Western Area Power Administration June 5, 2015 – Federal Register Recent Federal Regulation Documents
Results 1 - 1 of 1
Record of Decision for the South Mountain Freeway (Loop 202) (DOE-EIS 0417)
The Federal Highway Administration (FHWA) prepared an Environmental Impact Statement (EIS) (DOE/EIS-0417) for the construction of the proposed South Mountain Freeway (Loop 202) (Project), from the east-west alignment of Interstate 10 (Papago Freeway) to north-south alignment of Interstate 10 (Maricopa Freeway). The Project is located in the Greater Metropolitan Phoenix Area, southwest of the City of Phoenix in Maricopa County, Arizona. Western Area Power Administration (Western) was a cooperating agency in FHWA's EIS process. The FHWA selected a combination of the alternatives W59 and E1 as described in the EIS as their selected alternative in their Record of Decision (ROD). FHWA's selected alternative requires Western to issue letter agreements for two crossings of its transmission rights-of-way, and to modify its transmission system and facilities at these crossing locations to accommodate the construction of the Project.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.