Western Area Power Administration February 3, 2016 – Federal Register Recent Federal Regulation Documents

Rocky Mountain Region Transmission, Ancillary Services, and Sale of Surplus Products-Rate Order No. WAPA-174
Document Number: 2016-02035
Type: Notice
Date: 2016-02-03
Agency: Department of Energy, Western Area Power Administration
The Western Area Power Administration (Western) Loveland Area Projects' (LAP) Transmission and Western Area Colorado Missouri Balancing Authority's (WACM) Ancillary Services formula rates under Rate Schedules L-NT1, L-FPT1, L-NFPT1, L-AS1, L-AS2, L-AS3, L-AS4, L- AS5, L-AS6, L-AS7, L-AS9, and L-UU1 expire on September 30, 2016. Western is proposing modifications to the existing formula rate schedules and also is proposing to add a new rate schedule, referred to as ``LAP Marketing Sale of Surplus Products, L-M1.'' Western has prepared a brochure that provides detailed information on the proposed formula rates. If adopted, the proposed formula rates, under Rate Schedules L-NT1, L-FPT1, L-NFPT1, L-AS1, L-AS2, L-AS3, L-AS4, L-AS5, L- AS6, L-AS7, L-AS9, L-UU1, and L-M1, will become effective October 1, 2016, and will remain in effect through September 30, 2021, or until superseded. Publication of this Federal Register notice (FRN) begins the formal process for consideration of the proposed formula rates.
Desert Southwest Customer Service Region Network Integration Transmission Service and Ancillary Services-Rate Order No. WAPA-175
Document Number: 2016-01977
Type: Notice
Date: 2016-02-03
Agency: Department of Energy, Western Area Power Administration
The Western Area Power Administration (Western) Parker-Davis (P-DP) and Pacific Northwest-Pacific Southwest Intertie (Intertie) Projects' Network Integration Transmission Service (NITS) formula rates under Rate Schedules PD-NTS3, INT-NTS3 and Western Area Lower Colorado Balancing Authority's (WALC) Ancillary Services formula rates under Rate Schedules DSW-SD3, DSW-RS3, DSW-FR3, DSW-EI3, DSW-GI1, DSW-SPR3, and DSW-SUR3 expire on September 30, 2016. Western is proposing modifications to the existing formula rate schedules and adding two new rate schedules, referred to as Transmission Losses Services (DSW-TL1) and Penalty Rate for Unreserved Use of Transmission Service (DSW-UU1). Western will prepare a brochure that provides detailed information on the proposed formula rates. If adopted, the proposed formula rates, under Rate Schedules PD-NTS4, INT-NTS4, DSW-TL1, DSW-UU1, DSW-SD4, DSW- RS4, DSW-FR4, DSW-EI4, DSW-GI2, DSW-SPR4, and DSW-SUR4 will become effective October 1, 2016, and will remain in effect through September 30, 2021, or until superseded. Publication of this Federal Register notice (FRN) begins the formal process for the proposed formula rates.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.