Coast Guard November 16, 2009 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Drawbridge Operation Regulation; Snohomish River, Steamboat Slough, and Ebey Slough; Everett and Marysville, WA
The Coast Guard proposes to modify the drawbridge operation regulation for the Burlington Northern Santa Fe Railroad drawbridge across Ebey Slough, mile 1.5, in Marysville, Washington so that two- hour notice would be required to open the bridge from 3:30 p.m. to 7 a.m. every day. The bridge will be opened on signal at all other times. The modification is necessary to allow Burlington Northern Santa Fe Railroad to reduce staffing of the bridge during periods requiring infrequent openings. The Coast Guard is also proposing additional minor changes to the drawbridge operation regulations covering the Snohomish River system to delete obsolete requirements.
Drawbridge Operation Regulation; Port of Coos Bay Railroad Bridge, Coos Bay, North Bend, OR
The Coast Guard proposes to modify the drawbridge operation regulation for the Port of Coos Bay Railroad Bridge, Coos Bay, mile 9.0, at North Bend, Oregon by deleting the requirement for special sound signals used in foggy weather and to change the name of the owner. This rule is necessary to make the sound signals used at the bridge consistent with other bridges in the area and to eliminate the unnecessary special sound signals.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.