Washoe Project, Stampede Division-Rate Order No. WAPA-201
The non-firm power formula rate for the Washoe Project, Stampede Division (Provisional Formula Rate) has been confirmed, approved, and placed into effect on an interim basis. The Provisional Formula Rate is unchanged from the existing Washoe Project formula rate in Rate Schedule SNF-7, which expires on September 30, 2022.