Department of Homeland Security August 12, 2021 – Federal Register Recent Federal Regulation Documents
Results 1 - 14 of 14
Special Local Regulation; Great South Bay, Brightwaters, NY
The Coast Guard is establishing a temporary special local regulation of certain navigable waters of Great South Bay, from Gilbert Park, Brightwaters, NY to Fire Island Lighthouse, NY for the Maggie Fischer Memorial Cross Bay Swim event. This action is necessary to provide the safety of life on these navigable waters during the swim event on Thursday, August 12, 2021. This rulemaking will prohibit persons and vessels from being in the regulated area unless authorized by the Captain of the Port Long Island Sound or a designated representative.
Agency Information Collection Activities; Extension, Without Change, of a Currently Approved Collection: Application for Permission To Reapply for Admission Into the United States After Deportation or Removal
The Department of Homeland Security (DHS), U.S. Citizenship and Immigration Services (USCIS) invites the general public and other Federal agencies to comment upon this proposed extension of a currently approved collection of information. In accordance with the Paperwork Reduction Act (PRA) of 1995, the information collection notice is published in the Federal Register to obtain comments regarding the nature of the information collection, the categories of respondents, the estimated burden (i.e., the time, effort, and resources used by the respondents to respond), the estimated cost to the respondent, and the actual information collection instruments.
Agency Information Collection Activities; Extension, Without Change, of a Currently Approved Collection: USCIS Case Status Online
The Department of Homeland Security (DHS), U.S. Citizenship and Immigration Services (USCIS) invites the general public and other Federal agencies to comment upon this proposed extension of a currently approved collection of information. In accordance with the Paperwork Reduction Act (PRA) of 1995, the information collection notice is published in the Federal Register to obtain comments regarding the nature of the information collection, the categories of respondents, the estimated burden (i.e., the time, effort, and resources used by the respondents to respond), the estimated cost to the respondent, and the actual information collection instruments.
Final Flood Hazard Determinations
Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM and FIS report are the basis of the floodplain management measures that a community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report are used by insurance agents and others to calculate appropriate flood insurance premium rates for buildings and the contents of those buildings.
Proposed Flood Hazard Determinations
Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report, once effective, will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings.
Changes in Flood Hazard Determinations
This notice lists communities where the addition or modification of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or the regulatory floodway (hereinafter referred to as flood hazard determinations), as shown on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports, prepared by the Federal Emergency Management Agency (FEMA) for each community, is appropriate because of new scientific or technical data. The FIRM, and where applicable, portions of the FIS report, have been revised to reflect these flood hazard determinations through issuance of a Letter of Map Revision (LOMR), in accordance with Federal Regulations. The LOMR will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes, the currently effective community number is shown in the table below and must be used for all new policies and renewals.
Changes in Flood Hazard Determinations
This notice lists communities where the addition or modification of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or the regulatory floodway (hereinafter referred to as flood hazard determinations), as shown on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports, prepared by the Federal Emergency Management Agency (FEMA) for each community, is appropriate because of new scientific or technical data. The FIRM, and where applicable, portions of the FIS report, have been revised to reflect these flood hazard determinations through issuance of a Letter of Map Revision (LOMR), in accordance with Federal Regulations. The LOMR will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings. For rating purposes, the currently effective community number is shown in the table below and must be used for all new policies and renewals.
Changes in Flood Hazard Determinations
New or modified Base (1-percent annual chance) Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, and/or regulatory floodways (hereinafter referred to as flood hazard determinations) as shown on the indicated Letter of Map Revision (LOMR) for each of the communities listed in the table below are finalized. Each LOMR revises the Flood Insurance Rate Maps (FIRMs), and in some cases the Flood Insurance Study (FIS) reports, currently in effect for the listed communities. The flood hazard determinations modified by each LOMR will be used to calculate flood insurance premium rates for new buildings and their contents.
Changes in Flood Hazard Determinations
New or modified Base (1-percent annual chance) Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, and/or regulatory floodways (hereinafter referred to as flood hazard determinations) as shown on the indicated Letter of Map Revision (LOMR) for each of the communities listed in the table below are finalized. Each LOMR revises the Flood Insurance Rate Maps (FIRMs), and in some cases the Flood Insurance Study (FIS) reports, currently in effect for the listed communities. The flood hazard determinations modified by each LOMR will be used to calculate flood insurance premium rates for new buildings and their contents.
Proposed Flood Hazard Determinations
Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report, once effective, will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings.
Proposed Flood Hazard Determinations
Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report, once effective, will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings.
Safety Zone; M/V ZHEN HUA 24, Crane Delivery Operation, Chesapeake Bay and Coastal Virginia
The Coast Guard is proposing to establish a temporary moving safety zone around M/V ZHEN HUA 24 during its transit through certain waters of the Chesapeake Bay and Coastal Virginia. This action is necessary to provide for the safety of life on these navigable waters during the movement of the M/V ZHEN HUA 24 while it is transporting four new Super-Post Panamax container cranes to the Port of Baltimore, anticipated to arrive between September 4, 2021, and September 29, 2021. The Captain of the Port Virginia has determined that limited maneuverability and unique cargo of this vessel are potential hazardous to any person or vessel within the proposed safety zone. This proposed rulemaking would prohibit persons and vessels from being in the safety zone unless authorized by the Captain of the Port Virginia or a designated representative. We invite your comments on this proposed rulemaking.
Guidance on Voluntary Compliance With Training Requirements for Personnel Serving on U.S.-Flagged Passenger Ships That Carry More Than 12 Passengers on International Voyages.
The Coast Guard announces the availability of CG-MMC Policy Letter 02-21, titled ``Guidance on Voluntary Compliance with Training Requirements for Personnel Serving on U.S.-flagged Passenger Ships that Carry More than 12 Passengers on International Voyages.'' This policy provides guidance to passenger vessel owners and operators on voluntary compliance with the 2016 amendments to the International Convention on Standards of Training, Certification and Watchkeeping for Seafarers, 1978, as amended (STCW Convention) and the Seafarers' Training, Certification and Watchkeeping Code (STCW Code). Vessels may be subject to detentions in foreign ports if personnel have not received appropriate training in accordance with the STCW Convention and the STCW Code.
Safety Zone; Ohio River, Owenboro, KY
The Coast Guard is establishing a temporary safety zone from mile marker 756 to 757 of the Ohio River. The safety zone is needed to protect life and the marine environment from potential hazards created by the Owensboro Fireworks and Bridge Lights show display. This temporary final rule would prohibit persons and vessels from entering the safety zone unless authorized by the Captain of the Port Sector Ohio Valley or a designated representative.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.