Department of the Army, Corps of Engineers October 10, 2006 – Federal Register Recent Federal Regulation Documents

Notice of Intent To Prepare a Draft Environmental Impact Statement (DEIS) for the Nourishment of 7.25 Miles of Beach, the Repositioning of the New River Inlet Channel, and the Implementation of an Inlet Management Plan, in North Topsail Beach, Onslow County, NC
Document Number: 06-8562
Type: Notice
Date: 2006-10-10
Agency: Department of Defense, Department of the Army, Corps of Engineers, Engineers Corps, Army Department
The U.S. Army Corps of Engineers (COE), Wilmington District, Wilmington Regulatory Field Office has received an amendment to the request for Department of the Army authorization, pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act, from the town of North Topsail Beach to nourish approximately 7.25 miles of shoreline. The modification will include an additional 3.85 miles of beachfront to protect residential homes and town infrastructures located along the south section of the Town limits. The proposed sources of material for the addition will be dredged from the same offshore borrow area as described in the original 7.25 mile plan. The placement of beach fill along the Town's southern shoreline would result in the initial widening of the beach 75 to 1590 feet seaward, depending on the final design volume and foreshore slopes that the fill assumes during construction. The 3.85 miles of shoreline are located at the southern end of North Topsail Beach. Unlike the original 7.25 miles of proposed nourishment, the additional section is outside the Coastal Barrier Resource System (CBRS) designation; therefore, it is not subject to the expenditure of Federal funding restrictions associated with the Coastal Barrier Resource Act of 1982 and the coastal Barrier Improvement Act of 1990. This south section, or stretch, of shoreline is currently being considered by the U.S. Army Corps of Engineers for a federal shoreline protection project. Due to delays to complete the federal plan formulation process, the North Topsail Beach Board of Alderman voted to include the 3.85 mile section in the non-federal 7.25 mile section that is currently under review pursuant to the Environmental Impact Statement (EIS) procedures. The decision to include the south section in the present EIS process is intended to act as interim or emergency beach fill by preserving existing development and infrastructure along the 3.85 miles of shoreline while the federal plan formulation continues. The original Notice of Intent was published on May 19, 2005 (70 FR 28924) with a commenting deadline of June 21, 2005.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.