Pipeline Safety: Request for Waiver; Southern LNG
Southern LNG (SLNG), requested a waiver of compliance from the regulatory requirements at 49 CFR 193.2301, which requires each LNG facility constructed after March 31, 2000 to comply with 49 CFR 193 and ANSI/NFPA 59A.
Pipeline Safety: Petition for Waiver; BOC Gases
BOC Gases (BOC) petitioned the PHMSA's Office of Pipeline Safety (OPS) for a waiver from the pipeline safety standards at 49 CFR 195.306(c)(5) to allow the use of inert gas or carbon dioxide as the test medium for pressure testing an existing carbon dioxide pipeline.