Western Area Power Administration August 26, 2024 – Federal Register Recent Federal Regulation Documents

Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-217
Document Number: 2024-19080
Type: Notice
Date: 2024-08-26
Agency: Department of Energy, Western Area Power Administration
The Upper Great Plains (UGP) region of the Western Area Power Administration (WAPA or Western) proposes to extend existing formula rates (without any changes) for the Pick-Sloan Missouri Basin Program Eastern Division (P-SMBPED) through September 30, 2030. The existing rates UGP proposes to extend are: WAUGP-ATRR (Annual Transmission Revenue Requirement), WAUGP-AS1 (Scheduling, System Control, and Dispatch Service), WAUW-AS3 (Regulation and Frequency Response Service), WAUW-AS4 (Energy Imbalance Service), WAUW-AS5 (Operating Reserve-Spinning Reserve Service), WAUW-AS6 (Operating Reserve- Supplemental Reserve Service), and WAUW-AS7 (Generator Imbalance Service). The existing rates expire on September 30, 2025.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.