Federal Emergency Management Agency October 2015 – Federal Register Recent Federal Regulation Documents
Results 1 - 50 of 52
South Carolina; Amendment No. 8 to Notice of a Major Disaster Declaration
This notice amends the notice of a major disaster declaration for the State of South Carolina (FEMA-4241-DR), dated October 5, 2015, and related determinations.
Changes in Flood Hazard Determinations
This notice lists communities where the addition or modification of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or the regulatory floodway (hereinafter referred to as flood hazard determinations), as shown on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports, prepared by the Federal Emergency Management Agency (FEMA) for each community, is appropriate because of new scientific or technical data. The FIRM, and where applicable, portions of the FIS report, have been revised to reflect these flood hazard determinations through issuance of a Letter of Map Revision (LOMR), in accordance with Title 44, Part 65 of the Code of Federal Regulations (44 CFR part 65). The LOMR will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes, the currently effective community number is shown in the table below and must be used for all new policies and renewals.
Proposed Flood Hazard Determinations
Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report, once effective, will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings.
Final Flood Hazard Determinations
Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM and FIS report are the basis of the floodplain management measures that a community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report are used by insurance agents and others to calculate appropriate flood insurance premium rates for buildings and the contents of those buildings.
Suspension of Community Eligibility
This rule identifies communities where the sale of flood insurance has been authorized under the National Flood Insurance Program (NFIP) that are scheduled for suspension on the effective dates listed within this rule because of noncompliance with the floodplain management requirements of the program. If the Federal Emergency Management Agency (FEMA) receives documentation that the community has adopted the required floodplain management measures prior to the effective suspension date given in this rule, the suspension will not occur and a notice of this will be provided by publication in the Federal Register on a subsequent date. Also, information identifying the current participation status of a community can be obtained from FEMA's Community Status Book (CSB). The CSB is available at https://www.fema.gov/fema/csb.shtm.
Final Flood Hazard Determinations
Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM and FIS report are the basis of the floodplain management measures that a community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report are used by insurance agents and others to calculate appropriate flood insurance premium rates for buildings and the contents of those buildings.
Washington; Major Disaster and Related Determinations
This is a notice of the Presidential declaration of a major disaster for the State of Washington (FEMA-4243-DR), dated October 20, 2015, and related determinations.
South Carolina; Amendment No. 7 to Notice of a Major Disaster Declaration
This notice amends the notice of a major disaster declaration for the State of South Carolina (FEMA-4241-DR), dated October 5, 2015, and related determinations.
Washington; Major Disaster and Related Determinations
This is a notice of the Presidential declaration of a major disaster for the State of Washington (FEMA-4242-DR), dated October 15, 2015, and related determinations.
Agency Information Collection Activities: Proposed Collection; Comment Request; Individual & Community Preparedness Division (ICPD) Annual Youth Preparedness Council (YPC) Application Form
The Federal Emergency Management Agency, as part of its continuing effort to reduce paperwork and respondent burden, invites the general public and other Federal agencies to take this opportunity to comment on a new information collection. In accordance with the Paperwork Reduction Act of 1995, this notice seeks comments concerning the Individual & Community Preparedness Division (ICPD) Annual Youth Preparedness Council (YPC) Application Form.
Proposed Flood Hazard Determinations
On August 19, 2015, FEMA published in the Federal Register a proposed flood hazard determination notice that contained an erroneous table. This notice provides corrections to that table, to be used in lieu of the information published at 80 FR 50307-50308. The table provided here represents the proposed flood hazard determinations and communities affected for Lower Suwannee Watershed.
Changes in Flood Hazard Determinations
New or modified Base (1-percent annual chance) Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, and/or regulatory floodways (hereinafter referred to as flood hazard determinations) as shown on the indicated Letter of Map Revision (LOMR) for each of the communities listed in the table below are finalized. Each LOMR revises the Flood Insurance Rate Maps (FIRMs), and in some cases the Flood Insurance Study (FIS) reports, currently in effect for the listed communities. The flood hazard determinations modified by each LOMR will be used to calculate flood insurance premium rates for new buildings and their contents.
Final Flood Elevation Determinations
Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).
South Carolina; Amendment No. 6 to Notice of a Major Disaster Declaration
This notice amends the notice of a major disaster declaration for the State of South Carolina (FEMA-4241-DR), dated October 5, 2015, and related determinations.
Final Flood Hazard Determinations
Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM and FIS report are the basis of the floodplain management measures that a community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report are used by insurance agents and others to calculate appropriate flood insurance premium rates for buildings and the contents of those buildings.
Proposed Flood Hazard Determinations
Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report, once effective, will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings.
Changes in Flood Hazard Determinations
New or modified Base (1-percent annual chance) Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, and/or regulatory floodways (hereinafter referred to as flood hazard determinations) as shown on the indicated Letter of Map Revision (LOMR) for each of the communities listed in the table below are finalized. Each LOMR revises the Flood Insurance Rate Maps (FIRMs), and in some cases the Flood Insurance Study (FIS) reports, currently in effect for the listed communities. The flood hazard determinations modified by each LOMR will be used to calculate flood insurance premium rates for new buildings and their contents.
Agency Information Collection Activities: Submission for OMB Review; Comment Request; Federal Assistance for Offsite Radiological Emergency Preparedness and Planning
The Federal Emergency Management Agency (FEMA) will submit the information collection abstracted below to the Office of Management and Budget for review and clearance in accordance with the requirements of the Paperwork Reduction Act of 1995. The submission will describe the nature of the information collection, the categories of respondents, the estimated burden (i.e., the time, effort and resources used by respondents to respond) and cost, and the actual data collection instruments FEMA will use.
Changes in Flood Hazard Determinations
New or modified Base (1-percent annual chance) Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, and/or regulatory floodways (hereinafter referred to as flood hazard determinations) as shown on the indicated Letter of Map Revision (LOMR) for each of the communities listed in the table below are finalized. Each LOMR revises the Flood Insurance Rate Maps (FIRMs), and in some cases the Flood Insurance Study (FIS) reports, currently in effect for the listed communities. The flood hazard determinations modified by each LOMR will be used to calculate flood insurance premium rates for new buildings and their contents.
Proposed Flood Hazard Determinations
Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report, once effective, will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings.
Final Flood Hazard Determinations
Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM and FIS report are the basis of the floodplain management measures that a community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report are used by insurance agents and others to calculate appropriate flood insurance premium rates for buildings and the contents of those buildings.
Changes in Flood Hazard Determinations
This notice lists communities where the addition or modification of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or the regulatory floodway (hereinafter referred to as flood hazard determinations), as shown on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports, prepared by the Federal Emergency Management Agency (FEMA) for each community, is appropriate because of new scientific or technical data. The FIRM, and where applicable, portions of the FIS report, have been revised to reflect these flood hazard determinations through issuance of a Letter of Map Revision (LOMR), in accordance with title 44, part 65 of the Code of Federal Regulations (44 CFR part 65). The LOMR will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes, the currently effective community number is shown in the table below and must be used for all new policies and renewals.
South Carolina; Amendment No. 4 to Notice of a Major Disaster Declaration
This notice amends the notice of a major disaster declaration for the State of South Carolina (FEMA-4241-DR), dated October 5, 2015, and related determinations.
South Carolina; Amendment No. 5 to Notice of a Major Disaster Declaration
This notice amends the notice of a major disaster declaration for the State of South Carolina (FEMA-4241-DR), dated October 5, 2015, and related determinations.
Final Flood Elevation Determinations
Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).
Guidelines for Implementing Executive Order 11988, Floodplain Management, and Executive Order 13690, Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input
This notice serves to inform the public that the Department of the Interior held a meeting of the interagency Water Resources Council on Thursday, October 8, 2015, in the John Muir Conference Room, 1849 C St. NW., Washington, DC 20240 at 10 a.m. EDT to consider the recommendations of the Mitigation Framework Leadership Group and vote on the issuance of revised ``Guidelines for Implementing Executive Order 11988, Floodplain Management, and Executive Order 13690, Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input.'' The Water Resources Council voted unanimously to accept the recommendations of the Mitigation Framework Leadership Group and issued Guidelines for Implementing Executive Order 11988, Floodplain Management, and Executive Order 13690, Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input, effective October 8, 2015.
Agency Information Collection Activities: Submission for OMB Review; Comment Request; National Urban Search and Rescue Response System
The Federal Emergency Management Agency (FEMA) will submit the information collection abstracted below to the Office of Management and Budget for review and clearance in accordance with the requirements of the Paperwork Reduction Act of 1995. The submission will describe the nature of the information collection, the categories of respondents, the estimated burden (i.e., the time, effort and resources used by respondents to respond) and cost, and the actual data collection instruments FEMA will use.
South Carolina; Emergency and Related Determinations
This is a notice of the Presidential declaration of an emergency for the State of South Carolina (FEMA-3373-EM), dated October 3, 2015, and related determinations.
South Carolina; Major Disaster and Related Determinations
This is a notice of the Presidential declaration of a major disaster for the State of South Carolina (FEMA-4241-DR), dated October 5, 2015, and related determinations.
South Carolina; Amendment No. 1 to Notice of a Major Disaster Declaration
This notice amends the notice of a major disaster declaration for the State of South Carolina (FEMA-4241-DR), dated October 5, 2015, and related determinations.
South Carolina; Amendment No. 2 to Notice of a Major Disaster Declaration
This notice amends the notice of a major disaster declaration for the State of South Carolina (FEMA-4241-DR), dated October 5, 2015, and related determinations.
California; Amendment No. 5 to Notice of a Major Disaster Declaration
This notice amends the notice of a major disaster declaration for the State of California (FEMA-4240-DR), dated September 22, 2015, and related determinations.
South Carolina; Amendment No. 3 to Notice of a Major Disaster Declaration
This notice amends the notice of a major disaster declaration for the State of South Carolina (FEMA-4241-DR), dated October 5, 2015, and related determinations.
Suspension of Community Eligibility
This rule identifies communities where the sale of flood insurance has been authorized under the National Flood Insurance Program (NFIP) that are scheduled for suspension on the effective dates listed within this rule because of noncompliance with the floodplain management requirements of the program. If the Federal Emergency Management Agency (FEMA) receives documentation that the community has adopted the required floodplain management measures prior to the effective suspension date given in this rule, the suspension will not occur and a notice of this will be provided by publication in the Federal Register on a subsequent date. Also, information identifying the current participation status of a community can be obtained from FEMA's Community Status Book (CSB). The CSB is available at https:// www.fema.gov/fema/csb.shtm.
Changes in Flood Hazard Determinations
This notice lists communities where the addition or modification of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or the regulatory floodway (hereinafter referred to as flood hazard determinations), as shown on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports, prepared by the Federal Emergency Management Agency (FEMA) for each community, is appropriate because of new scientific or technical data. The FIRM, and where applicable, portions of the FIS report, have been revised to reflect these flood hazard determinations through issuance of a Letter of Map Revision (LOMR), in accordance with Title 44, Part 65 of the Code of Federal Regulations (44 CFR part 65). The LOMR will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes, the currently effective community number is shown in the table below and must be used for all new policies and renewals.
Changes in Flood Hazard Determinations
This notice lists communities where the addition or modification of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or the regulatory floodway (hereinafter referred to as flood hazard determinations), as shown on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports, prepared by the Federal Emergency Management Agency (FEMA) for each community, is appropriate because of new scientific or technical data. The FIRM, and where applicable, portions of the FIS report, have been revised to reflect these flood hazard determinations through issuance of a Letter of Map Revision (LOMR), in accordance with Title 44, Part 65 of the Code of Federal Regulations (44 CFR part 65). The LOMR will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes, the currently effective community number is shown in the table below and must be used for all new policies and renewals.
Notice of Maximum Amount of Assistance Under the Individuals and Households Program
FEMA gives notice of the maximum amount for assistance under the Individuals and Households Program for emergencies and major disasters declared on or after October 1, 2015.
Notice of Adjustment of Statewide Per Capita Impact Indicator
FEMA gives notice that the statewide per capita impact indicator under the Public Assistance program for disasters declared on or after October 1, 2015, will remain the same.
Notice of Adjustment of Disaster Grant Amounts
FEMA gives notice of an increase of the maximum amount for Small Project Grants made to state, tribal, and local governments and private nonprofit facilities for disasters declared on or after October 1, 2015.
Notice of Adjustment of Countywide Per Capita Impact Indicator
FEMA gives notice that the countywide per capita impact indicator under the Public Assistance program for disasters declared on or after October 1, 2015, will be increased.
Notice of Adjustment of Minimum Project Worksheet Amount
FEMA gives notice that the minimum Project Worksheet Amount under the Public Assistance program for disasters and emergencies declared on or after October 1, 2015, will be increased.
Agency Information Collection Activities: Proposed Collection; Comment Request; Assistance to Firefighters Grant Program and Fire Prevention and Safety Grants-Grant Application Supplemental Information
The Federal Emergency Management Agency, as part of its continuing effort to reduce paperwork and respondent burden, invites the general public and other Federal agencies to take this opportunity to comment on a revision of a currently approved information collection. In accordance with the Paperwork Reduction Act of 1995, this notice seeks comments concerning grant application information necessary to assess the needs and benefits of applicants for the Assistance to Firefighters Grant Program (AFG) and Fire Prevention and Safety (FP&S) grants.
Agency Information Collection Activities: Proposed Collection; Comment Request; National Emergency Family Registry and Locator System
The Federal Emergency Management Agency, as part of its continuing effort to reduce paperwork and respondent burden, invites the general public and other Federal agencies to take this opportunity to comment on an extension of a currently approved information collection. In accordance with the Paperwork Reduction Act of 1995, this notice seeks comments concerning the FEMA National Emergency Family Registry and Locator System (NEFRLS), which allows adults that have been displaced by a Presidentially declared disaster or emergency to reunify with their families.
California; Amendment No. 3 to Notice of a Major Disaster Declaration
This notice amends the notice of a major disaster declaration for the State of California (FEMA-4240-DR), dated September 22, 2015, and related determinations.
California; Amendment No. 4 to Notice of a Major Disaster Declaration
This notice amends the notice of a major disaster declaration for the State of California (FEMA-4240-DR), datedSeptember 22, 2015, and related determinations.
California; Major Disaster and Related Determinations
This is a notice of the Presidential declaration of a major disaster for the State of California (FEMA-4240-DR), dated September 22, 2015, and related determinations.
California; Amendment No. 1 to Notice of a Major Disaster Declaration
This notice amends the notice of a major disaster for the State of California (FEMA-4240-DR), dated September 22, 2015, and related determinations.
Suspension of Community Eligibility
This rule identifies communities where the sale of flood insurance has been authorized under the National Flood Insurance Program (NFIP) that are scheduled for suspension on the effective dates listed within this rule because of noncompliance with the floodplain management requirements of the program. If the Federal Emergency Management Agency (FEMA) receives documentation that the community has adopted the required floodplain management measures prior to the effective suspension date given in this rule, the suspension will not occur and a notice of this will be provided by publication in the Federal Register on a subsequent date. Also, information identifying the current participation status of a community can be obtained from FEMA's Community Status Book (CSB). The CSB is available at https:// www.fema.gov/fema/csb.shtm.
Technical Mapping Advisory Council
The Federal Emergency Management Agency (FEMA) Technical Mapping Advisory Council (TMAC) will meet in person on October 20-21, 2015, in Reston, VA. The meeting will be open to the public.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.