Western Area Power Administration February 2024 – Federal Register Recent Federal Regulation Documents
Results 1 - 1 of 1
Loveland Area Projects, Western Area Colorado Missouri Balancing Authority, and Colorado River Storage Project-Rate Order No. WAPA-214
The Rocky Mountain Region (RM) of the Western Area Power Administration (WAPA) proposes to extend existing formula rates (without any changes) for the Loveland Area Projects (LAP), the Western Area Colorado Missouri Balancing Authority (WACM), and the Colorado River Storage Project (CRSP) through September 30, 2026. The existing rates RM proposes to extend are: L-NT1 (network), L-FPT1 (firm point- to- point), L-NFPT1 (non-firm point-to-point), L-NFJDT (joint dispatch transmission), L-UU1 (unreserved use), L-AS1 (scheduling and dispatch), L-AS2 (reactive supply and voltage control (VAR) support), L-AS3 (regulation), L-AS4 (energy imbalance), L-AS5 (spinning reserves), L- AS6 (supplemental reserves), L-AS7 (balancing authority (BA) real power losses), and L-AS9 (generator imbalance). The existing rates expire on September 30, 2024.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.