Federal Emergency Management Agency June 29, 2015 – Federal Register Recent Federal Regulation Documents

Public Assistance Policy on Insurance, FP 206-086-1
Document Number: 2015-15835
Type: Notice
Date: 2015-06-29
Agency: Federal Emergency Management Agency, Department of Homeland Security
This document provides notice of the availability of the final policy Public Assistance Policy on Insurance. The Federal Emergency Management Agency (FEMA) published a notice of availability and request for comment for the proposed policy on October 8, 2014 at 79 FR 60861.
Changes in Flood Hazard Determinations
Document Number: 2015-15823
Type: Notice
Date: 2015-06-29
Agency: Federal Emergency Management Agency, Department of Homeland Security
New or modified Base (1-percent annual chance) Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, and/or regulatory floodways (hereinafter referred to as flood hazard determinations) as shown on the indicated Letter of Map Revision (LOMR) for each of the communities listed in the table below are finalized. Each LOMR revises the Flood Insurance Rate Maps (FIRMs), and in some cases the Flood Insurance Study (FIS) reports, currently in effect for the listed communities. The flood hazard determinations modified by each LOMR will be used to calculate flood insurance premium rates for new buildings and their contents.
Changes in Flood Hazard Determinations
Document Number: 2015-15822
Type: Notice
Date: 2015-06-29
Agency: Federal Emergency Management Agency, Department of Homeland Security
This notice lists communities where the addition or modification of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or the regulatory floodway (hereinafter referred to as flood hazard determinations), as shown on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports, prepared by the Federal Emergency Management Agency (FEMA) for each community, is appropriate because of new scientific or technical data. The FIRM, and where applicable, portions of the FIS report, have been revised to reflect these flood hazard determinations through issuance of a Letter of Map Revision (LOMR), in accordance with Title 44, Part 65 of the Code of Federal Regulations (44 CFR part 65). The LOMR will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes, the currently effective community number is shown in the table below and must be used for all new policies and renewals.
Final Flood Elevation Determinations
Document Number: 2015-15821
Type: Rule
Date: 2015-06-29
Agency: Federal Emergency Management Agency, Department of Homeland Security
Base (1-percent-annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).
Changes in Flood Hazard Determinations
Document Number: 2015-15813
Type: Notice
Date: 2015-06-29
Agency: Federal Emergency Management Agency, Department of Homeland Security
New or modified Base (1-percent annual chance) Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, and/or regulatory floodways (hereinafter referred to as flood hazard determinations) as shown on the indicated Letter of Map Revision (LOMR) for each of the communities listed in the table below are finalized. Each LOMR revises the Flood Insurance Rate Maps (FIRMs), and in some cases the Flood Insurance Study (FIS) reports, currently in effect for the listed communities. The flood hazard determinations modified by each LOMR will be used to calculate flood insurance premium rates for new buildings and their contents.
Changes in Flood Hazard Determinations
Document Number: 2015-15812
Type: Notice
Date: 2015-06-29
Agency: Federal Emergency Management Agency, Department of Homeland Security
New or modified Base (1-percent annual chance) Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, and/or regulatory floodways (hereinafter referred to as flood hazard determinations) as shown on the indicated Letter of Map Revision (LOMR) for each of the communities listed in the table below are finalized. Each LOMR revises the Flood Insurance Rate Maps (FIRMs), and in some cases the Flood Insurance Study (FIS) reports, currently in effect for the listed communities. The flood hazard determinations modified by each LOMR will be used to calculate flood insurance premium rates for new buildings and their contents.
Changes in Flood Hazard Determinations
Document Number: 2015-15811
Type: Notice
Date: 2015-06-29
Agency: Federal Emergency Management Agency, Department of Homeland Security
New or modified Base (1-percent annual chance) Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, and/or regulatory floodways (hereinafter referred to as flood hazard determinations) as shown on the indicated Letter of Map Revision (LOMR) for each of the communities listed in the table below are finalized. Each LOMR revises the Flood Insurance Rate Maps (FIRMs), and in some cases the Flood Insurance Study (FIS) reports, currently in effect for the listed communities. The flood hazard determinations modified by each LOMR will be used to calculate flood insurance premium rates for new buildings and their contents.
Agency Information Collection Activities: Submission for OMB Review; Comment Request; Application for Community Disaster Loan (CDL) Program
Document Number: 2015-15810
Type: Notice
Date: 2015-06-29
Agency: Federal Emergency Management Agency, Department of Homeland Security
The Federal Emergency Management Agency (FEMA) will submit the information collection abstracted below to the Office of Management and Budget for review and clearance in accordance with the requirements of the Paperwork Reduction Act of 1995. The submission will describe the nature of the information collection, the categories of respondents, the estimated burden (i.e., the time, effort and resources used by respondents to respond) and cost, and the actual data collection instruments FEMA will use.
Changes in Flood Hazard Determinations
Document Number: 2015-15807
Type: Notice
Date: 2015-06-29
Agency: Federal Emergency Management Agency, Department of Homeland Security
New or modified Base (1-percent annual chance) Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, and/or regulatory floodways (hereinafter referred to as flood hazard determinations) as shown on the indicated Letter of Map Revision (LOMR) for each of the communities listed in the table below are finalized. Each LOMR revises the Flood Insurance Rate Maps (FIRMs), and in some cases the Flood Insurance Study (FIS) reports, currently in effect for the listed communities. The flood hazard determinations modified by each LOMR will be used to calculate flood insurance premium rates for new buildings and their contents.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.