Department of the Army August 3, 2005 – Federal Register Recent Federal Regulation Documents
Results 1 - 6 of 6
Privacy Act of 1974; System of Records
The Department of the Army proposes to alter a system of records notice in its inventory of records systems subject to the Privacy Act of 1974,(5 U.S.C. 552a), as amended.
Privacy Act of 1974; System of Records
The Defense Threat Reduction Agency is deleting a system of records notice from its existing inventory of records systems subject to the Privacy Act of 1974 (5 U.S.C. 552a), as amended.
Personnel Review Board
The Department of the Army proposes to amend its regulation on Army Board for Correction of Military Records to be in compliance with the United States District Court for the District of Columbia decision (Daniel J. Lipsman v. Secretary of the ArmyCivil Action No. 02-0151 (RMU), Document Nos. 18, 20, decided September 7, 2004, 2004 U.S. Dist. LEXIS 17866).
Intent To Grant an Exclusive License of a U.S. Government-Owned Patent
In accordance with 35 U.S.C. 209 and 37 CFR 404.7(a)(1)(i), announcement is made of the intent to grant an exclusive (except for use as a portable lavatory enclosure), royalty-bearing, revocable license within the geographic area of the United States of America and its territories and possessions to U.S. Patent 6,672,323, issued January 6, 2004 entitled ``Multipurpose Self-Erecting Structure having Advanced Insect Protection and Storage Characteristics,'' to Kamp-Rite Tent Cot, Inc. with its principal place of business at 1050 Connecticut Ave., Suite 1000, Washington, DC 20036.
Draft Environmental Impact Statement (DEIS) for the Transformation of the Pennsylvania Army National Guard's (PAARNG) 56th Brigade Into a Stryker Brigade Combat Team (SBCT) at the National Guard Training Center (NGTC)-Fort Indiantown Gap (FITG), PA
The Department of the Army and NGB have proposed to transform the PAARNG's 56th Brigade into an SBCT. This DEIS discusses in-depth three alternatives: (1) the Preferred Alternative, (2) Train Using Existing Army Facilities Alternative, and (3) the No Action Alternative. Under the Preferred Alternative, the PAARNG proposed construction of new training and support facilities at NGTC-FTIG; at Fort Pickett, Virginia; and at local PAARNG facilities across the State of Pennsylvania, as well as conducting Annual Training (AT) at Fort A.P. Hill, Virginia, in order to accomplish requisite training. Under the Train Using Existing Army Facilities Alternative, no construction at NGTC-FTIG or Fort Pickett would occur; the statewide facilities improvements would occur. Required SBCT Inactive Duty Training (IDT) and AT would be conducted at select regional Army training installations using existing facilities. Other alternatives considered but eliminated from detail study are also addressed in the DEIS.
Notice of Availability (NOA) of the Draft Environmental Impact Statement (DEIS) for Military Training Activities at Makua Military Reservation (MMR), HI
The Army proposes to conduct military training exercises at MMR, Oahu, Hawaii, for units assigned to the 25th Infantry Division (Light) (25th ID(L)) and for other military components. Other military components that have used MMR in the past include the Marine Corps, Army Reserves, and the Hawaii Army National Guard. Conducting live-fire exercises at the company level and below is critical to maintaining the readiness of all military units assigned or stationed in Hawaii in particular because training at the company level is one of the key building blocks in the Army's progressive training doctrine. Under this doctrine, Soldiers first train as smaller units and then train collectively as part of a large unit. In addition, the training received by a company commander during a company-level combined-arms live-fire exercise (CALFEX) is invaluable in teaching Soldiers the skills required to coordinate and integrate the combined arms support provided by aviation, artillery, mortar, and combat engineer support teams. These communication and coordination skills are essential when several companies combine as a battalion under the control of a battalion commander. The DEIS addresses, among other things, the potential direct, indirect, and cumulative environmental impacts associated with the proposal to conduct military training activities at MMR. The DEIS development process was conducted in accordance with the Settlement Agreement and Stipulated Order between Malama Makua and the Department of Defense (filed October 4, 2001).
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.