Department of the Interior April 22, 2011 – Federal Register Recent Federal Regulation Documents

Endangered and Threatened Wildlife and Plants; Draft Revised Recovery Plan for the Northern Spotted Owl-Appendix C
Document Number: 2011-9864
Type: Notice
Date: 2011-04-22
Agency: Fish and Wildlife Service, Department of the Interior
On September 15, 2010, we, the U.S. Fish and Wildlife Service, announced the availability of the Draft Revised Recovery Plan for the Northern Spotted Owl (Strix occidentalis caurina) for public review and comment. We are reopening the comment period on an updated version of Appendix C of that document, which describes the development of a spotted owl habitat modeling tool.
Notice of Public Meeting of the Carrizo Plain National Monument Advisory Council
Document Number: 2011-9863
Type: Notice
Date: 2011-04-22
Agency: Department of the Interior, Bureau of Land Management
In accordance with the Federal Land Policy and Management Act and the Federal Advisory Committee Act of 1972, the U.S. Department of the Interior, Bureau of Land Management (BLM) Carrizo Plain National Monument Advisory Council (MAC) will meet as indicated below.
Cape Wind Energy Project
Document Number: 2011-9779
Type: Notice
Date: 2011-04-22
Agency: Department of the Interior, Bureau of Ocean Energy Management, Regulation and Enforcement
Pursuant to the Council on Environmental Quality (CEQ) regulation implementing the National Environmental Policy Act (NEPA) at 40 CFR 1506.6, BOEMRE announces the availability of an EA, a Finding of No New Significant Impact (FONNSI), and a ROD on whether to approve, approve with modifications, or disapprove a Construction and Operations Plan (COP) for the Cape Wind Energy Project located on the Outer Continental Shelf (OCS) in Nantucket Sound, off the coast of Massachusetts. BOEMRE prepared the EA to determine whether there are any substantial changes in the proposed action or whether there is new information since the first ROD (2010 ROD) approving the issuance of a lease to Cape Wind Associates (CWA) that would require preparation of a Supplemental Environmental Impact Statement (SEIS). This EA was also prepared to assist BOEMRE in deciding whether to approve, approve with modifications, or disapprove CWA's COP for a commercial wind facility. On the basis of the analysis contained in the EA, BOEMRE has determined that a SEIS is not required and has prepared a FONNSI supporting that determination (See Section 2 of this notice). After careful consideration, BOEMRE has decided to issue this second ROD (2011 ROD) approving CWA's COP with modifications (See Section 3 of this notice). Availability: The EA, FONNSI, and ROD are available at https:// www.boemre.gov/offshore/RenewableEnergy/CapeWind.htm.
Draft Program Environmental Impact Statement/Environmental Impact Report (PEIS/R) and Public Hearings for San Joaquin River Restoration Program, California
Document Number: 2011-9744
Type: Notice
Date: 2011-04-22
Agency: Department of the Interior, Bureau of Reclamation
The Bureau of Reclamation and the California Department of Water Resources (DWR) have prepared a joint Draft PEIS/R, for the implementation of the Stipulation of Settlement (Settlement) in NRDC et al. v. Kirk Rodgers et al. The Settlement is based on two goals: (1) To restore and maintain fish populations in ``good condition'' in the mainstem of the San Joaquin River below Friant Dam to the confluence of the Merced River, including naturally reproducing and self-sustaining populations of salmon and other fish (Restoration Goal); and (2) to reduce or avoid adverse water supply impacts to all of the Friant Division long-term contractors that may result from the flows provided for in the Settlement (Water Management Goal). The Draft PEIS/R document evaluates the direct, indirect, and cumulative effects of implementing the Settlement. The alternatives considered in the Draft PEIS/R include actions that will be implemented to work towards achieving the Settlement's Restoration and Water Management goals.
Notice of Meetings of the Pinedale Anticline Working Group, Wyoming
Document Number: 2011-9704
Type: Notice
Date: 2011-04-22
Agency: Department of the Interior, Bureau of Land Management
In accordance with the Federal Land Policy and Management Act of 1976 and the Federal Advisory Committee Act of 1972 (FACA), the U.S. Department of the Interior, Bureau of Land Management (BLM) announces that the Pinedale Anticline Working Group (PAWG) will conduct meetings and a field tour in Pinedale, Wyoming. All meetings and tours are open to the public.
Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact Statement for the Bighorn Basin Resource Management Plan Revision Project, Cody and Worland Field Offices, Wyoming
Document Number: 2011-9703
Type: Notice
Date: 2011-04-22
Agency: Department of the Interior, Bureau of Land Management
In accordance with the National Environmental Policy Act (NEPA) of 1969, as amended, and the Federal Land Policy and Management Act (FLPMA) of 1976, as amended, the Bureau of Land Management (BLM) has prepared a Draft Resource Management Plan (RMP) for the Cody Field Office, a Draft RMP for the Worland Field Office, and an associated Draft Environmental Impact Statement (EIS). The two Draft RMPs and the associated Draft EIS comprise the Bighorn Basin RMP Revision Project (Project). By this notice, the BLM is announcing the opening of a 90- day comment period.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.