Reclamation Bureau March 28, 2007 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
North Sonoma County Agricultural Reuse Project (NSCARP)-Sonoma County, CA
Pursuant to section 102(2)(c) of the National Environmental Policy Act of 1969 (NEPA), and Public Resources Code, sections 21000- 21177 of the California Environmental Quality Act (CEQA), the Bureau of Reclamation (Reclamation), the lead Federal agency, and the Sonoma County Water Agency (SCWA), the local sponsor and CEQA lead agency, have made available for public review and comment a Draft EIS/EIR for the NSCARP. The NSCARP Draft EIS/EIR describes a no action alternative (Alternative 1) and three action alternatives (Alternative 2, Alternative 3, and Alternative 4) that include numerous features that would create an agricultural irrigation system comprised of 19 recycled water storage reservoirs totaling about 11,200 acre-feet in storage capacity. In addition, NSCARP would involve the design and construction of approximately 112 miles of transmission pipeline and numerous pumping stations for conveying water from the Geysers Pipeline to the storage reservoirs, and for distribution of the storage recycled water from the reservoirs to approximately 21,500 acres of agricultural lands. As part of the NEPA/CEQA process, one public hearing will be held to provide interested individuals and organizations with an opportunity to comment verbally and in writing on the NSCARP Draft EIS/EIR.
Folsom Dam Safety and Flood Damage Reduction (DS/FDR) Action-Sacramento, El Dorado, and Placer Counties, CA
The Bureau of Reclamation (Reclamation), the lead Federal agency; the U.S. Army Corps of Engineers (Corps), a cooperating Federal agency; the Reclamation Board, the lead State agency; and the Sacramento Area Flood Control Agency (SAFCA), the local sponsor, have prepared a Final EIS/EIR for the Folsom DS/FDR Action. The Folsom DS/ FDR proposed action includes features that address Reclamation's DS objectives and the Corps' FDR objectives jointly as well as features or increments that exclusively address DS, security, or FDR objectives and would be constructed by the respective agencies. The Final EIS/EIR contains responses to comments received on the Draft EIS/EIR. The Corps intends to adopt the Final EIS/EIR to satisfy the requirements of National Environmental Policy Act for the Joint Federal Project (JFP) component and other FDR features as appropriate. The Corps has prepared a Post Authorization Change (PAC) Report which documents recommended changes to the authorized Folsom Modifications and Folsom Dam Raise projects. A Notice of Availability of the Draft EIS/EIR was published in the Federal Register on Tuesday, November 28, 2006 (71 FR 68837). The public review period on the Draft EIS/EIR ended on January 22, 2006. The public review period was extended via a press release to January 26, 2007.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.