Pipeline and Hazardous Materials Safety Administration July 2007 – Federal Register Recent Federal Regulation Documents
Results 1 - 10 of 10
Office of Hazardous Materials Safety; Notice of Delays in Processing of Special Permits Applications
In accordance with the requirements of 49 U.S.C. 5117(c), PHMSA is publishing the following list of special permit applications that have been in process for 180 days or more. The reason(s) for delay and the expected completion date for action on each application is provided in association with each identified application.
Pipeline and Hazardous Materials Safety Administration Office of Hazardous Materials Safety; Notice of Application for Special Permits
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR Part 107, Subpart B), notice is hereby given that the Office of Hazardous Materials Safety has received the application described herein. Each mode of transportation for which a particular special permit is requested is indicated by a number in the ``Nature of Application'' portion of the table below as follows: 1Motor vehicle, 2Rail freight, 3Cargo vessel, 4Cargo aircraft only, 5Passenger-carrying aircraft.
Office of Hazardous Materials Safety; Notice of Applications for Modification of Special Permit
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR Part 107, Subpart B), notice is hereby given that the Office of Hazardous Materials Safety has received the application described herein. This notice is abbreviated to expedite docketing and public notice. Because the sections affected, modes of transportation, and the nature of application have been shown in earlier Federal Register publications, they are not repeated here. Request of modifications of special permits (e.g. to provide for additional hazardous materials, packaging design changes, additional mode of transportation, etc.) are described in footnotes to the application number. Application numbers with the suffix ``M'' denote a modification request. There applications have been separated from the new application for special permits to facilitate processing.
Pipeline Safety: Integrity Management Program Modifications and Clarifications
This action modifies the integrity management regulations for hazardous liquid and natural gas transmission pipelines. The modifications include adding an eight-month window to the period for reassessing hazardous liquid pipelines; modifying notification requirements for operators of hazardous liquid and natural gas pipelines; repealing a requirement for gas operators to notify local authorities; and allowing alternatives in calculating pressure reduction when making an immediate repair on a hazardous liquid pipeline. This action is intended to improve pipeline safety by clarifying the integrity management regulations and providing operators with increased flexibility in implementing their integrity management (IM) programs.
Request for Public Comments and Office of Management and Budget Approval of Existing Information Collection Requirement
In compliance with the Paperwork Reduction Act of 1995 (PRA), this notice announces that PHMSA forwarded an Information Collection Request to the Office of Management and Budget (OMB) for an extension of the currently approved collection of information ``Incorporation by Reference of Industry Standard on Leak Detection'' (2137-0598). The purpose of this notice is to invite the public to submit comments on the request to OMB.
Request for Public Comments and Office of Management and Budget Approval of a Change to an Existing Information Collection (2137-0604, 2137-0605, and 2137-0610)
In compliance with the Paperwork Reduction Act of 1995 (PRA), this notice announces that PHMSA forwarded an Information Collection Request to the Office of Management and Budget (OMB) for a change to an existing information collection for pipeline integrity management (IM). The purpose of this notice is to allow the public an additional 30 days to submit comments.
Hazardous Materials: Conversion of Special Permits into Regulations of General Applicability
PHMSA is in the process of reviewing widely-used special permits to identify those that have proven safety records and should be converted into the Hazardous Materials Regulations (HMR) as regulations of general applicability. A special permit is an authorization issued by PHMSA that allows a company or individual to package or ship a hazardous material in a manner that varies from the regulations provided an equivalent level of safety is maintained or that, in an emergency, is necessary to protect life or property. Incorporation of special permits into the HMR is a regulatory reform effort.
Pipeline Safety: Requests for Waivers of Compliance (Special Permits)
The Federal pipeline safety laws allow a pipeline operator to request PHMSA to waive compliance with any part of the Federal pipeline safety regulations. We are publishing this notice to provide a list of requests we have received from pipeline operators seeking relief from compliance with certain pipeline safety regulations. This notice seeks public comment on these requests, including comments on any environmental impacts. In addition, this notice reminds the public that we have changed what we call a decision granting such a request to a special permit. At the conclusion of the comment period, PHMSA will evaluate each request individually to determine whether to grant a special permit or deny the request.
Information Collection Activities
In accordance with the Paperwork Reduction Act of 1995, PHMSA invites comments on an information collection under Office of Management and Budget (OMB) Control No. 2137-0586, pertaining to Hazardous Materials Public Sector Training and Planning Grants. PHMSA will request approval from OMB for a revision to the current information collection. The revision implements a statutory provision authorizing PHMSA to request information from states concerning fees related to the transportation of hazardous materials. In addition, we are revising the current information collection to include more detailed information from grantees to enable us to more accurately evaluate the effectiveness of the grant program in meeting emergency response planning and training needs.
Hazardous Materials: Revision of Requirements for Emergency Response Telephone Numbers
In this NPRM, PHMSA proposes to amend the Hazardous Materials Regulations (HMR) to clarify requirements governing emergency response information services provided by arrangement with hazardous materials offerors. In order to preserve the effectiveness of these arrangements for providing accurate and timely emergency response information, PHMSA proposes to require that basic identifying information (offeror name or contract number) be included in shipping papers. This information will enable the service provider to identify the shipper on whose behalf it is accepting responsibility for providing emergency response information in the event of a hazardous materials incident.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.