greely area. The project would involve the construction and operation of approximately 80 miles of new main line track and could include an approximately 15-mile rail spur to the U.S. Air Force's Blair Lakes training area. Because the construction and operation of this project has the potential to result in significant environmental impacts, the Board's Section on Environmental Analysis (SEA) has determined that the preparation of an Environmental Impact Statement (EIS) is appropriate. The purpose of this Notice of Intent is to notify individuals and agencies interested in or affected by the proposed project of the decision to require an EIS. SEA is holding public scoping meetings as part of the EIS process. Additionally, as part of the scoping process, SEA has developed a draft Scope of Study for the EIS.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.