Western Area Power Administration August 2022 – Federal Register Recent Federal Regulation Documents

Request for Statements of Interest Regarding the WAPA Transmission System in the Area of Boulder City, Nevada
Document Number: 2022-18080
Type: Notice
Date: 2022-08-23
Agency: Department of Energy, Western Area Power Administration
Western Area Power Administration (WAPA), a Federal power marketing administration of the Department of Energy (DOE), is evaluating options that could reduce congestion on its transmission system and facilitate the interconnection and/or transmittal of energy, including renewable generation, in southern Nevada. WAPA is requesting statements of interest (SOI) from entities that are interested in participating with WAPA to upgrade or construct new transmission facilities for WAPA's transmission system, or taking transmission service on or interconnecting with upgraded or newly constructed facilities, in the area of Boulder City, Nevada. WAPA's transmission system in the area of Boulder City, Nevada includes Mead Substation, a significant regional trading hub for energy.
2025 Resource Pool-Loveland Area Projects, Final Power Allocation
Document Number: 2022-17722
Type: Notice
Date: 2022-08-18
Agency: Department of Energy, Western Area Power Administration
Western Area Power Administration (WAPA), a Federal Power Marketing Administration of the Department of Energy (DOE), announces its Loveland Area Projects (LAP) 2025 Resource Pool final power allocation. WAPA developed the final power allocation under the requirements of subpart C-Power Marketing Initiative of the Energy Planning and Management Program (Program) Final Rule and WAPA's LAP 2025 Power Marketing Initiative (2025 PMI), as published in the Federal Register on December 30, 2013. The final power allocations are established prior to the contractual phase of the 2025 Resource Pool process. Firm electric service contracts negotiated between WAPA and eligible allottees will permit delivery of hydroelectric power beginning October 1, 2024, through September 30, 2054.
Washoe Project, Stampede Division-Rate Order No. WAPA-201
Document Number: 2022-16629
Type: Notice
Date: 2022-08-03
Agency: Department of Energy, Western Area Power Administration
The non-firm power formula rate for the Washoe Project, Stampede Division (Provisional Formula Rate) has been confirmed, approved, and placed into effect on an interim basis. The Provisional Formula Rate is unchanged from the existing Washoe Project formula rate in Rate Schedule SNF-7, which expires on September 30, 2022.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.