Department of Transportation February 27, 2015 – Federal Register Recent Federal Regulation Documents
Results 1 - 8 of 8
Special Conditions: Bombardier Aerospace Incorporated, Models BD-500-1A10 and BD-500-1A11 Series Airplanes; Electronic Flight Control System: Pitch and Roll Limiting Functions
This action proposes special conditions for the Bombardier Aerospace Models BD-500-1A10 and BD-500-1A11 Series Airplanes. These airplanes will have a novel or unusual design feature associated with the fly-by-wire electronic flight control system (EFCS) that limits pitch- and roll-attitude functions to prevent the airplane from attaining certain pitch attitudes and roll angles. This system generates the actual surface commands that provide for stability augmentation and flight control for all three-airplane axes (longitudinal, lateral, and directional). The applicable airworthiness regulations do not contain adequate or appropriate safety standards for this design feature. These proposed special conditions contain the additional safety standards that the Administrator considers necessary to establish a level of safety equivalent to that established by the existing airworthiness standards.
Standard Instrument Approach Procedures, and Takeoff Minimums and Obstacle Departure Procedures; Miscellaneous Amendments
This rule amends, suspends, or removes Standard Instrument Approach Procedures (SIAPs) and associated Takeoff Minimums and Obstacle Departure Procedures for operations at certain airports. These regulatory actions are needed because of the adoption of new or revised criteria, or because of changes occurring in the National Airspace System, such as the commissioning of new navigational facilities, adding new obstacles, or changing air traffic requirements. These changes are designed to provide for the safe and efficient use of the navigable airspace and to promote safe flight operations under instrument flight rules at the affected airports.
Standard Instrument Approach Procedures, and Takeoff Minimums and Obstacle Departure Procedures; Miscellaneous Amendments
This rule establishes, amends, suspends, or removes Standard Instrument Approach Procedures (SIAPs) and associated Takeoff Minimums and Obstacle Departure Procedures (ODPs) for operations at certain airports. These regulatory actions are needed because of the adoption of new or revised criteria, or because of changes occurring in the National Airspace System, such as the commissioning of new navigational facilities, adding new obstacles, or changing air traffic requirements. These changes are designed to provide safe and efficient use of the navigable airspace and to promote safe flight operations under instrument flight rules at the affected airports.
Standard Instrument Approach Procedures, and Takeoff Minimums and Obstacle Departure Procedures; Miscellaneous Amendments
This rule amends, suspends, or removes Standard Instrument Approach Procedures (SIAPs) and associated Takeoff Minimums and Obstacle Departure Procedures for operations at certain airports. These regulatory actions are needed because of the adoption of new or revised criteria, or because of changes occurring in the National Airspace System, such as the commissioning of new navigational facilities, adding new obstacles, or changing air traffic requirements. These changes are designed to provide for the safe and efficient use of the navigable airspace and to promote safe flight operations under instrument flight rules at the affected airports.
Standard Instrument Approach Procedures, and Takeoff Minimums and Obstacle Departure Procedures; Miscellaneous Amendments
This rule establishes, amends, suspends, or removes Standard Instrument Approach Procedures (SIAPs) and associated Takeoff Minimums and Obstacle Departure Procedures (ODPs) for operations at certain airports. These regulatory actions are needed because of the adoption of new or revised criteria, or because of changes occurring in the National Airspace System, such as the commissioning of new navigational facilities, adding new obstacles, or changing air traffic requirements. These changes are designed to provide safe and efficient use of the navigable airspace and to promote safe flight operations under instrument flight rules at the affected airports.
Interim Safety Certification Training Program Provisions
This document announces interim safety certification training provisions for Federal and State Safety Oversight Agency personnel and their contractor support who conduct safety audits and examinations of public transportation systems not otherwise regulated by another Federal agency. This document also announces interim safety certification training provisions for public transportation agency personnel who are directly responsible for safety oversight of public transportation systems that receive Federal transit funding. Additionally, the document outlines voluntary, scalable training available to personnel of State Departments of Transportation and personnel directly responsible for safety oversight of urban and rural bus transit systems.
State Safety Oversight
This notice seeks public comment on proposed rules that would transform and strengthen State Safety Oversight (SSO) of rail fixed guideway public transportation systems. FTA will issue a final rule and response to comments following the close of the comment period. Once FTA issues a final rule, the agency will rescind its current regulations.
Risk Reduction Program
The Rail Safety Improvement Act of 2008 requires the development and implementation of railroad safety risk reduction programs. This NPRM proposes to implement this mandate by requiring each Class I railroad and each railroad with inadequate safety performance to develop and implement a Risk Reduction Program (RRP) to improve the safety of their operations. RRP is a comprehensive, system- oriented approach to safety that determines an operation's level of risk by identifying and analyzing applicable hazards and involves developing plans to mitigate, if not eliminate, that risk. Each RRP would be statutorily required to include a risk analysis and a technology implementation plan. An RRP would be implemented by a written RRP plan that has been submitted to FRA for review and approval. A railroad would be required to conduct an annual internal assessment of its RRP, and a railroad's RRP processes and procedures would be externally audited by FRA.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.