Coast Guard November 27, 2019 – Federal Register Recent Federal Regulation Documents

Port Access Route Study: Approaches to the Chesapeake Bay, Virginia
Document Number: 2019-25757
Type: Notice
Date: 2019-11-27
Agency: Coast Guard, Department of Homeland Security
The Coast Guard is conducting a Port Access Route Study (PARS) to determine whether existing or additional vessel routing measures are necessary in the approaches to the Chesapeake Bay, VA. This PARS will consider whether existing or additional routing measures are necessary to improve navigation safety due to factors such as planned or potential offshore development, current port capabilities and planned improvements, increased vessel traffic, changing vessel traffic patterns, weather conditions, or navigational difficulty. Vessel routing measures are measures aimed at reducing the risk of casualties and include among others, traffic separation schemes, two-way routes, recommended tracks, deep-water routes, precautionary areas, and areas to be avoided. The recommendations of the study may lead to future rulemakings or appropriate international agreements.
Drawbridge Operation Regulation; Wolf River, Winneconne, WI
Document Number: 2019-25616
Type: Rule
Date: 2019-11-27
Agency: Coast Guard, Department of Homeland Security
The Coast Guard is removing the existing drawbridge operation regulation for the Winneconne Highway Bridge, mile 2.4, at Winneconne, WI. The drawbridge was replaced with a fixed bridge through the Coast Guard Bridge Permitting and Public Notice Process in 2018 and the operating regulation is no longer applicable or necessary.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.