Department of the Navy December 2011 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Revised Notice of Intent To Prepare an Environmental Impact Statement for Military Training Activities at the Naval Weapons Systems Training Facility Boardman, OR, and Notice of Request for Public Scoping Comments
This notice is to advise the public that the Department of the Navy (DoN) is revising the scope for the Environmental Impact Statement (EIS) for continued and increased training activities on Naval Weapons Systems Training Facility (NWSTF) Boardman, Oregon, and to invite the public to provide comments for consideration during preparation of the revised EIS. This revised Notice of Intent has been published because since the October 5, 2010 publication of the original Notice of Intent in the Federal Register (75 FR 61452), the DoN is modifying its proposed action to include the addition of new Special Use Airspace in the form of a Military Operations Area (MOA). This new MOA would preserve required training capabilities at NWSTF Boardman that are necessary to maintain military readiness. Additional information concerning the proposed new MOA, including a map, is available on the NWSTF Boardman EIS Web page located at: https://www.NWSTFBoardmanEIS.com.
Notice of Public Meeting on the Draft Environmental Impact Statement for Basewide Water Infrastructure and Stuart Mesa Bridge Replacement at Marine Corps Base Camp Pendleton, CA
Pursuant to Section (102)(2)(c) of the National Environmental Policy Act of 1969 (NEPA) (42 United States Code [U.S.C.] Sections 4321-4370h); the Council on Environmental Quality (CEQ) regulations for implementing the procedural provisions of NEPA (Title 40 Code of Federal Regulations (CFR) parts 1500-1508); Department of the Navy Procedures for Implementing NEPA (32 CFR part 775); and Marine Corps NEPA directives (Marine Corps Order P5090.2A), the Marine Corps (USMC) has prepared and filed with the U.S. Environmental Protection Agency (EPA) a Draft Environmental Impact Statement (EIS) that evaluates the potential environmental consequences that may result from implementing the Basewide Water Infrastructure and Stuart Mesa Bridge Replacement projects at Marine Corps Base Camp Pendleton (MCBCP). The proposed action would involve the construction, operation, and maintenance of infrastructure upgrades, expansions, and improvements to the Basewide water system and replacement of a critical link in the Base roadway system. The projects would include a northern Advanced Water Treatment (AWT) plant and associated facilities, connection of the Base's northern and southern water systems, and replacement of the bridge on Stuart Mesa Road over the Santa Margarita River (Stuart Mesa Bridge). A Notice of Intent to prepare this EIS was published in the Federal Register on March 31, 2010 (Vol. 75, No. 61, p. 16080). With the filing of the Draft EIS, the Department of the Navy (DoN) is initiating a 45-day public comment period and has scheduled a public open house meeting to receive oral and written comments on the Draft EIS. Federal, State, and local agencies and interested individuals are invited to be present or represented at the public meeting. This notice announces the date and location of the public meeting, and supplementary information about the environmental planning effort.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.