Coast Guard August 29, 2018 – Federal Register Recent Federal Regulation Documents
Results 1 - 4 of 4
Safety Zone; San Francisco Giants Fireworks Display, San Francisco Bay, San Francisco, CA
The Coast Guard will enforce the safety zone for the San Francisco Giants Fireworks Display in the Captain of the Port, San Francisco area of responsibility during the dates and times noted below. This action is necessary to protect life and property of the maritime public from the hazards associated with the fireworks display. During the enforcement period, unauthorized persons or vessels are prohibited from entering into, transiting through, or anchoring in the safety zone, unless authorized by the Patrol Commander (PATCOM).
Drawbridge Operation Regulation; Saugatuck River, Saugatuck, CT
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Metro-North SAGA Bridge across the Saugatuck River, mile 1.1 at Saugatuck, Connecticut. The deviation is necessary to conduct bridge maintenance and repair work. The deviation allows the bridge to remain closed to maritime navigation on weekdays and requires the bridge to open with 24 hours advance notice on weekends.
Drawbridge Operation Regulation; Passaic River, Harrison, NJ
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Route 280 Bridge across the Passaic River, mile 5.8, at Harrison, New Jersey. The deviation is necessary to perform steel repairs at the lift span. This deviation allows the bridge to remain closed during the construction period.
Drawbridge Operation Regulation; Sloop Channel, Hempstead, NY
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Meadowbrook State Parkway Bridge across Sloop Channel, mile 12.8, at Hempstead, NY. The deviation is necessary to complete structural, mechanical, and electrical rehabilitations on the bridge. This temporary deviation allows the bridge to remain in the closed-to-navigation position for two short periods, and allows the bridge to open only one bascule span at a time over various periods to facilitate bridge repairs.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.