Department of the Interior February 1, 2008 – Federal Register Recent Federal Regulation Documents
Results 1 - 7 of 7
Yakima River Basin Water Storage Feasibility Study; Benton, Yakima, and Kittitas Counties, WashingtonINT-DES 08-03
Pursuant to section 102(2)(C) of the National Environmental Policy Act (NEPA) of 1969, as amended, the Bureau of Reclamation (Reclamation) has prepared a combined Draft Planning Report and Environmental Impact Statement (Draft PR/EIS) on the Yakima River Basin Water Storage Feasibility Study (Storage Study). The Washington Department of Ecology (Ecology) is a joint lead with Reclamation in the preparation of the Draft PR/EIS which will also be used to comply with requirements of the Washington State Environmental Policy Act (SEPA). The cooperating agencies on this study are Yakima County; the U.S. Department of the Army: Yakima Training Center and the Seattle District of the U.S. Corps of Engineers; and the U.S. Department of Energy: Office of River Protection. The purpose of the Yakima River Basin Water Storage Feasibility Study is to evaluate alternatives that would create additional water storage for the Yakima River basin and assess their potential to supply the water needed for ecosystem aquatic habitat, basin-wide agriculture, and municipal demands. The need for the study is based on the existing finite water supply and limited storage capability of the Yakima River basin in low water years. This finite supply and limited storage capacity do not meet the water supply demands in all years and result in significant adverse impact to the Yakima River basin's economy, which is agriculture-based, and to the basin's aquatic habitat, specifically, anadromous fisheries. The study seeks to identify means of increasing water storage available, including storage of Columbia River water, for purposes of improving anadromous fish habitat and meeting irrigation and municipal water supply needs.
Facility License Standards
The rule adds new sections and a new part to the Commission's regulations that require tribes to adopt and enforce standards for facility licenses. These standards will help the Commission ensure that each place, facility or location where class II or class III gaming will occur is located on Indian lands eligible for gaming as required by the Indian Gaming Regulatory Act. The rules will ensure that gaming facilities are constructed, maintained and operated in a manner that adequately protects the environment and the public health and safety.
Bonus or Royalty Credits for Relinquishing Certain Leases Offshore Florida
The MMS proposes to amend its regulations for oil and gas leases on the Outer Continental Shelf to implement a mandate in the Gulf of Mexico Energy Security Act of 2006. This proposed rule would (1) provide a credit to lessees who relinquish certain eligible leases in the Gulf of Mexico; (2) define eligible leases as those within 125 miles of the Florida coast in the Eastern Planning Area and certain leases within 100 miles of the Florida coast in the Central Planning Area; and (3) allow lessees to use the credits in lieu of monetary payment for either a lease bonus bid or royalty due on oil and gas production from most other leases in the Gulf of Mexico or to transfer the credits to other Gulf of Mexico lessees for their use.
Notice of Availability of Proposed Resource Management Plan and Final Environmental Impact Statement for the Upper Missouri River Breaks National Monument, Montana
In accordance with the National Environmental Policy Act of 1969 (NEPA, 42 U.S.C. 4321 et seq.) and the Federal Land Policy and Management Act of 1976 (FLPMA, 43 U.S.C. 1701 et seq.), the Bureau of Land Management (BLM) has prepared a Proposed Resource Management Plan (PRMP) and Final Environmental Impact Statement (EIS) for the Upper Missouri River Breaks National Monument.
Notice of Availability of Truckhaven Geothermal Leasing Area Final Environmental Impact Statement, California
In accordance with the National Environmental Policy Act of 1969 (NEPA, 42 U.S.C. 4321 et seq.) and the Federal Land Policy and Management Act of 1976 (FLPMA, 43 U.S.C. 1701 et seq.),the Bureau of Land Management (BLM) has prepared a Final Environmental Impact Statement (EIS) for the Truckhaven Geothermal Leasing Area, Imperial County, managed by the El Centro Field Office.
Notice of Availability of the Draft Environmental Impact Statement for the West Tavaputs Plateau Natural Gas Full Field Development Plan, Carbon and Duchesne Counties, Utah
This notice announces the availability of the Draft Environmental Impact Statement (DEIS) for the West Tavaputs Plateau Natural Gas Full Field Development Plan prepared pursuant to the National Environmental Policy Act of 1969 (NEPA). The DEIS evaluates the impacts of development of natural gas resources on approximately 137,700 acres of public, state, and private lands on the West Tavaputs Plateau in Carbon and Duchesne Counties, Utah. This NEPA analysis will provide a basis for the Bureau of Land Management (BLM) to amend the applicable land use plan per 43 CFR 1610 if necessary.
Notice of Proposed Information Collection
In compliance with the Paperwork Reduction Act of 1995, the Office of Surface Mining Reclamation and Enforcement (OSM) is announcing its intention to request continued approval for the collections of information under 30 CFR Parts 750 and 842 which relate to surface coal mining and reclamation operations on Indian Lands; and which allows the collection and processing of citizen complaints and requests for inspection, respectively.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.