Department of the Interior March 9, 2007 – Federal Register Recent Federal Regulation Documents
Results 1 - 8 of 8
Environmental Documents Prepared for Proposed Oil and Gas Operations on the Gulf of Mexico Outer Continental Shelf (OCS)
Minerals Management Service (MMS), in accordance with Federal Regulations that implement the National Environmental Policy Act (NEPA), announces the availability of NEPA-related Site-Specific Environmental Assessments (SEA) and Findings of No Significant Impact (FONSI), prepared by MMS for the following oil and gas activities proposed on the Gulf of Mexico OCS.
Public Land Order No. 7616; Partial Revocation of 7 Secretarial Orders; Oregon; Correction
In the Public Land Order No. 7616, 69 FR 59951-59953, published October 6, 2004, as FR Doc. 04 22391, make the following corrections: On page 59951, in the Title, and in the Summary, ``7 Secretarial Orders'', should read ``5 Secretarial Orders''. In the Summary, ``17,789.94 acres'', and ``7,975.30 acres'', should read ``17,769.94 acres'', and ``7,955.30 acres'', respectively. In paragraph 2 of the Order, delete ``September 2, 1914, November 4, 1914,''. On page 59952, column 1, in T. 20 S., R. 46 E., delete ``Sec. 20, S\1/2\SW\1/4\NE\1/ 4\''. In column 3, ``7,975.30 acres'', should read ``7,955.30 acres''.
Notice of Availability of a Final Environmental Impact Statement/Environmental Impact Report for the East Contra Costa County Habitat Conservation Plan and Natural Community Conservation Plan and Receipt of Application for an Incidental Take Permit From the Contra Costa County Flood Control and Water District, Contra Costa County, CA
This notice announces the receipt of an application from the Contra Costa County Flood Control and Water District (Flood Control District) and the availability of the final Environmental Impact Statement/Environmental Impact Report (EIS/EIR), East Contra Costa County Habitat Conservation Plan and Natural Community Conservation Plan (Plan), and Implementing Agreement (IA) for public review and comment. A notice of availability of the draft EIS/EIR was published in the Federal Register on September 2, 2005. The application described in that notice did not include the Flood Control District, which has since been added to the list of proposed permittees. The Fish and Wildlife Service (Service) is considering the proposed action of issuing a 30- year incidental take permit for 28 species in response to the application. The proposed permittees are: Contra Costa County (County); the cities of Brentwood, Clayton, Oakley, and Pittsburg (cities); the Flood Control District; East Bay Regional Park District; and an Implementing Entity to be formed by the County and the cities to implement certain aspects of the Plan. The proposed permit would authorize the incidental take of individual members of species listed under the ESA. The permit is needed because take of species could occur during proposed urban development activities, rural infrastructure projects, and preserve management activities within a 174,018-acre planning area located in eastern Contra Costa County, California.
New Melones Lake Project Resource Management Plan/Environmental Impact Statement (RMP/EIS), Calaveras and Tuolumne Counties, CA
The Bureau of Reclamation is extending the scoping period for the RMP/EIS to March 19, 2007. The notice of intent for the RMP/EIS was published in the Federal Register on December 18, 2006 (71 FR 75769). The scoping period was originally to end on February 16, 2007. During the scoping process, several individuals and organizations have indicated that submission of scoping comments by the February 16, 2007 would be a difficult deadline to meet. To encourage additional public input, the public comment period has been extended.
Notice of Public Meetings for Route Designation
To comply with CFR 8340, Off-Road Vehicles, and land use planning for the Bureau of Land Management, Phoenix District, Hassayampa Field Office, Arizona, three route designation public meetings will be held. The purpose of these meetings is to inform the public of the process that will be used, the type of input from the public that would be helpful, and the general schedule leading to final route designations. Maps will be available. Input from the public regarding route connectivity, existing conflicts, and current or desired access will be taken.
Notice of Availability of a Draft Environmental Impact Statement and a Draft Conformity Determination for the proposed Federated Indians of the Graton Rancheria Casino and Hotel Project, Sonoma, CA
In accordance with Section 102(2)(C) of the National Environmental Policy Act (NEPA) 42 U.S.C. 4321 et seq., the NIGC, in cooperation with the Federated Indians of the Graton Rancheria (the ``Graton Rancheria''), has prepared a Draft Environmental Impact Statement (DEIS) for a proposed casino and hotel project/action to be located in Sonoma, California. The purpose of the proposed project/action is to help address the socio-economic needs of the Graton Rancheria. The DEIS documents the existing condition of environmental resources in and around the areas considered for development and the potential impacts on those resources as a result of implementing each of the alternatives. The alternatives considered in detail are: a casino/hotel project on the ``Wilfred Site'' (the proposed project/action), a casino/hotel project on the ``Stony Point Site,'' a casino/hotel project on the ``Lakeville Site,'' a reduced intensity casino/hotel project on the ``Stony Point'' site, an alternate use project on the ``Stony Point'' site, and a no proposed project/action alternative. In accordance with Section 176 of the Clean Air Act 42 U.S.C. 7506, and the U.S. Environmental Protection Agency's (EPA) general conformity regulations 40 CFR Part 93, Subpart B, a Draft Conformity Determination (DCD) has been prepared for the proposed project. The DCD is contained within Appendix W of the DEIS.
Onshore Oil and Gas Operations; Federal and Indian Oil and Gas Leases; Onshore Oil and Gas Order Number 1, Approval of Operations; Correction
On March 7, 2007, the Forest Service and the Bureau of Land Management jointly published a final rule (72 FR 10308). The dates heading on page 10308 incorrectly set out the effective date as April 6, 2007. The correct effective date of the final rule is May 7, 2007, consistent with the chart on page 10328.
South Bay Salt Pond Restoration Project, San Francisco Bay, CA
The U.S. Fish and Wildlife Service (Service) and the California Department of Fish and Game (CDFG) are proposing a restoration plan for 15,100 acres (6,111 hectares) of former commercial salt ponds in south San Francisco Bay. This South Bay Salt Pond (SBSP) Restoration Project would use a combination of restored tidal marsh, managed ponds, flood control measures and public access features to meet the three goals of the plan: to restore wildlife habitat, to provide flood protection and to provide wildlife-oriented public access. The ponds are located at the Don Edwards San Francisco Bay National Wildlife Refuge and at the Eden Landing State Ecological Reserve. The Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) includes program-level evaluation of the SBSP long- term alternatives as well as project-level analysis of the first phase of restoration (the Phase 1 actions). The Draft EIS/EIR has been prepared jointly by the Service, the U.S. Army Corps of Engineers (Corps) and the CDFG to analyze the impacts of the SBSP. The EIS/EIR presents a limited evaluation of the potential impacts associated with the list of possible South San Francisco Bay Shoreline Study (Shoreline Study) actions. The Shoreline Study area includes the SBSP Restoration Project area as well as shoreline and floodplain areas in the counties of Alameda, San Mateo, and Santa Clara. The Corps and non-Federal sponsors will prepare an EIS/EIR for the Shoreline Study, which will tier off of this EIS/EIR and cover specific project-level actions. Note that the Draft SBSP EIS/EIR is being submitted for public review under separate Federal and State processes. The following addresses and due dates are applicable to the Federal NEPA review process:
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.