Searchlight Wind Energy Project Record of Decision (DOE/EIS-0413)
Western Area Power Administration (Western), an agency within the U.S. Department of Energy (DOE), received a request from Searchlight Wind Energy, LLC (Searchlight) to interconnect its proposed Searchlight Wind Energy Project (Project) to Western's Davis-Mead 230- kilovolt (kV) transmission line. The Project would be located in southern Clark County, Nevada, near the town of Searchlight. On December 14, 2012, the Notice of Availability of the Final Environmental Impact Statement (EIS) for Searchlight Wind Energy Project was published in the Federal Register (77 FR 74479). The U.S. Department of Interior, Bureau of Land Management (BLM) was the lead Federal agency for the EIS. Western was a cooperating agency in preparation of the EIS. After considering the environmental impacts, Western has decided to allow Searchlight's request for interconnection to Western's transmission system on its Davis-Mead transmission line and to construct, own, and operate a new switching station to accommodate the interconnection.
Quartzsite Solar Energy Project Record of Decision (DOE/EIS-0440)
Western Area Power Administration (Western), an agency within the U.S. Department of Energy (DOE), received a request from Quartzsite Solar Energy, LLC (QSE) to interconnect its proposed Quartzsite Solar Energy Project (Project) to Western's Bouse-Kofa 161-kilovolt (kV) transmission line. The proposed Project site is in an undeveloped area in La Paz County, Arizona, east of State Route (SR) 95, approximately 10 miles north of Quartzsite, Arizona, on lands administered by the U.S. Department of Interior, Bureau of Land Management (BLM). On December 21, 2012, the Notice of Availability of the Final Environmental Impact Statement (EIS) and Yuma Field Office (Yuma) Proposed Resource Management Plan Amendment (PRMPA) for Quartzsite Solar Energy Project was published in the Federal Register (77 FR 75632). After considering the environmental impacts, Western has decided to allow QSE's request for interconnection to Western's transmission system on the Bouse-Kofa 161-kV transmission line and to construct, own, and operate a new switchyard and its associated communication pathway.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.