Pipeline and Hazardous Materials Safety Administration June 2010 – Federal Register Recent Federal Regulation Documents
Results 1 - 7 of 7
Pipeline Safety: Updating Facility Response Plans in Light of the Deepwater Horizon Oil Spill
PHMSA is issuing an Advisory Bulletin to operators of hazardous liquid pipeline facilities required to prepare and submit an oil spill response plan under 49 CFR part 194. In light of the Deepwater Horizon oil spill in the Gulf of Mexico, which has resulted
Pipeline Safety: Information Collection Gas Distribution Annual Report Form
As required by the Paperwork Reduction Act of 1995 (PRA), the Pipeline and Hazardous Materials Safety Administration (PHMSA) published a notice in the Federal Register on December 4, 2009, under Docket No. PHMSA-2004-19854 of its intent to revise the agency's Gas Distribution System Annual Report Form (PHMSA F 7100.1-1). PHMSA F 7100.1-1 is covered under the PHMSA information collection titled: ``Incident and Annual Reports for Gas Pipeline Operators,'' with an OMB Control Number of 2137-0522. PHMSA is publishing this notice to respond to comments and announce that the revised information collection will be submitted to OMB for approval. This notice also informs operators of gas distribution systems that PHMSA is planning for the revised Annual Report Form, once approved, to be used for the 2010 calendar year and submitted to PHMSA by March 15, 2011. The portion of the annual report relative to mechanical fitting (compression couplings) failures will be delayed by one year and will take effect starting with the 2011 calendar year.
Pipeline Safety: Request for Special Permit
Pursuant to the Federal pipeline safety laws, PHMSA is publishing this notice of special permit request we have received from a hazardous liquid pipeline operator, Anchor Point Energy, LLC. Anchor Point Energy, LLC is seeking relief from compliance with certain plastic pipe design requirements in the Federal pipeline safety regulations in connection with the Class 1 location portion of a 7.4 mile natural gas pipeline to be constructed in Alaska. This notice seeks public comments on this request, including comments on any safety or environmental impacts. At the conclusion of the 30-day comment period, PHMSA will evaluate the request and determine whether to grant or deny a special permit.
Pipeline Safety: Applying Safety Regulation to All Rural Onshore Hazardous Liquid Low-Stress Lines
PHMSA is proposing to amend its pipeline safety regulations to apply safety regulations to rural low-stress hazardous liquid pipelines that are not covered by safety regulations in 49 CFR Part 195. This change complies with a mandate in the Pipeline Inspection, Protection, Enforcement, and Safety Act of 2006 (PIPES Act).
Office of Hazardous Materials Safety; Notice of Application for Special Permits
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR part 107, subpart B), notice is hereby given that the Office of Hazardous Materials Safety has received the application described herein. Each mode of transportation for which a particular special permit is requested is indicated by a number in the ``Nature of Application'' portion of the table below as follows: 1Motor vehicle, 2Rail freight, 3Cargo vessel, 4Cargo aircraft only, 5Passenger-carrying aircraft.
Office of Hazardous Materials Safety; Notice of Applications for Modification of Special Permit
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR part 107, subpart B), notice is hereby given that the Office of Hazardous Materials Safety has received the applications described herein. This notice is abbreviated to expedite docketing and public notice. Because the sections affected, modes of transportation, and the nature of application have been shown in earlier Federal Register publications, they are not repeated here. Requests for modification of special permits (e.g. to provide for additional hazardous materials, packaging design changes, additional mode of transportation, etc.) are described in footnotes to the application number. Application numbers with the suffix ``M'' denote a modification request. These applications have been separated from the new application for special permits to facilitate processing.
Pipeline Safety: Workshop on Public Awareness Programs
PHMSA is co-sponsoring a one day public awareness workshop with the National Association of Pipeline Safety Representatives (NAPSR). The workshop will be an opportunity, following the initial four-year implementation cycle, to review the implementation process, identify what implementation strategies have worked well, discuss challenges faced by the pipeline industry, discuss Federal and state regulatory oversight, learn about public interest and need for information about pipelines in their communities, and identify critical elements of a successful operator public awareness program. Pipeline trade associations, the Pipeline Safety Trust, the National Transportation Safety Board, and pipeline operators will share lessons learned from implementing their public awareness programs based on Federal regulations. PHMSA and state partners will discuss the scope of and timeline for conducting effectiveness evaluations. PHMSA and our state partners will use the results from this event, in addition to existing inspection activities, to further develop our programs for evaluating pipeline operator public awareness programs. The workshop will be webcast live, in real time and presentations will be made available following the workshop.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.