Department of Transportation August 14, 2013 – Federal Register Recent Federal Regulation Documents

Airworthiness Directives; The Boeing Company Airplanes
Document Number: 2013-19753
Type: Proposed Rule
Date: 2013-08-14
Agency: Federal Aviation Administration, Department of Transportation
We propose to adopt a new airworthiness directive (AD) for certain The Boeing Company Model 757-200 and -200PF series airplanes. This proposed AD was prompted by reports indicating that a standard access door was located where an impact-resistant access door was required, and stencils were missing from some impact-resistant access doors. This proposed AD would require an inspection of the left- and right-hand wing fuel tank access doors to determine that impact- resistant access doors are installed in the correct locations, and to replace any door with an impact-resistant access door if necessary. This proposed AD also would require an inspection for stencils and index markers on impact-resistant access doors, and application of new stencils or index markers if necessary. This proposed AD would also require revising the maintenance program to incorporate changes to the airworthiness limitations section. We are proposing this AD to prevent foreign object penetration of the fuel tank, which could cause a fuel leak near an ignition source (e.g., hot brakes or engine exhaust nozzle), consequently leading to a fuel-fed fire.
Aviation Rulemaking Advisory Committee-New Task
Document Number: 2013-19739
Type: Notice
Date: 2013-08-14
Agency: Federal Aviation Administration, Department of Transportation
The FAA assigned the Aviation Rulemaking Advisory Committee (ARAC) a new task to provide recommendations regarding the outdated Advisory Circular (AC) 120-17A, Maintenance Control by Reliability Methods guidance material. The FAA needs to provide its employees and the aviation industry with current information for developing, implementing, maintaining and overseeing air carrier's maintenance reliability programs. This notice informs the public of the new ARAC activity and solicits membership for the Maintenance Reliability Program Working Group.
Order 1050.1F Environmental Impact: Policies and Procedures
Document Number: 2013-19734
Type: Notice
Date: 2013-08-14
Agency: Federal Aviation Administration, Department of Transportation
The Federal Aviation Administration (FAA) proposes to update, reorganize, and revise its order that contains policies and procedures for implementing the National Environmental Policy Act (NEPA), in accordance with regulations issued by the Council on Environmental Quality (40 CFR parts 1500-1508). The order additionally provides direction on using the NEPA review process to ensure compliance with other environmental laws, regulations, and executive orders that may be applicable to proposed FAA actions. Order 1050.1E Environmental Impact: Policies and Procedures will be replaced with Order 1050.1F Environmental Impact: Policies and Procedures. FAA Order 1050.1F, Environmental Impact: Policies and Procedures is available at https:// www.faa.gov/about/officeorg/headquarters offices/apl/environ policyguidance/policy/. This notice provides the public opportunity to comment on the revised Order. All comments on the proposed changes will be considered in preparing the final version of Order 1050.1F.
Norfolk Southern Railway Company-Discontinuance of Service Exemption-in Clinton and Howard Counties, IN
Document Number: 2013-19716
Type: Notice
Date: 2013-08-14
Agency: Surface Transportation Board, Department of Transportation
Norfolk Southern Railway Company-Discontinuance of Service Exemption-in Ontario, Seneca, and Wayne Counties, NY
Document Number: 2013-19708
Type: Notice
Date: 2013-08-14
Agency: Surface Transportation Board, Department of Transportation
Norfolk Southern Railway Company-Abandonment Exemption-in Marengo County, Ala
Document Number: 2013-19688
Type: Notice
Date: 2013-08-14
Agency: Surface Transportation Board, Department of Transportation
Gulf Gateway Deepwater Port Decommissioning and License Termination
Document Number: 2013-19687
Type: Notice
Date: 2013-08-14
Agency: Maritime Administration, Department of Transportation
The Maritime Administration (MARAD) announces its final clearance and authorization of the decommissioning of the Gulf Gateway Deepwater Port and termination of the Gulf Gateway Deepwater Port License (License), effective as of June 28, 2013. Pursuant to Section 1503(h) of the Deepwater Port Act of 1974, as amended, a License may remain in effect until such time as it is either suspended or revoked by the Secretary of Transportation or surrendered by the licensee. For purposes of this agency action, MARAD has granted as of June 28, 2013, final clearance of the completed decommissioning of the Gulf Gateway Deepwater Port facility, and approved termination of the official License and all other conditions and obligations set forth by the License.
Notice of Availability of New Starts and Small Starts Policy Guidance
Document Number: 2013-19681
Type: Rule
Date: 2013-08-14
Agency: Federal Transit Administration, Department of Transportation
The Federal Transit Administration (FTA) is issuing final policy guidance to sponsors of New Starts and Small Starts projects. This guidance is available both on the docket and the agency's public Web site. This final guidance includes changes made in response to comments received on the guidance proposed in January 2013, and accompanies the final rule for Major Capital Investment Projects promulgated in January 2013. The rule sets the framework for the New Starts and Small Starts evaluation and rating process; the policy guidance complements the rule by providing technical details about the methods for calculating the project justification and local financial commitment criteria used to evaluate and rate New Starts and Small Starts projects.
Notice of Intent To Prepare an Environmental Impact Statement for the Virginia Beach Transit Extension Study, Virginia
Document Number: 2013-19623
Type: Notice
Date: 2013-08-14
Agency: Federal Transit Administration, Department of Transportation
The Federal Transit Administration (FTA) and Hampton Roads Transit (HRT) are planning to prepare an Environmental Impact Statement (EIS) for the Virginia Beach Transit Extension Study (VBTES). The VBTES will examine extending transit service from the eastern terminus of Norfolk's existing Light Rail Transit (LRT) system, ``The Tide,'' at Newtown Road to the Virginia Beach Oceanfront either along the former Norfolk Southern Railroad right-of-way (NSRR ROW) that runs from Newtown Road to Birdneck Road or along the NSRR ROW to Laskin Road then onto Birdneck Road. From Birdneck Road, both alignments would extend onto 19th Street terminating at the Virginia Beach Oceanfront. In 2000, FTA and HRT prepared the Norfolk-Virginia Beach East/West Light Rail Transit System Final EIS. This document looked at an 18-mile transit system connecting downtown Norfolk to the Pavilion area of Virginia Beach. In 2009, FTA and HRT began a Supplemental EIS for the VBTES that intended to evaluate changes in the project corridor since the 2000 EIS. As the Supplemental EIS progressed, FTA and HRT began studying an additional alternative alignment along Laskin Road. This alternative alignment and the additional amount of time that elapsed since work began on the Supplemental EIS led FTA to determine that a Supplemental EIS was no longer appropriate for the VBTES and instead a new EIS should be prepared. Pursuant to 23 CFR 771.123(a), FTA and HRT now issue this Notice of Intent (NOI) for an EIS for the VBTES. Although the VBTES has been under consideration in some form since the 1980's, and was included in the 2000 Final EIS, this EIS will specifically rely on relevant information that has been developed over the last several years since the 2009 Supplemental EIS was proposed. The EIS for the VBTES will be prepared in accordance with the National Environmental Policy Act (NEPA). This NOI initiates formal scoping for the EIS, invites interested parties to participate in the process, provides information about the purpose and need for the study, includes the alternatives being considered for evaluation in the EIS, and identifies potential environmental effects to be considered. HRT began its VBTES public involvement process in 2009. It held frequent public meetings in 2010, 2012, and 2013, and continues to receive public comments on the study today. HRT plans additional public meetings for September 2013 and November 2013. These continued opportunities for public involvement in the VBTES means no formal public scoping meetings are planned to be held for this EIS. In 2009 and 2013, HRT, in coordination with FTA, contacted interested party agencies for the VBTES. As such, agencies that have previously responded to invitations to engage in the VBTES process will remain as interested parties on the study and are not required to formally respond to this notice.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.