Department of Homeland Security March 6, 2006 – Federal Register Recent Federal Regulation Documents
Results 1 - 2 of 2
Beacon Port Liquefied Natural Gas Deepwater Port License Application; Draft Environmental Impact Statement
The Coast Guard and the Maritime Administration (MARAD) announce the availability of the draft environmental impact statement (DEIS) for this license application. The application describes a project that would be located in the Gulf of Mexico, in lease block High Island Area 27, on the outer Continental Shelf (OCS). The Main Terminal would be located approximately 45 miles South of High Island and 50 miles East-Southeast of Galveston, Texas, with a riser platform in lease block West Cameron 167, approximately 27 miles South of Holly Beach and 29 miles South-Southeast of Johnson's Bayou, Louisiana. The Coast Guard and MARAD request public comments on the DEIS.
Drawbridge Operation Regulations; Connecticut River, East Haddam, CT
The Coast Guard proposes to temporarily change the drawbridge operating regulations governing the operation of the Route 82 Bridge, mile 16.8, across the Connecticut River at East Haddam, Connecticut. This proposed rule would allow the Route 82 Bridge to operate on a fixed opening schedule from April 1, 2006 through June 30, 2006. The bridge would open at all times for commercial vessels after at least a 24-hour advance notice and a 2-hour confirmation is given by calling the number posted at the bridge. This rule is necessary to facilitate rehabilitation construction at the bridge.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.