Reclamation Bureau April 10, 2007 – Federal Register Recent Federal Regulation Documents
Results 1 - 1 of 1
South Coast Conduit Secondary Pipeline, Santa Barbara County, California
The Bureau of Reclamation (Reclamation) and the Cachuma Operation and Maintenance Board (COMB) are planning to prepare a combined EIS/EIR for the proposed construction of a second pipeline adjacent to the South Coast Conduit (SCC) between the South Portal of the Tecolote Tunnel (SPTT) and the Corona Del Mar Water Treatment Plant (CDMWTP) for the purposes of increasing the operational flexibility, reliability, and the conveyance capacity of the SCC, accommodating peak demand levels, and allowing maintenance of the pipeline. The project site is located in Glen Annie Canyon, north of the City of Goleta, in Santa Barbara County, California. The project site encompasses the area surrounding the existing SCC between the SPTT and the CDMWTP.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.