Pipeline and Hazardous Materials Safety Administration November 2006 – Federal Register Recent Federal Regulation Documents
Results 1 - 7 of 7
Pipeline Safety: Request for Waiver; Kinder Morgan Louisiana Pipeline, L.L.C.
Kinder Morgan Louisiana Pipeline L.L.C. (KMLP) requests a waiver to use a 0.80 design factor in the steel pipe design formula for Class 1 locations on Leg 1 of its proposed natural gas interstate Kinder Morgan Louisiana Pipeline. The waiver will allow KMLP to design, construct and operate Leg 1 of its pipeline at hoop stresses up to 80 percent of the specified minimum yield strength (SMYS) in Class 1 locations. KMLP seeks relief from the related capacity design requirements for pressure relieving and pressure limiting stations on the same segment of the proposed pipeline.
Pipeline Safety: Notice to Operators of Natural Gas and Hazardous Liquid Pipelines To Accurately Locate and Mark Underground Pipelines Before Construction-Related Excavation Activities Commence Near the Pipelines
This advisory reminds and reinforces the importance of safe locating excavation practices near underground pipelines. PHMSA's pipeline safety regulations require pipeline operators to implement damage prevention programs to protect underground pipelines during construction related excavation. In addition, PHMSA recommends pipeline operators excavating in areas populated with other pipelines and utilities follow all consensus best practices and guidelines developed by the Common Ground Alliance. Recent serious incidents especially reinforce the importance of accurately locating and marking pipelines and highlight an urgent need for pipeline operators to review how they implement their damage prevention programs to prevent further accidents caused by construction related damage. This Advisory Bulletin provides guidance on how to do this.
International Standards on the Transport of Dangerous Goods; Public Meeting
This notice is to advise interested persons that PHMSA will conduct a public meeting in preparation for the 30th session of the United Nation's Sub-Committee of Experts on the Transport of Dangerous Goods (UNSCOE) to be held 4-12 (a.m.) December 2006 in Geneva, Switzerland.
Hazardous Materials: Improving the Safety of Railroad Tank Car Transportation of Hazardous Materials
PHMSA and FRA are conducting a comprehensive review of design and operational factors that affect rail tank car safety. The two agencies invite interested persons to participate in a public meeting to address potential improvements to the design of hazardous materials tank cars that would enhance overall safety and security.
Office of Hazardous Materials Safety; Notice of Applications for Modification of Special Permit
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR Part 107, Subpart B), notice is hereby given that the Office of Hazardous Materials Safety has received the application described herein. This notice is abbreviated to expedite docketing and public notice. Because the sections affected, modes of transportation, and the nature of application have been shown in earlier Federal Register publications, they are not repeated here. Request of modifications of special permits (e.g. to provide for additional hazardous materials, packaging design changes, additional mode of transportation, etc.) are described in footnotes to the application number. Application numbers with the suffix ``M'' denote a modification request. These applications have been separated from the new applications for special permits to facilitate processing.
Office of Hazardous Materials Safety; Notice of Application for Special Permits
In accordance with the procedures governing the application for, and the processing of, special permits from the Department of Transportation's Hazardous Material Regulations (49 CFR Part 107, Subpart B), notice is hereby given that the Office of Hazardous Materials Safety has received the application described herein. Each mode of transportation for which a particular special permit is requested is indicated by a number in the ``Nature of Application'' portion of the table below as follows: 1Motor vehicle, 2Rail freight, 3Cargo vessel, 4Cargo aircraft only, 5Passenger-carrying aircraft.
Office of Hazardous Materials Safety; Notice of Delays in Processing of Special Permit Applications
In accordance with the requirements of 49 U.S.C. 5117(c), PHMSA is publishing the following list of special permit applications that have been in process for 180 days or more. The reason(s) for delay and the expected completion date for action on each application is provided in association with each identified application.