Federal Emergency Management Agency February 22, 2011 – Federal Register Recent Federal Regulation Documents
Results 1 - 3 of 3
Final Flood Elevation Determinations
Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).
Proposed Flood Elevation Determinations
On January 7, 2011, FEMA published in the Federal Register a proposed rule that included an erroneous Base Flood Elevation (BFE) for the Skykomish River in Snohomish County, Washington. The BFE currently in effect for the location approximately 216 feet downstream of Burlington Northern Santa Fe Railway should have been listed as 355 feet, referenced to the North American Vertical Datum of 1988.
Suspension of Community Eligibility
This rule identifies communities, where the sale of flood insurance has been authorized under the National Flood Insurance Program (NFIP), that are scheduled for suspension on the effective dates listed within this rule because of noncompliance with the floodplain management requirements of the program. If the Federal Emergency Management Agency (FEMA) receives documentation that the community has adopted the required floodplain management measures prior to the effective suspension date given in this rule, the suspension will not occur and a notice of this will be provided by publication in the Federal Register on a subsequent date.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.