Western Area Power Administration January 2017 – Federal Register Recent Federal Regulation Documents

Colusa-Sutter 500-Kilovolt Transmission Line Project, Colusa, Sutter, Yolo and Sacramento Counties, California
Document Number: 2017-00053
Type: Notice
Date: 2017-01-06
Agency: Department of Energy, Western Area Power Administration
On December 18, 2015, Western Area Power Administration (WAPA), an agency of the Department of Energy (DOE), announced the Notice of Intent to prepare an Environmental Impact Statement/ Environmental Impact Report (EIS/EIR) for the proposed 500-kilovolt (kV) transmission line. This proposed Project is known as the Colusa- Sutter (CoSu) 500-kV Transmission Line Project. In that previous notice, WAPA described the schedule for scoping meetings and advised the public that comments on the scope of the EIS/EIR were due by February 16, 2016. On February 5, 2016, an additional notice was published extending the due date for comments on the scope of the EIS/ EIR to April 18, 2016. By this notice, WAPA announces additional public scoping meetings and reopens the period for submitting comments on the scope of the EIS/EIR.
Washoe Project-Rate Order No. WAPA-176
Document Number: 2016-31973
Type: Notice
Date: 2017-01-05
Agency: Department of Energy, Western Area Power Administration
The Deputy Secretary of Energy extended, on an interim basis, the existing Washoe Project, Stampede Division, Non-Firm Power Formula Rate, effective October 1, 2017, through September 30, 2022. The existing Non-Firm Power Formula Rate Schedule SNF-7 expires on September 30, 2017. The extended formula rate will be in effect on an interim basis until the Federal Energy Regulatory Commission (FERC) approves the extension on a final basis, or until superseded.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.