Department of Homeland Security June 17, 2013 – Federal Register Recent Federal Regulation Documents

Final Flood Hazard Determinations
Document Number: 2013-14297
Type: Notice
Date: 2013-06-17
Agency: Federal Emergency Management Agency, Department of Homeland Security
Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM and FIS report are the basis of the floodplain management measures that a community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report are used by insurance agents and others to calculate appropriate flood insurance premium rates for buildings and the contents of those buildings.
Final Flood Elevation Determinations
Document Number: 2013-14294
Type: Rule
Date: 2013-06-17
Agency: Federal Emergency Management Agency, Department of Homeland Security
Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).
Final Flood Elevation Determinations
Document Number: 2013-14292
Type: Rule
Date: 2013-06-17
Agency: Federal Emergency Management Agency, Department of Homeland Security
Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).
Proposed Flood Hazard Determinations
Document Number: 2013-14288
Type: Notice
Date: 2013-06-17
Agency: Federal Emergency Management Agency, Department of Homeland Security
Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report, once effective, will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings.
Proposed Flood Hazard Determinations
Document Number: 2013-14286
Type: Notice
Date: 2013-06-17
Agency: Federal Emergency Management Agency, Department of Homeland Security
Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report, once effective, will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings.
Proposed Flood Hazard Determinations
Document Number: 2013-14285
Type: Notice
Date: 2013-06-17
Agency: Federal Emergency Management Agency, Department of Homeland Security
Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report, once effective, will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings.
Final Flood Hazard Determinations
Document Number: 2013-14284
Type: Notice
Date: 2013-06-17
Agency: Federal Emergency Management Agency, Department of Homeland Security
Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM and FIS report are the basis of the floodplain management measures that a community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report are used by insurance agents and others to calculate appropriate flood insurance premium rates for buildings and the contents of those buildings.
Final Flood Hazard Determinations
Document Number: 2013-14270
Type: Notice
Date: 2013-06-17
Agency: Federal Emergency Management Agency, Department of Homeland Security
Flood hazard determinations, which may include additions or modifications of Base Flood Elevations (BFEs), base flood depths, Special Flood Hazard Area (SFHA) boundaries or zone designations, or regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM and FIS report are the basis of the floodplain management measures that a community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report are used by insurance agents and others to calculate appropriate flood insurance premium rates for buildings and the contents of those buildings.
Proposed Flood Hazard Determinations
Document Number: 2013-14267
Type: Notice
Date: 2013-06-17
Agency: Federal Emergency Management Agency, Department of Homeland Security
Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report, once effective, will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings.
Proposed Flood Hazard Determinations
Document Number: 2013-14265
Type: Notice
Date: 2013-06-17
Agency: Federal Emergency Management Agency, Department of Homeland Security
Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report, once effective, will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings.
Proposed Flood Hazard Determinations
Document Number: 2013-14264
Type: Notice
Date: 2013-06-17
Agency: Federal Emergency Management Agency, Department of Homeland Security
Comments are requested on proposed flood hazard determinations, which may include additions or modifications of any Base Flood Elevation (BFE), base flood depth, Special Flood Hazard Area (SFHA) boundary or zone designation, or regulatory floodway on the Flood Insurance Rate Maps (FIRMs), and where applicable, in the supporting Flood Insurance Study (FIS) reports for the communities listed in the table below. The purpose of this notice is to seek general information and comment regarding the preliminary FIRM, and where applicable, the FIS report that the Federal Emergency Management Agency (FEMA) has provided to the affected communities. The FIRM and FIS report are the basis of the floodplain management measures that the community is required either to adopt or to show evidence of having in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP). In addition, the FIRM and FIS report, once effective, will be used by insurance agents and others to calculate appropriate flood insurance premium rates for new buildings and the contents of those buildings.
Safety Zone; Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship Canal, Chicago River, and Calumet-Saganashkee Channel, Chicago, IL
Document Number: 2013-14246
Type: Rule
Date: 2013-06-17
Agency: Coast Guard, Department of Homeland Security
The Coast Guard will enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal, Chicago River, Calumet-Saganashkee Channel on all waters of the Chicago Sanitary and Ship Canal from Mile Marker 302.6 to Mile Marker 302.8 from 7 a.m. to 11 a.m. and from 1 p.m. until 3 p.m. on June 18, 2013. This action is necessary to protect the waterways, waterway users, and vessels from the hazards associated with the United States Geological Survey (USGS) dive operations. During the enforcement period listed below, entry into, transiting, mooring, laying-up or anchoring within the enforced area of this safety zone by any person or vessel is prohibited unless authorized by the Captain of the Port, Lake Michigan, or his or her designated representative.
Availability of Application for the Proposal To Replace the Existing Movable I-5 Bridge Across the Columbia River With a Fixed Multi-Use Bridge Which Will Accommodate Vehicular, Light Rail, Pedestrian and Bicycle Traffic and Will Be Called the Columbia River Crossing; Correction
Document Number: 2013-14245
Type: Notice
Date: 2013-06-17
Agency: Coast Guard, Department of Homeland Security
The Coast Guard published a document in the Federal Register on May 6, 2013, concerning a request for comments on the availability of bridge permit application materials for the Columbia River Crossing. The document contained an incorrect phone number for the Columbia River Crossing Project Manager.
Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship Canal, Chicago River, and Calumet-Saganashkee Channel, Chicago, IL
Document Number: 2013-14244
Type: Rule
Date: 2013-06-17
Agency: Coast Guard, Department of Homeland Security
The Coast Guard will enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal, Chicago River, Calumet-Saganashkee Channel on all waters of the Chicago Sanitary and Ship Canal from Mile Marker 296.1 to Mile Marker 296.7 at various times on each day from June 17 through June 21, 2013. This action is necessary to protect the waterways, waterway users, and vessels from the hazards associated with the U.S. Army Corps of Engineers dispersal barriers performance testing. During any of the below listed enforcement periods, entry into, transiting, mooring, laying-up or anchoring within the enforced area of this safety zone by any person or vessel is prohibited unless authorized by the Captain of the Port, Lake Michigan, or his or her designated representative.
Extension of Employment Authorization for Syrian F-1 Nonimmigrant Students Experiencing Severe Economic Hardship as a Direct Result of Civil Unrest in Syria Since March 2011
Document Number: 2013-14102
Type: Notice
Date: 2013-06-17
Agency: Department of Homeland Security
This notice informs the public of the extension of an earlier notice, which suspended certain requirements for F-1 nonimmigrant students whose country of citizenship is Syria and who are experiencing severe economic hardship as a direct result of the civil unrest in Syria since March 2011. This notice extends the effective date of that notice.
Extension and Redesignation of Syria for Temporary Protected Status
Document Number: 2013-14101
Type: Notice
Date: 2013-06-17
Agency: Department of Homeland Security, U.S. Citizenship and Immigration Services
Through this Notice, the Department of Homeland Security (DHS) announces that the Secretary of Homeland Security (Secretary) is extending the existing designation of Syria for Temporary Protected Status (TPS) for 18 months, from October 1, 2013 through March 31, 2015, and redesignating Syria for TPS for 18 months, effective October 1, 2013 through March 31, 2015. The extension allows currently eligible TPS beneficiaries to retain TPS through March 31, 2015 so long as they otherwise continue to meet the terms and conditions of TPS status. The redesignation of Syria allows additional individuals who have been continuously residing in the United States since June 17, 2013 to obtain TPS, if otherwise eligible. The Secretary has determined that an extension and redesignation are warranted because the extraordinary and temporary conditions in Syria that prompted the 2012 TPS designation have not only persisted, but have deteriorated, and because there is now an on- going armed conflict in Syria that would pose a serious threat to the personal safety of Syrian nationals if they were required to return to their country. Through this Notice, DHS also sets forth procedures necessary for nationals of Syria (or aliens having no nationality who last habitually resided in Syria) either to: (1) Re-register under the extension if they already have TPS and to apply for renewal of their Employment Authorization Documents (EADs) with U.S. Citizenship and Immigration Services (USCIS); or (2) submit an initial registration application under the redesignation and apply for an EAD. For individuals who have already been granted TPS under the original Syria designation, the 60-day re-registration period runs from June 17, 2013 through August 16, 2013. USCIS will issue new EADs with a March 31, 2015 expiration date to eligible Syrian TPS beneficiaries who timely re-register and apply for EADs under this extension. Under the redesignation, individuals who currently do not have TPS (or an initial TPS application pending) may submit an initial application during the 180-day initial registration period that runs from June 17, 2013 through December 16, 2013. In addition to demonstrating continuous residence in the United States since June 17, 2013 and meeting other eligibility criteria, initial applicants for TPS under this redesignation must demonstrate that they have been continuously physically present in the United States since October 1, 2013, the effective date of the redesignation of Syria, before USCIS can finally grant them TPS. TPS applications that were filed during the original Syria designation that opened on March 29, 2012, and remain pending on June 17, 2013 will be treated as initial applications under the redesignation. Therefore, individuals who have a pending TPS application will not need to file a new Application for Temporary Protected Status (Form I-821). DHS provides additional instructions in this Notice for individuals whose TPS applications remain pending and who would like to obtain an EAD valid through March 31, 2015.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.