Federal Highway Administration October 3, 2016 – Federal Register Recent Federal Regulation Documents

Revise Notice of Intent for an Environmental Impact Statement: North-South Corridor Study: Interstate 10 to U.S. Highway 60, Pinal County, Arizona
Document Number: 2016-23784
Type: Notice
Date: 2016-10-03
Agency: Federal Highway Administration, Department of Transportation
A NOI to prepare an Environmental Impact Statement (EIS) was published in the Federal Register on September 20, 2010. The FHWA is issuing this notice to advise the public of a change to the environmental review process for the proposed North-South Corridor. The FHWA and the project sponsor, the Arizona Department of Transportation (ADOT), intend to use a tiered process in which a Tier 1 EIS will be prepared to evaluate potential corridor alternatives, along with a No- Action alternative, for a future project-specific alignment. The proposed tiering approach will allow FHWA and ADOT to evaluate a range of potential corridors within the North-South Corridor Study (NSCS) area boundaries and to broadly evaluate social, economic, and environmental impacts and mitigation approaches in the Tier 1 EIS. In addition, the NSCS area will be expanded to include an adjacent State Route 24 (SR 24) corridor study resulting in an updated study area encompassing the original study area between Interstate 10 (I-10) and U.S. Highway 60 (U.S. 60) and adding the extension of SR 24 from Ironwood Drive to the North-South Corridor in Pinal County, Arizona. The Tier 1 analysis will utilize technical data obtained thus far in the environmental review process and collect other information as required. If the Record of Decision identifies an Action (Build) corridor alternative, subsequent projects will complete a Tier 2 National Environmental Policy Act (NEPA) review where the agencies will evaluate project-level, site-specific impacts, and required mitigation and commitments.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.